بابكر الصديق عبد الحليم شكاك شكاك, Operation and maintenance manager

بابكر الصديق عبد الحليم شكاك شكاك

Operation and maintenance manager

Petrodar Oil Operating Company P.D.OC

البلد
السودان - سنجة
التعليم
بكالوريوس, Mechanical engineering
الخبرات
40 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :40 years, 0 أشهر

Operation and maintenance manager في Petrodar Oil Operating Company P.D.OC
  • السودان
  • يناير 2006 إلى أغسطس 2012

a- Making the annual operating plan for the plant in order to achieve the target of satisfying the consumer demand for power to carry out all production activities in site together with other services. From this operating plan the cost of all relevant activities and materials such as fuel, lubricants, spare parts and consumables are calculated, that makes the annual budget for the year.
b- Following up and executing the drawn plan by sticking to running the plant as scheduled in order to avoid any deviation that would make differences in the budget. Also making amendments to the plan whenever any discrepancies occur for any reasons.
c- Managing the maintenance activities which result from implementing the annual plan which mainly consisted of preventive maintenance ranging from light to heavy overhauls. This is done according to the equipment manufacturer manual instructions.
d- Dealing with corrective maintenance activities that concern fixing the problems resulting from any irregularities during running which may occur at any particular part of the plant.
e- Raising reports concerning all activities of the plant such as daily, weekly, monthly and annual reports. Beside that there other reports dealing with the arising problems during operation, with suggestions of solutions or enquiring to have solutions or to make necessitated modifications that lead to plant performance improvement. Such reports are made of course after scientific study with the concerned engineers.
f- Safety of the plant is considered to be the top priority of the management, so that the plant O&M manager must devote a large area of his responsibilities to take all measures to implement safety regulations in order to guarantee safety of the plant and all working staff.
g- To coordinate with other departments in issues relevant to power plant.

Mechanical Maintenance Engineer في Greater Nile Operating Oil company. G.N.P.O.C
  • السودان
  • نوفمبر 1999 إلى سبتمبر 2002

I joined GNPOC as a contractor mechanical engineer. During that period I was responsible for pumping station No3 which consists, of pumping units of diesel-crude oil operated engines, crude pumps, electrical generators, air Compressors, water pumps, well pumps, and their auxiliaries. I was responsible for carrying out the preventive and corrective maintenance of the mechanical equipment of the whole station. This included scheduling to forecast for the necessary spare parts needed relevant for every type of maintenance level. Also raising reports about all activities and analyzing the performance of the site. Beside all that I was the head safety team.

Plant Manager في National Electricity Corporation ( N.E.C)
  • السودان
  • سبتمبر 1988 إلى سبتمبر 1999

During this period I was the manager of Wad Medani thermal power station of National Electricity Corporation ( N.E.C) which consisted of the diesel-furnace run engines generating units. My work and responsibilities were as follows:-
a- Operating maintaining and managing the plant. This included carrying out light and heavy overhauls. That of course included planning, preparing, supervising and execution of the maintenance whether it was light or heavy overhaul, preventive or corrective maintenance.
b- Managing the staff besides supervising the performance of the technical staff to avoid any malfunctioning of the plant and also taking the responsibilities of official work.
c- Preparing the needed spare parts for the plant to keep it running without stopping or break down and efficiently as possible.
d- Drawing the annual budget for the plant with the cost of all activities together with the expenses of spare parts, fuel, lubricating oil and other relevant matters in order to obtain an economical performance.
e- Monitoring and controlling the operation of dismantling and assembly of the machineries during overhauling and maintenance.
f- To implement safety regulations taking all necessary precautions and measures to keep the plant and working people as safe as possible.
g- Raising reports to the headquarter including the data of plant performance and the problems if there were any with suggestions of solutions for them either that was in technical or management sides.
h- Beside the above I was also able to do some modifications to improve the efficiency of the plant. That was done by replacing four Turbo chargers by others brought from another station. The brought turbo chargers needed to have some modifications to be done for the fittings in order to suit our engines. The modifications were made and the turbo-chargers were fitted to our engines the result of which was a comprehensive improvement of the plant efficiency.
Also I made similar things to couple an alternator of different shape and model to suit one of our engine whose its initial alternator was burnt.
From the above it seems that my work was not only to run and manage the plant as prescribed by the manufacturer but also to seek for necessary possibilities to make modification to improve the performance of the plant.

planning and efficiency chief engineer في National Electricity Corporation ( N.E.C
  • السودان
  • يونيو 1985 إلى أغسطس 1988

At this period I was holding the post of planning and efficiency chief engineer at Sennar hydro-power station (NEC) which consisted of Kaplan water turbines prime movers. The specifications of the job were mainly as follows:-
a- Making plans to carry out the scheduled maintenance of mechanical equipment of the plant which consisted of water turbines prime movers with their auxiliaries and also to carry out corrective maintenance.
b- Tracing the performance of the plant as a whole and checking for efficiency.
c- Finding out reasons for any efficiency declines and work to cure them in order to keep the plant running as efficient as possible and at same time to minimize the break down by taking the necessary precautions to avoid that. This was done by strictly sticking to carry out the preventive maintenance as prescribed by the equipment Manufacturer.
d- Preparing the needed spare for the plant.
e- Supervising the maintenance execution and making checks and revises to confirm the correctness of carrying out the maintenance operation.
f- Participating positively in the safety committee of the plant.
g- Raising technical reports to the head quarter containing the cost of Generating the KWh.

Shift Operation Engineer في National Electricity Corporation ( N.E.C
  • السودان
  • مايو 1982 إلى يونيو 1985

During that period I held the post of shift operation engineer at Sennar hydro-power station (N.E.C). My work was to control and supervise the operation of the plant as was directed by the control dispatch Centre in Khartoum. So my work was mainly to execute instructions and to avoid malfunctioning of the plant. Beside that also to prepare the daily report which included data such as the daily generated power, quantity of water consumed daily, efficiency of the plant and reporting any problem... etc.

Water engineer في Common Elecricity & Water Corporation
  • السودان
  • سبتمبر 1981 إلى أبريل 1982

At that time I worked in the post of Water engineer with common electricity and water corporation (C.E.W.C) at the head quarter at Wad Medani town. I worked as a mechanical engineer and carried out works that concerned solving problems of the water network pipes, and water consumption meters together with other technical water works problems. I travelled to many towns such as Kosti, Eldueim, Hassaheasa, and Singa. That area now includes four States (Gezira, White Nile, Sennar and Blue Nile). I contributed in solving problems arising from management and performance in those plants.

Engineering student في Leeds Polytechnic U,k
  • المملكة المتحدة
  • أكتوبر 1979 إلى يوليو 1981

I was sent by C.E.W.C to U.K to spend two years study course at Leeds polytechnic from which I have been awarded the following Certificates:
1- Leeds polytechnic diploma in mechanical engineering.
2- Leeds polytechnic postgraduate diploma in mechanical production engineering.

Mechanical engineer في common Elctricity & Water corporation
  • السودان
  • أغسطس 1973 إلى سبتمبر 1979

During that period I participated in the erection of the mechanical equipment of the new plant extension which were diesel engines with their auxiliaries that gave me a good experience in practical applications of wide range in mechanical engineering practice and how to deal with and tackle their Problems of installing, erection and keeping plant running efficiently although my main job was operation and maintenance engineer.

Assistant Mechanical Engineer في Common Electricity & Water Corporation
  • السودان
  • يوليو 1971 إلى أغسطس 1973

1971-1973
During that period I worked as an assistant mechanical engineer at Kosti town in the construction of the town water works extension. That extension included new water clarifier, water filters, new water pumps, and the execution of extension of the water pipes net. I gained a good experience in dealing with water engineering equipment either in water purification or distribution plants.

Assistant Mechanical Engineer في Ministry of works
  • السودان - الخرطوم
  • أبريل 1969 إلى يوليو 1971

I was posted as an assistant mechanical engineer. At that time the mechanical engineer could work at any mechanical position either it was in electricity generation or water plant because at that time Ministry of works was responsible for almost all the water and electricity works in Sudan and it was called public utilities.
At that time also I participated in the new water extension work at Eldueim town such as water clarifier, filters and water pumps with both high and Iwo heads. Also I participated in doing the water pipes net works from design to construction.
The authorities were very keen to train the engineers in order to have experience in many other fields related to its main function which was supplying water and electricity. So from that logic I was given opportunities to have some practice in the following:-
a- Automobile maintenance.
b- Accounting.
c- Store and stock control and keeping.
d- Workshops.
e- Office and management work.

الخلفية التعليمية

بكالوريوس, Mechanical engineering
  • في LEEDS POLYTECHNIC
  • يوليو 1981
دبلوم عالي, Design And Mechanical Engineering
  • في Leeds Polytechnic
  • يوليو 1981

الدراسة كانت للدبلوم فوق الجامعى فى الهندسة الميكانيكية عامة .

بكالوريوس, Mechanical engineering
  • في Khartoum Polytechnic
  • أبريل 1969

All subjects of fundamental mechanical engineering.

Specialties & Skills

Engineering
Public Administration
الرسم الفنى الخاص بالهندسة الميكانيكية
الحاسووب برنامج اكسل
تدريب الكوادر
ألإدارة العامة

اللغات

الانجليزية
متمرّس

العضويات

الهيئة القومية للكهرباء
  • إدارى مهنى
  • May 1972

التدريب و الشهادات

Leeds Polytechnic Postgraduate Diploma (الشهادة)
تاريخ الدورة:
October 1979
صالحة لغاية:
July 1981