Construction Manager
Al-Marri & Sons CO
Total years of experience :12 years, 2 Months
06.2012 up to date Construction Manager 24" Natural Gas Transmission System to SWCC Alkhobar Desalination Plant. Rajeh.H. Al-Marri & Sons CO.
Achievement
- Controls and coordinates all work activities carried out in the construction site.
- Establishment and implementation of the procedures for execution work.
- Cooperation in the definition and updating of the detailed construction schedule, including re-designation of priorities where necessary.
- Control and coordination of the work entrusted to sub-contractors.
- Planning and scheduling of the work force and equipment demand.
- Cooperation in definition of the materials delivery schedule.
- Preparation of data required for compilation of the work progress report.
- Assistance to the project manager in discussion with SWCC
07.2010 - 05.2012 Site construction manager of Kosti Thermal Power Plant Project \{500 MW\} National Electricity Corporation-Sudan
Achievement
- Reviewed the technical specification and drawing for approval and participated in design approval meeting.
- Witnessed the main equipment workshop tests \[team turbine, Boiler, valve's pumps\].
- Head of boiler department during design approval.
- Design & Installation of complete Fire Protection system.
- Design & Installation on HVAC
• Chilled water type air conditioning Plant.
• Split/window type air conditioners
• Ventilation system for power house building
• Ventilation system for Auxiliary building
- mechanical team leader during erection
04.07 - 06.010 Senior mechanical engineer Kosti Thermal Power Plant Project \{500 MW\} National Electricity Corporation-Sudan
Achievement
-reviewed the technical specification and drawing for approval andparticipated in design approval meeting.
- witnessed the main equipments workshop tests \[team turbine, Boiler, valve's pumps\].
- Head of boiler department during design approval.
- mechanical team leader during erection
01.04-03.07 Mechanical maintenance engineer Garri 1 Combined Cycle power plant \{200 MW\} National Electricity Corporation-Sudan
Achievement
- Planning and implementing the preventive maintenance, corrective maintenance and routine maintenance for combined cycle components.
-Planned & supervised the annual maintenance program for gas turbine, steam turbine and heat recovery steam generator.
- Leader of the Gas Turbine maintenance team.
- Maintenance of power plant Auxiliaries: • HVAC maintenance
• Cooling water system maintenance.
• Firefighting system maintenance
• Pipeline Water supply to plant
• Head recovery Steam Generator maintenance.
Fuel (LPG & Diesel) system maintenance.
06.02-12.03
Project Mechanical Engineer
Garri 1 Combined Cycle Power Plant Project \{200 MW\}
National Electricity Corporation-Sudan
Achievement
-Supervised the erection activities of the main combined cycle equipment \[4 GT, 4HRSG, 4ST\].
- Leader of Gas turbine commissioning team.
- participate on commissioning and performance test.
-Guarantee period engineer.
01.01 -05.02
Gas Turbine Maintenance&operation Engineer
Khartoum North Gas Turbine \{90 MW\}
National Electricity Corporation-Sudan
Achievement
-Planned & implemented preventive maintenance, corrective maintenance and routine maintenance for four (4) unit steam turbine and auxiliaries.
- Planned & implemented the annual maintenance program including the spare parts order, maintenance program for each component and supervised the maintenance execution.
02.00 - 12.01 Hydro power plant Maintenance Engineer Rosirs Hydro power Plant \{280 MW\} National Electricity Corporation-Sudan
Achievement
-Planned & implemented preventive maintenance, corrective maintenance and routine maintenance for four (7) unit Hydro turbine and auxiliaries.
12.99 - 02.00 Steam Turbine Maintenance Engineer Khartoum North Steam Turbine \{180 MW\} National Electricity Corporation-Sudan
Achievement
-Planned & implemented preventive maintenance, corrective maintenance and routine maintenance for four (4) unit Steam turbine and auxiliaries.
Skill
2007 University of Juba Master of Science in Business Administration (MBA)
2006 University of Juba Post Graduate Diploma in Business Administration
1998 University Of Khartoum Faculty of Engineering and Architecture BSC (honour- Division two) in mechanical engineer Expertise Professional Work Experience in Summary Category Subcategory Ability/Experience Combine cycle power plant Projects, Maintenance/ Technical Strong Experienced Gas Turbine Projects, /Safety Operation/maintenance Strong Experienced Boiler Projects, Engineering/ construction Experienced Pipe Line Construction/ Technical, Project/Management Strong Experienced Project Management Engineering/CONSTRUCTION Experienced Places Worked Power plant, Gas Turbine Boiler and Pipe line Construction Etc. Saudi, Sudan