Work Experience

Total years of experience :37 years, 6 Months

Senior Architectural at Dar al handasah
  • Egypt - Cairo
  • My current job since March 2015

• Review and Coordinate all shop drawings and documents through all disciplines such as, structural, architectural, electrical, mechanical, landscaping, external works and other special construction and equipment.
• Ability to resolve problems effectively and clearly communicate results desired and effectively involve co-workers in problem resolution in order to develop and retain a team atmosphere.
• Participation in regular meetings for management and contractors when required
• Ability to resolve problems effectively and clearly communicate results desired and effectively involve co-workers in problem resolution in order to develop and retain a team atmosphere.
• Work collaboratively with managers to ensure project(s) is/are procured and constructed within
• Review and approval method statement, all materials, samples, manufacturing data, material sources, shop drawing, interim payment certificates, and fabrication drawing submitted by the contractor, construction works.
• Supervise on-site installations, subsequent testing, equipment and systems.
• Review As-Built drawings. Operations, Maintenance manuals, and spare parts lists then hand-over to Owner upon project completion.
• Complete other responsibilities as assigned
…For all projects described hereunder: -
1) The New Dar Al Fouad Hospital building is located at Naser city -Cairo
With approximate built‐up area 65, 000 m² (except the basement floors) and approximately 6, 000 m²
Building footprint. The Project consists of 3 basements (B1, B2 & B3), ground floor, 8 floors, and roof.
Is divided into two main components:
- 1st component is a 5 star hospital with a capacity of 158 beds including 37 for intensive care units (ICU),
7 operating theatres and others
- 2nd component is a medical tower which contains 220 medical clinics
Constructed including finishes, fixtures and fittings.
2) Makah Haram Expansion project in K.S.A the project composed of the Third Saudi Extension Building with three praying floors and roofs, in addition to the basement, which compiles toilets, ablutions and the electromechanical services. Increasing the outdoor Piazzas and open praying areas, leading to the service building and terraces in a distance 660 meters from Kaaba. Bridges will be connecting the existing Haram and the Third Saudi Extension with the service building.

Components
1- The Third Saudi Extension Building.
2- The Piazzas & Bridges.
3- The Service Building. (Piazza terraces and Administrative buildings).

Architectural MANAGER at ECG Engineering Consultant Group,Cairo,Egypt
  • Egypt - Cairo
  • March 2008 to March 2015

Responsibilities & Duties as a" Architectural MANAGER" were as follow: -
• Review and Coordinate all drawings and documents through all disciplines such as, structural, architectural, electrical, mechanical, landscaping, external works and other special construction and equipment.
• Participation in regular meetings for management and contractors when required
• Ability to resolve problems effectively and clearly communicate results desired and effectively involve co-workers in problem resolution in order to develop and retain a team atmosphere.
• Work collaboratively with managers to ensure project(s) is/are procured and constructed within
• Review and approval method statement, all materials, samples, manufacturing data, material sources, shop drawing, and fabrication drawing submitted by the contractor, construction works. And Advise Owner of any issues and problems.
• Complete other responsibilities as assigned
• Develop and maintain harmonious relationships with contractors, co-workers, vendors, suppliers, and community stakeholders.-
…For all projects described here under: -
• Cairo Festival City (CFC) Project Al-Futtaim Real Estate Development SAE:-
-The CFC - Festival Centre as a whole shall consist of a curved mall building and a retail village allowing for net leasable area of about 145, 000 m2, acting as a major regional Retail Center.
- The Retail Centre is comprised of two (2) main components:
- The first is the Mall Building, which accommodates a group of atriums linked by hallways, inline retail shop, anchors, theatres, hypermarket and IKEA store.
-The second component of the Retail Centre, is the Retail Village zone. It addresses the core of the Retail Centre with all buildings surrounding the central lagoon, creating a unique, elegantly styled environment.
• Elrehab 2 Project- new Cairo (420 private villa- 174 Residential Building)

Architectural MANAGER at Al Arab Trade And Contracting Co. QATER-The Pearl Project
  • Qatar - Doha
  • July 2007 to February 2008

Review and Coordinate all drawings and documents through all disciplines such as, structural, architectural, electrical, mechanical, landscaping, external works and other special construction and equipment.
• Preparation and submission of monthly progress reports describing construction works and activities executed during the month and the status of work. Submit the construction progress, problems, and meetings report to Owner and respond to any inquiries
• Participation in regular meetings for management and contractors when required
• Ability to resolve problems effectively and clearly communicate results desired and effectively involve co-workers in problem resolution in order to develop and retain a team atmosphere.
• Develop and maintain harmonious relationships with contractors, co-workers, vendors, suppliers, and community stakeholders.

PROJECT MANAGER at Abdul Rahman Al Naim Consultant Engineers Office K.S.A
  • Saudi Arabia
  • April 2003 to July 2007

• Establish and maintain Project operational Procedures including for example, the following :
* Construction Management Procedures
* Progress reporting procedures
* Overall project control procedures
* Correspondences procedures
• Review and approval Organizational chart, construction program. method statement, layout of temporary site facilities, all materials, samples, manufacturing data, material sources, shop drawing, and fabrication drawing submitted by the contractor, construction works. And Advise Owner of any issues and problems.
• Review and approval submit detailed work schedule showing the critical path of project, and update the schedule
• Supervise on-site installations, subsequent testing, equipment and systems. Advise Owner of operational issues and problems.
• Prepare financial status reports that showing estimated and actual project cost at various level of detail and make recommendations.
• Review and Coordinate all drawings and documents through all disciplines such as, structural, architectural, electrical, mechanical, landscaping, external works and other special construction and equipment.
• Preparation and submission of monthly progress reports describing construction works and activities executed during the month and the status of work. Submit the construction progress, problems, and meetings report to Owner and respond to any inquiries.
• Review As-Built drawings. Operations and Maintenance manuals and spare parts lists then hand-over to Owner upon project completion.
• Respond to request for clarification submitted by Contractors, in a timely manner.
• Maintain complete project records including, but not limited to, correspondence, variations, drawings, reports, minutes of meeting and all other project related communications.
• Implement the Project Control System to monitor and control the project's cost and work schedule.

PROJECTS MANAGER at LA POIRE TOURISTIC ENTERPRISES S.A.E
  • Egypt - Cairo
  • June 2002 to March 2003

“Main director and supervisor for designing all architectural projects, working drawing, technical reports, B.O.Q, specifications, cost estimator revision for tender documents, main coordinator for all projects, analyze contractors tender documents and consultant representative for tender analyses meeting and final negotiation with contractors Monitoring&up dating the project schedules, Selection submitting construction materials for approval”.
“Supervisor for execution structural, plumbing, electrical and finishing works, preparing payment certificates and technical. Monthly reports, selecting/submitting construction materials for approval”
…For all projects described here under: -
1 - TOURISTIC VILLAGE
2- hotel tower 5 star 14 Stories 3- Residential tower 15 Stories

TECHNICAL OFFICE MANAGER at October For Development & Real estate Investment
  • Egypt - Cairo
  • October 1996 to May 2002

Main director and supervisor for designing all architectural projects, working drawing, technical reports, B.O.Q, specifications, cost estimator revision for tender documents, main coordinator for all projects, analyze contractors tender documents and consultant representative for tender analyses meeting and final negotiation with contractors Monitoring & up dating the project schedules, Selection submitting construction materials for approval”.
“Supervisor for execution structural, plumbing, electrical and finishing works, preparing payment certificates and technical. Monthly reports, selecting/submitting construction materials for approval”.
…For all projects described here under: -
1 - EL NASYIM Complex
(1000villas-social, sportingclub-outdoortheater- mosque- administrative building-shopping center- artificial lakes)
2 - EL ABOUR HOUSING PROJECTS
3-OCTOBER TOWERS -ACMMERCIAL RESISDENTIAL COMPLEX
4- HIGH CLASS RESIDENTIAL VILLAS:
- Design architectural and Supervisor by using completed construction for 3-D construction system & OMNI-PAN system

SENIOR ARCHITECT – ENGINEER” at ESAAB CONSLTING OFFICE – PROF.DR: SAMY ELAWE
  • Egypt - Cairo
  • February 1996 to October 1996

Preparing preliminary projects, interior designs, working Drawings, technical reports, specifications, B.O.Q, revision for all tender documents, main coordinator and design group”.
…For all projects described hereunder: 1 - TOURISTIC VILLAGE

ARCHITECTURAL ENGINEER at MINISTRY OF DEFANCE
  • Egypt - Cairo
  • August 1994 to February 1996

“Supervisor for execution structural, plumbing, electrical and finishing works, preparing payment certificates and technical. Monthly reports”.
For all projects described hereunder:
1- 8 TOWER Residential tower comprising from 280 high class residential apartments
2 - STORE FOR FOOD 3500 M 2 store for food.

ARCHITECTURAL ENGINEER at EL –SHABLAN R.S.I. K.S.A.
  • Saudi Arabia - Riyadh
  • June 1991 to January 1994

Preparing preliminary projects, interior designs, working drawings, technical reports, specifications, B.O.Q’s, revision for all tender documents, main coordinator and design. Group leader Monitoring&up dating the project schedules, Selection submitting construction materials for approval.”
“Supervisor for execution structural, plumbing, electrical and finishing works, preparing payment certificates and technical. Monthly reports”.
…………For all projects described hereunder:
1 - RESISDENTIAL Projects and Compounds

ARCHITECTURAL ENGINEER at SACH FOR ENGINEERING DESIGN & CONTRACTING
  • Egypt - Cairo
  • May 1986 to May 1991

Preparing preliminary projects interior designs, working drawings, technical reports, specifications, B.O.Q, revision for all tender documents”
“Supervisor for execution structural, plumbing, electrical and finishing works, preparing payment certificates and technical. Monthly reports”
…………For all projects described hereunder:
1 - 3 tower in Nasr City.
2 - Residential Building.
3 - Private House

Education

Master's degree, Diploma in" Architectural Design”
  • at Helwan University, Faculty of Fine Arts, Architectural
  • July 1990

1990: Helwan University, Faculty of Fine Arts, Architectural Engineering Department. Diploma in" Architectural Design”

Bachelor's degree, B.Sc. Degree.
  • at Helwan University, Faculty of Fine Arts, Architectural
  • July 1988

1988: Helwan University, Faculty of Fine Arts, Architectural Engineering Department, B.Sc. Degree.

Specialties & Skills

Project Control
Minutes
Materials
Maintenance Manuals
Manuals
• Primavera project planner
Auto Cad
Microsoft Office

Languages

English
Expert
Arabic
Expert

Memberships

Member, Egyptian Syndicate of Engineers
  • 9/4783