Total years of experience :35 years, 9 Months

Resident Engineer at Architectural Consulting Group (ACG)
  • United Arab Emirates - Dubai
  • My current job since April 2018

Project : Mohammed Bin Rashid Library (MBRL)
Client : Dubai Municipality.
Contractor : Al Shafar General Contracting
The project is comprised of one basement, ground floor and seven floors with total Built-up Area of 54, 188m2.
Basement Floor - 96 No’s of parking spaces, Back of House offices, Exhibition areas.
Ground Floor - An Auditorium with 544 seats and a Café along with Children’s Library, Information Centre, Arabic Library.
1st and 2nd Floors - Family, International, Media and Young Adult Libraries.
3rd and 4th Floors - Conference and Study Rooms.
5th and 6th Floors - Special and Business Libraries.
7th Floor - Exhibition areas.
The work in this project includes but not limited to architectural works, civil works, electro
Mechanical services, external works such as infrastructure & landscaping.

Project Manager at Consulting Engineering Group (COENGR)
  • United Arab Emirates - Abu Dhabi
  • July 2016 to December 2017

The project is Construction of new factory for Al-Nakheel hygienic paper with a total built up area of App 42, 280.0 m2 divided into 5 main buildings: Paper mill factory building 15, 862 m2, Jumbo roll Store 10, 128 m2 Converting Hall factory 9, 234 m, Finished goods store 5400 m2, Administration 1312.98m2, in addition to some external utility and service buildings- 80 mm Interlock main roads & landscaping.

- Structural: Concrete and steel structural, walls and roof cladding Corrugated Sandwich panels.
- Approved from UPC for 1 Pearl design rating - ESTIDAMA - 7 Categories/ Sections (Integration Development Process, Natural System, Livable Buildings, Precious Water, Resourceful Energy, Stewarding Materials and Innovating Practices)


Project Cost=AED100M as civil work only Subordinated Staff 12

Construction Team Leader at Engineering Consultants Group (ECG)
  • United Arab Emirates - Abu Dhabi
  • June 2015 to July 2016

Project : ADCO NEB Infrastructure Upgrade.
Client :Abu Dhabi Company for Onshore Petroleum Operations (ADCO).
Contractor: Pivot Engineering and General Contracting.

The project consists of two accommodation building (G+3), Tow Administration Buildings (G+1) in two different locations -Fire Station Building, Mechanical & Electrical Work Shop- mosque and external roads / landscaping.
Elevations: traditional and heritage finish


Project Cost=AED 400M
Subordinated Staff 26

Project Manager at Al Torath Consulting Engineers
  • United Arab Emirates - Abu Dhabi
  • November 2014 to June 2015

Project : Backfilling & Land Reclamation Projects.
Client : Abu Dhabi Municipality

Consulting services to performance of land surveying works, overseeing the works of land reclamation projects, Management and organization of the work of the quarries and surplus excavation in Abu Dhabi

Project Cost=AED 400M
Subordinated Staff 85

Projects Advisor at Architectural Consulting Group (ACG)
  • United Arab Emirates - Abu Dhabi
  • June 2013 to August 2014

BENYAN Development Company Projects
June 2013 up to Aug 2014
UAE - Abu Dhabi

Project 1 : Abu Dhabi Police General Headquarters (GHQ)
Client : Abu Dhabi Police Ghq Police Projects Committee
Project Manager: Secure Co.
Consultant : Khatib & Alami Consolidated Engineering Company
The Project Consists of MAIN BUILDING -A(16, 836 m²), CAR PAKING BULDING -C(6, 094 m²), MOSQUE (D) / ABLUTION / TOILET (372 m²)and EXTERNAL ROADS / LANDSCAPING (30, 000 m²).
Elevations: Curtain Wall, Composite Aluminum Cladding, Precast Panels.
Project Cost=AED 114 M

Project 2 : Finance House Headquarter Building at ADNEC.
Client : Third Vision Investment.
Project Manager: QP International
Consultant : Architectural Consulting Group - ACG
The Project is an Offices Tower (4Basements Car Parking + Podiums of G.F+ upper G.F+ Mezz.F+ Upper Mezz.F) + 17 Typical F. + 1 duplexes F. + Roof Podium Landscaping Area.
Plot Area 26, 338 M2 and Total Built Area 48, 937.00 M2,
Elevations: Curtain Wall, Composite Aluminum Cladding, Granite Cladding

Project Cost=AED 127 M

Project Manager at Architectural Consulting Group - ACG
  • United Arab Emirates - Abu Dhabi
  • November 2008 to June 2013

Project 1 : Manarat Lusail Tower -Marina Mix002- Lusail - (Not Completed)
Client : Al Mansoori - QATAR - DOHA

(Not Completed)

The Project is Offices Tower (2 Basement Floors Car Parking )+(Podiumof G.F +1st F+2nd .F Retail Area+ 3rd.F+4th F+5th F Car Parking)+ (6th F Amenities Greenery Podium Roof )+ (7th to 28th Typical F)+ (29th&30th VIP Offices) +(31st, 32nd&33rd Mechanical floors)
Project Cost= QR 174, 108, 400

Project 2 : Amaya Towers - Al Reem Island, UAE - Abu Dhabi

Client : Dhafir development & Contracting LLC
Contractor : Dhafir development & Contracting LLC
The Project Consists of Two Residential Towers (5 Floors Parking & Retail Area as Podiums + 25 Typical Floors & Roof Floor for each Tower + Swimming Pool & Club House at 4th Floor Level + External Landscaping Area.
Total Built Area 75, 976 M2
Elevations: Curtain Wall, Composite Aluminum Cladding,
Project Cost=AED 375 M

Project 3: Novotel & Ibis Hotels- Airport Road - Bain Al Jessrain
Client : H.E. SH. AHMED BIN SAIF BIN MOHAMED AL NAHYAN -UAE - Abu Dhabi
Contractor : China National Aero Tech International Eng. Co (CATIC)
The Project Consists Two Tower 4 Basement Floors (Car Parking), Podium of 3 floors= G.F(Main Lobby, Two Restaurants, two Coffee shops, Meeting rooms, Offices & Stores)+Attic F. (Maintenance, Services R, Stores)+ 1st .F (Administrations, Restaurant, Lounge, Meeting .R, Services R, & Stores) + Attic F (Canteen, Pantry, Prayer, Staff Area, Plant R, Services R)+2nd F (Open Restaurant, Light Barr, Swimming Pool, Children S.P, Reception, Table Tennis & Billiard Courts, GYM, Aerobics, Massages, Steams, Saunas, Jacuzzis, Relaxation, Pantry Terrace), 3rd F .(HOTEL GUEST ROOMS).+ 17 Typical F.(HOTEL GUEST APARTMENT) + Roof F. (MECHANICAL)+ Top Roof .
Elevations: Curtain Wall, Composite Aluminum Cladding, Polished Aluminum Fins

Project Cost=AED 425 M

Project 4 : Al Maha Tower -Marina Square, Al Reem Island. UAE - Abu Dhabi
Client : Real Estate Bank
Prepare Snag List, As Built Drawings, and Quantity Survey for all 39 Typical Floors, 3Pent House F. Car Parking & services F.

Project Cost=AED 450 K

Project 5 : Sky Garden Tower -Al Reem Island - UAE - Abu Dhabi (Not Completed)
Client : Plus Properties
Contractor : Taahud General Contracting

The Project is a Residential Tower 5 Floors Car Parking (2B+G+3 Podiums) + 25 Typical F. + 3 duplexes F. + Mech. F + Swimming Pool & Club House at 4th Floor Level + External Landscaping Area.
Plot Area 3, 800 M2 and Total Built Area 36, 680 M2,
Elevations: Curtain Wall, Composite Aluminum Cladding, Polished Aluminum Fins

Project Cost=AED 396 M

Project Manager at Apollodore Eng, Consultancy
  • United Arab Emirates - Abu Dhabi
  • August 2005 to October 2008

Project1 : Horizon Private School - at Khalifa A.
Client : H. E. Sheikh Hamed Bin Ahmed Al - Hamed
Contractor : Desert Construction for General Contracting

The Project Consists of Administration of 660 M2, Main Entrance include: (Food Court & Kit+ Clinic &Office+ Examination + Lecture Theater+ Services+ Staff Cafeteria + Main Library), 74 Class Rooms, 11 Lab’s, 5 Activity Center, 4 Social Study, Lecture Hall, Entertainments (Football field+ 2 Tennis Court + 2 indoor Swimming Pool + Multi-Purpose Theater /Sport Hall + Multi-Purpose Hall/ Show Room), Services Buildings, Staff accommodations & Labor building, + boundary wall & Gates + External Landscaping Area.
Plot Area 75, 976 M2 and Total Built Area 13, 600 M2.
Elevations: Curtain Wall, Composite Aluminum Cladding.
Project Cost=AED 65 M

Project 2 : (AlSerkal Tower) 21 floors commercial building.
Client : Eisa Bin Naser Abdullatif Al Searkal
Contractor : Zakum Contracting & Real Estate.

The Project is a Residential Tower consists of Ground Floors, Mezzanine, Offices F.
16 Typical F (Post Tension Slab). + Penthouse F. + Mech. F.
Plot Area 900 M2 and Total Built Area 20, 700 M2.
Elevations: GRC Cladding, Aluminum.

Project Cost=AED 75 M

Project Manager at Winner Consultant Engineers
  • United Arab Emirates - Abu Dhabi
  • February 2002 to July 2005

Project 1 : Al Manhal Palace boundary wall.
Client :Private Department of H.H Sheikh Zayed Bin Sultan Al- Nahyan. - UAE - Abu Dhabi
Contractor :Almeraikhi General Cont. Est.

The Project consists of Precast Boundary Wall with Cast Aluminum, Tow Main Gates and 6 sides Gates, Observation towers, Finance Building, Administration and services Buildings.
Project Cost=AED 19 M

Project 2 : Boys and girls secondary schools at SILLA.
Client : Works Department.
Contractor :Aswar Engineering & General Co.

Project Cost=AED 20 M

Resident Engineer at Winner Consultant Engineers
  • United Arab Emirates - Abu Dhabi
  • March 2001 to January 2002

Project : (40) Villa at AL HILI A -south cont. No (4).
Client : Works Department.
Contractor: Intermas General Cont

Each Villa Consists of Main Building Block ( 2 floors), Kitchen Block, Driver & Car Parking Block, Services Block, Boundary wall & Gates.
Plot Area 1000 M2 and Total Built Area about 600 M2 for each Villa


Project Cost=AED 45 M

Project Manager at Beirut Consulting Group
  • United Arab Emirates - Abu Dhabi
  • January 1997 to February 2001

Project 1 :(22) floors commercial building (Marriage Fund, Bldg)
Client : Musallam Maktoum Al-MazrouI. - UAE - Abu Dhabi
Contractor :Altharawat General Cont. Est. Curtain Wall,

The Project is a Residential Tower consists of Ground Floors, Mezzanine F, Offices F. 18 Typical F. + Penthouse F. include Swimming Pool + Mech. F. Plot Area 1, 600 M2 and Total Built Area 38, 400 M2
Elevations: Precast Panels, Composite Aluminum Cladding.

Project Cost=AED 52 M

Project 2 :(18) floors commercial building
Client : Khalifa Saeed Al-Mansouri.
Contractor:Amra for Civil Construction Co
The Project is a Residential Tower consists of Ground Floors, Mezzanine, 15 Typical F. + Mech. F.
Total Built Area 16, 000 M2.
Elevations: Curtain Wall, Composite Aluminum Cladding

Project Cost=AED 22 M

Site Engineer at ABNAA AL BUSHRA cont. Est.
  • United Arab Emirates - Abu Dhabi
  • February 1995 to December 1996

Project :Two commercial building (8 floors for each one)
Client : D.S.S.C.B
Consultant : Golden Planner.

Project Cost=AED 13 M

Site Engineer at With General Irrigation & Water Supply Co
  • Syria - Homs
  • April 1988 to February 1995

Project 1 : Oil pipe line transfer around Al Abrash Dam.
Project 2 : Sewerage treatment station.
Project 3 : Al Khabour Dam.
Works include : Excavation, back filling, civil construction& industrial works

Education

Bachelor's degree, civil Eng
  • at Tishreen University
  • March 1988

Specialties & Skills

BUDGETING
CUSTOMER RELATIONS
FILE MANAGEMENT
FINANCE
MICROSOFT WORKS
OIL PAINTING
MICROSOFT OUTLOOK
AUTOCAD
CONSULTING

Languages

Arabic
Expert
English
Expert

Training and Certifications

IELTS: Overall Band Score 7.0 Date 10/Dec/2016 (Training)
Training Institute:
British Council
ADSD (ADCO Documents for Safe Driving) ADCO -H2S Safety Training from ADCO (Training)
Training Institute:
ADCO
- PTW (Permit to Work) ADCO - ADSD (Training)
Training Institute:
ADCO
PMP Training Fifth Edition – (Training)
Training Institute:
CAMBRIDGE Educational Institute