بالاجى سرينيفاسان, PROJECT INCHARGE

بالاجى سرينيفاسان

PROJECT INCHARGE

MIDDLE EAST PRESTRESSING LLC

البلد
الكويت - الفراوانية
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
22 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 5 أشهر

PROJECT INCHARGE في MIDDLE EAST PRESTRESSING LLC
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ أبريل 2006

• Planning, Scheduling and Executing the Post tensioning works in cast in situ and precast segmental works for the bridges & buildings. \n• Planning, scheduling and executing the segmental production at casting yard. \n• Planning, scheduling, controlling and executing the erection of segmental concrete structure and Temporary PT works for the bridges. \n• Calculating and arranging the man, machineries and materials for the all kind of post tensioning, Erection and Temp PT works. \n• Ensure the projects are run efficiently and cost effectively and to the satisfaction of the client. \n• Prepare weekly and monthly budgets and cost reports for client projects for submission to the General Mgr. \n• Liaise with clients to ensure customer satisfaction is maintained for the project life. \n• Report any incidents and /or injuries and forward details to the General Manager for review. \n• Co-ordinate with contractor and consultants for smooth Running of Projects. \n• Planning & controlling of manpower & materials for site operations. \n• Responsible for timely invoicing and collection of payment from customers. \n• Coordinate with main contractor and designer to solve the design and drawing issues. \n• Arrangements and executing the testing of Post tensioning Materials such as strand and duct. \n• Overall responsible for Segmental Erection, Post tensioning, Quality and safety of works. \n• Coordinating with Marketing, Executing, Store, Accounts & Design Departments Regarding Contractual, Technical & Execution Issues. \n• Prepare Daily & weekly reports of site progress works and forward the same details to the higher level management persons. \n \n \n• Planning and Executing the Post tensioning, Erection of segments and Temp PT works. \n• Mobilization and Demobilization of Post tensioning materials and equipment’s. \n• Planning & controlling of manpower & materials for site operations. \n• Prepare Site Project files for site engineers to perform all required QA / H&S documentation as per the documented procedures. \n• Conduct pre-pour inspections of client works. \n• Prepare material request from ERP software. \n• Preparation of Monthly payment Applications. \n• Preparation of Stressing reports, daily reports, time sheets and all site documents. \n• Arrange the labor requirements from the main contractor to execute the Post tensioning works. \n• Ensure safety standards are continually reported and maintained on sites. \n• Work with the Operations/Project Manager to ensure client jobs run to project budget figures. \n• Ensure that all site based QA documents are being completed and QA standards are maintained. \n• Liaise with the Operations/Project Manager regarding requirements for servicing upcoming projects. \n• Ensure all staff is properly trained for their activities and ensure tool box talks are carried out sufficiently. \n• Preparing and submitting all Post tensioning related ISO documents to the Contractor.

CONSTRUCTION ENGINEER في VSL INDIA PVT.LTD
  • الهند - بونة
  • أغسطس 2002 إلى مارس 2006

• Planning, Scheduling and Executing the Post tensioning works. \n• Measure up, document and prepare materials for projects as determined by the issued construction drawings and any subsequent information forwarded by the Operations/Project Manager, as per the documented procedures. \n• Prepare weekly and monthly budgets and cost reports for client projects for submission to the General Mgr. \n• Instruct leading hands on project requirements and maintain supervision of leading hand progress \n• Co-ordinate with contractor and consultants for smooth Running of Projects. \n• Mobilization and Demobilization of Post tensioning materials and equipments. \n• Prepare material request from ERP software. \n• Preparation of Monthly payment Applications. \n• Preparation of Stressing reports, daily reports, time sheets and all site documents. \n• Arrange the labour requirements from the main contractor to execute the Post tensioning works. \n• Coordinate with main contractor and designer to solve the design and drawing issues. \n• Submission of all post tensioning Documents to the main contractor and consultant. \n• Making the reconciliation of material at final stage of contract. \n• Arrangements and executing the testing of Post tensioning Materials such as strand and duct. \n• Planning & controlling of manpower & materials for site operations. \n• Overall responsible for Quality and safety of PT works.

Production Engineer في M/S Tulsyan NEC Ltd
  • الهند
  • ديسمبر 2001 إلى يوليو 2002

Dec 2001 to July 2002 Production Engineer \nM/S Tulsyan NEC Ltd. \nPlot no: 7A, KIADB industrial area Doddaballapura-561 203, \nBangalore district, \nKarnataka.India. \n \nTulsyan NEC Ltd is one of the biggest suppliers in FIBC bags to the India, US and Europe countries.FIBC means Flexible Intermediate Bulk Container, These Bags are made up of Polypropylene is widely used in the field of industry, agriculture, pharmaceutical, metallurgical, mineral, construction and food packaging etc.Owing to the most economic high efficient way to transport it. These bags are most cost effective and durable.Tulsyan is one of the market leaders in India as well as in US and Europe's.Tulsyan manufacture the FIBC bags capcity varies from 500Kgs to 2500.Tulsyan Production Capacity per month is 500 Ton. \n \nAs Production engineer, the major responsibilities are: \n• Planning, scheduling and executing the work as per the given Specification. \n• Arranging the Material for FIBC Bags as per required specification. \n• Planning & controlling of manpower & materials in the production department. \n• Overall responsible for Quality and safety of the works. \n• Preparing the all production oriented Documents. \n• Co-ordinate with Cutting and store department for getting the required production.

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Alagappa Chettiar College of engineering and technology - Karaikudi
  • يناير 2001

Madurai Kamaraj University, 2001 - Bachelor of Engineering (Mechanical Engineering - 70.22%) at Alagappa Chettiar College of engineering and technology - Karaikudi, Tamilnadu - India.

بكالوريوس, computer Applications
  • في Alagappa University
  • أكتوبر 2000

Alagappa University, Diploma in computer Applications - 72.16%, Karaikudi, Tamilnadu -India.

دبلوم, Mechanical Engineering
  • في State Board of Technical Education
  • يناير 1996

State Board of Technical Education & Training, Tamilnadu, 1996 - Diploma in Mechanical Engineering - 83.91% at Annamalai Polytechnic - Chettinadu, Tamil Nadu - India

Specialties & Skills

Production
Preparation
Mobilization
Testing
Education
ARRANGEMENTS
BUDGETS
DRAWING
ENGINEER
OPERATIONS
POST TENSIONING
PROGRESS
SCHEDULING

اللغات

الهندية
مبتدئ
الملايام
مبتدئ
الانجليزية
متمرّس
التاميلية
متمرّس