Site Engineer
Al Hamra Construction
Total years of experience :14 years, 4 Months
PROJECTS HANDLED
-American University of Ras Al Khaimah
-RAK Hospital- RAK Eye and Diabetes Center
- 102 Villas Sheikh Zayed Housing Programme Project in Dibba Al Fujairah
-Waldorf Astoria Hotel by Hilton (5 stars Hotel)
- Mina Al Arab Residential Project (http://www.minaalarab.net/)
Al Hamra Construction
Overseeing and handling construction activities at the artificial semi-island of Mina Al Arab Project/Waldorf Astoria
Hotel/ Sheikh Zayed Housing Programme Project as per the required standards and requirements including desnagging work to handing over.
Administering the substructure activities of the project which includes excavations, pile boring & breaking, plumbing
trenches & piping, water proofing work, water pump installations, raft & retaining wall constructions.
Facilitating the superstructure activities of the project including supervision of each structure & construction
process, finishing work like block, plaster & paint works; installation of all building accessories.
In charge in the daily administration of site including overseeing labour force/subcontractors’ responsibilities and
setting out, levelling and surveying the site. Resolving any unexpected technical difficulties as necessary.
Ensuring accuracy of computation by checking plans, drawings, and quantities.
Making sure all use of materials and performing work as per specifications.
Preparing cost effective solutions and proposals for some technical problems.
Meeting deadlines by effectively planning work and organizing site facilities.
Leading a team of engineers to construct a lavish 5 starts building with all its utilities in palm jumeirah
Projects Handled:
Palm Jumeirah Azure Residence
Supervising and managing all construction activities at the artificial semi-island of
Mina Al Arab Project according to the required standards and specifications
-Activities:
Substructure: excavations- pile boring and breaking- plumbing trenches and piping, water-proofing work- installation of water pumps- raft and retaining wall construction.
Superstructure: supervising every step of the structure-construction process, finishing work (block, plaster, paint works) - installation of all building accessories
De-snagging work and Handing-over
Designed a 20-story building in Dubai utilizing R/C Special Moment Resisting Frame (Graduation Project) –won first place in the National Advisory Committee Competition –won second place in Sharjah Islamic Bank Competition –Presented the project in EPFL Conference in Laussane, Switzerland. 2011 - Parsons International Limited, Structural Dept Dubai • Designed pos-tensioned bridges completely along with site supervision 2008 - 2009 American University of Sharjah, Civil Engineering Dept Sharjah -Research Assistant- • Collected, summarized and organized information from multiple resources Architectural Association Training Course Dubai -Designer and Researcher- • Studied Dubai’s Urbanism thoroughly • Proposed architectural and sociological solutions to some problems (labors) Gulf Consultant Engineering Group Ras Al Khaimah -Architectural Trainee- • Designed multiple-story villas and showrooms in Ras Al Khaimah • Reviewed architectural and construction detailed drawings