Benigno Carilla, Senior Planning Engineer

Benigno Carilla

Senior Planning Engineer

Samsung C&T Corporation

البلد
قطر - الدوحة
التعليم
بكالوريوس, Civil Engineering
الخبرات
21 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :21 years, 3 أشهر

Senior Planning Engineer في Samsung C&T Corporation
  • الإمارات العربية المتحدة
  • فبراير 2011 إلى يوليو 2011

Project Name: DTS-T01: Deep Tunnel Sewerage (16.13 Km with 4.2m Diameter) + Road
Reinstatement & Heavy Infrastructure Works
Project Value: AED 990.12 Millions
Key Role:
•Report to Planning Manager and Coordinate with internal consultant (Hyder) for design matters
•Established Baseline Schedule with Resource Loaded (Man-hour/Quantity/Cost), Generates Manpower Histogram & Cash-flow S-Curve with progress monitoring system (by weighted percentage), Facilitate Shop drawings & Material Procurement Schedule.
•Generates Daily reports, Prepares Weekly & Monthly Report & Weekly Presentation.

Deputy General Manager في Samsung C&T Corporation
  • الإمارات العربية المتحدة
  • يوليو 2011 إلى مارس 2011

Projects:
Qatar, Lusail City: (CP3A2/CP5B/CP7HO) Roads & 8-Bridges(Steel/Concrete) + U/G Utility Works
Hong Kong: MRT/C1109-16KmTunnel + Roads / Underpinned Bridge + 4- Stations
Saudi Arabia: Riyadh Metro (29Km Tunnel + Road, 6-Bridges/Viaducts & 12 Major Stations)
Singapore: Changi Airport Extension Project (4.4km Runway/Taxiway, Canals ranges from 20m to 60m width, Service Roads & Perimeter Fencing
MRT Projects C922/C923/T213 (Roads & Infrastructure Works + MRT Stations)
NS1-Cable Tunnel - Underground Utilities (Power Cable)
Project Value: (More Than US $12-Billions)

Key Role:
•Established Baseline Schedule with Resource Loaded i.e. (Man-Hour, Eqmt-Hour, Quantity, Cost) and Generates Manpower, Equipment Histogram & Cash-flow S-Curve, Monitor Overseas Various Projects & Their Statuses and report to Project Manager/Vice President.
•Conduct Time Impact Analysis for Time Claim Extension/Generate Delay Analysis Write Up.

Other functions:
•Prepares all initial project control documents and procedures including scheduling, controlling, progress measurement / monitoring, KPI, Earned Value Management, project execution plan, etc.
•Prepares baseline, internal target, weekly roll-over and look-ahead programmes for engineering, procurement and construction works for all disciplines (civil, architectural, electrical & mechanical + plumbing) conforming to the contract conditions. Updating the schedules on weekly and monthly basis and reported the progress on the same.
•Prepares the weekly crucial action list for engineering, procurement and construction items and established project control points documents like (Method Statement & technical/ material/ shop drawings submittals), insurances, vendors/suppliers, open submittals and shop drawings
•Managed planning team of local consortium partners (planner and snr. planner). Participated in the weekly and monthly site meetings with partners, sub-contractors and client’s representative.
•Maintained issue and change log and assist any pending issues for future claim, putting up EOT claim by assessing the delays including concurrent delays.

Planning Manager في M&M Construction Co. Ltd
  • الإمارات العربية المتحدة
  • يناير 2009 إلى فبراير 2011
Senior Planning Engineer في Geosan Construction Dynamics
  • قطر
  • نوفمبر 2007 إلى نوفمبر 2008

General Electric Advance Technology Research Center / The Falcon Building +
External Roads and Infrastructure / Underground Utilities
Project Value: QAR 309 Millions
Key Role:
•Responsible in the preparation of tender bid programme and developed baseline programme upon the award of the project, prepares Cash-flow, manpower histogram, contractual reports;
•Mentoring and coaching of planning team, generate material and equipment schedules and obtain updated delivery information from procurement department. Collating work progress for each contract and include them in the weekly and monthly Progress Status Reports. Utilizing the progress data, updating site plan & inform those concerned when progress is falling behind schedule & maintain a constant follow-up on materials/equipment delivery dates.
•Generate weekly look ahead to maintain objectives of agreed milestones. Attend progress meetings & report the current situation & shall note all changes in the forward plans & any restrictions on progress. Maintained records as per ISO 9001: 2000 Quality Management System Procedures. •

Senior Planning Engr في Al Hamra Construction Company LLC
  • الإمارات العربية المتحدة
  • أكتوبر 2006 إلى أكتوبر 2007

Al Hamra Village Project (Resorts) + Roads & Infrastructure / Underground Utilities Project Value: AED 1.75 Billions
Key Role:
•Assisting the Project Managers, and as senior planning engineer I have supervised my assistance planner and provide coaching on planning & scheduling related issues. Responsible in preparation of construction baseline programme, Cash-flow, manpower histogram, contractual reports, Prepare man-hour criteria for all project activities. Generate material and equipment schedules and obtain updated delivery information from the relevant departments.
•Collating site progress in preparation for weekly ‘look ahead’ to maintain objectives and agreed milestones, and gather work progress information for each contract and each area and include them in the weekly and monthly Progress Status Reports. Attend progress meetings and reporting the current situation of each contract.

Senior Planning Engineer في Saudi Oger Emirates LLC/Oger Dubai LLC
  • الإمارات العربية المتحدة
  • أغسطس 2005 إلى سبتمبر 2006
Lead Planner في Ali Moosa & Sons Contracting Co
  • الإمارات العربية المتحدة
  • يوليو 2002 إلى أغسطس 2005

Established Construction Baseline Programme and obtain approval from Client’s Representative. Prepare man-hour criteria for all project activity, Also establish Histogram & Cash-flow. Generate material/equipment schedules & obtain updated delivery info from procurement dept. Monitoring site progress and prepare ‘look ahead’ schedules, Generate Key Performance Indicators (KPI) and include them in the weekly/monthly Progress Status Reports. Attend progress meetings and report the current situation and note all changes in the forward plans and any restrictions on progress.

Project Manager
  • الفلبين
  • أبريل 2016 إلى يناير 2005

Projects: Reconstruction of Flooring @ Second Floor Level with additional Rooms and Newly
(G+1+Mezzanine+Roof) Building and Underground Utility Works
Project Value: (More Than Php 5-Millions)
Key Role:
•Liaised to all pertinent offices and other government bodies for securing and obtaining building permit, approval of shop drawings i.e. architectural/structural design matters along with the specifications and project cost. Financing Project Cost, Planning & Scheduling, Manage / supervise at a project level all engineering, administrative policies/procedures, dealing with Suppliers / Fabricators / Installers & in-house supervision.

Cost Control Engineer في Al Mabani General Contractors Co
  • سبتمبر 1999 إلى يونيو 2002

in preparation of man-hour criteria for all activities i.e. manpower histogram, and cash flow of the project. Ensuring productive & timely completion of the project from initiation process, planning & coordination, execution/monitoring & continuous up-dating the overall programme.
•Ensuring that all staff and subcontractors are made aware of the site plan and appreciate the part they will need to play in its implementation. Attend progress meetings and report on the current situation and shall note all changes in the forward plans and any restrictions on progress.
•Record all works additional to the original requirements and all variations and revisions which must be incorporated in the site plan and informing the appropriate staff and subcontractors of any change from the original scope, Then Generate Time Impact Analysis for EOT Claims.

QC Inspector في MIDMAC Contracting Company
  • قطر
  • مايو 1995 إلى أكتوبر 1998

Project Name: Al Udeid Airbase (4.2Km Runway + Taxiway) + Service Roads & U/G Utilities)
QAFAC - Methanol/MTBE Refinery (Infrastructure Project + Roads & U/G Utilities)
Project Value: QAR 2.4 Billions
Key Role:
•Conduct Site Inspection / Perform all associated Laboratory test and materials testing.
•Assisting the Senior Planning & Cost Engineer, assisting in man-hour requirement preparation, assist in establishing material / equipment schedules and obtain updated delivery information, assisting in the preparation of contractual reports, assisting in preparation for potential Extension of Time Claims. Weekly monitoring of site work progress.

Site Engineer في Arabian Fal Company
  • المملكة العربية السعودية
  • مارس 1993 إلى مارس 1995

Project Name: Construction of HADEED Housing, Water Loop System + Roads & U/G Utilities
Project Value: SAR 64 Millions
Key Role:
•As site Engineer carefully check & examine construction drawings to fully acquaint with the plans & various elements of the structures. Study the plans and specifications & determine the trade work specified, Conduct daily field supervisions & assisting the project engineer in the implementation and execution of the project, and responsible to supervised and organized the plumbing section and authorized to request tools, equipment/materials needed in the job site.
•Allocating plumbers in their respective work to execute de-watering and plumbing works.
•Prepares and submit daily and weekly progress reports based on site accomplishments.

Resident Engineer في Coral & Associates Inc. C/o Department of Education Culture & Sports
  • يونيو 1991 إلى يناير 1993

Project Name: Construction of 18nos. School Buildings (with Service Roads & U/G Utilities)
Project Value: PHP 4.5 Millions
Key Role:
•As Resident Engineer of the Infrastructure Project under the Department of Education Culture and Sport, has given the privilege to directly supervise and implement the construction.
•Coordinate the checking of designs, plans, specifications and cost estimates of all work scope, coordinate the timely delivery of equipment and materials needed in the project. Analyzing change order, extra work orders and time extensions required.
•Conduct inspection and identify bottleneck on civil works and prepare inspection reports with recommendation of appropriate measures, and supervised construction activities in compliance with the approved plans, specifications, cost estimates, and work programmes, procurement schedules & other related matters pertaining to the contract agreement. Prepare & submit periodic inspection reports and assist in the evaluation of work accomplishment.

Assistant في Maluso Municipal
  • الإمارات العربية المتحدة
  • أبريل 1989 إلى مايو 1991

Project Name: Construction of Various Government Projects, like Bridges, Roads / Underground
Utilities, Municipal Water System, Canals & Drainages
Project Value: PHP 4.8 Millions
Key Role:
•As Assistant Municipal Engineer responsible to assist the Municipal Engineer in the implementation and supervision of various government projects and Water District project to be done. And responsible in the preparation of construction schedules.
•Responsible for the calculation of all Take-off for the materials needed for the projects. Operates Estimate, Planning / Graphic Scheduling as Municipality Office Requirements.
•Conduct site / field inspections to various municipal projects.

Project
  • إلى

Hotel + External Roads

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Western Mindanao State University

in

Specialties & Skills

Planning
Cost Control
Time Management
Scheduling
BRIDGES
CASH FLOW
DELIVERY
ENGINEERING
GOVERNMENT
MATERIALS MANAGEMENT
MEETING FACILITATION
MICROSOFT WORKS
PLUMBING