Mechanical Engineer
Qatar Design Consortium
Total years of experience :17 years, 1 Months
Current Project: Barwa Al Baraha (Building and Infrastructure Package).
Location: P.O. Box 5171 Doha, Qatar.
Department: Project Management
Job Description: Conduct on-site inspection of HVAC, Plumbing, Drainage and Fire Protection installations, materials and equipment of the contractors.
Check if the materials and any portion of work conform to the drawings and specifications.
Check if materials are properly handled, stored and used in the projects.
Supervise the execution of works, carryout regular inspections of works and confirm the materials to comply with the construction contract documents and requirements.
Ensure that works are being carried out as per the approved Method statements and Shop Drawings using approved Materials to avoid any abortive works.
Ensure that removal or repair of faulty construction, which was performed without inspection and corrective works are undertaken accordingly by the contractors.
Prepare progressive snagging lists throughout the construction period.
Implement procedures on site for quality assurance and quality control and safety.
Review, update and comment on monthly reports on the progress of the project prepared by the contractor and assist in the preparation of reports to the client.
Monitor the progress at site as per the approved program.
08 March 2011 - 31 March 2013
Company: Sky Oryx Joint Venture (Taisei Corporation and TAV Construction).
Project: CP 18 Main Terminal Complex, New Doha International Airport Project.
Location: NDIA P.O Box 55873 Doha, Qatar.
Department: MEP, Testing and Commissioning.
Job Description: Inspects construction, installation and operation of Plumbing, Fire Protection and Water Features system/equipment for conformity to specifications.
Carry out system tests according to Approved Test Forms and ITPs.
Scheduling and coordinating work to tight deadlines.
Identify and track resolution to all issues related to improper equipment and system installation.
Verify and document proper performance of equipment and systems.
Attend a weekly meeting with project/construction engineers and sub-contractors to discuss issues and do one week look ahead schedule.
Monitor the final completion of the installation.
15 July 2008 - 15 July 2010
Company: Safety and Industrial Equipment Centre
Project: Al Drees Steel Door Factory/Damad Tower
Location: P.O. Box 4372 Riyadh 11491, Saudi Arabia.
Job Description: Responsible for the coordination, implementation and execution of the installation of Fire Protection System (Wet Pipe Sprinkler, FM 200 and Foam system) including monitoring of progress.
Carry-out design and drawings ensuring its optimization and full compliance with the contract.
Initiate material and equipment submittals.
Ensuring that the quality of material and installation of works are accordance with the acceptance criteria, specification, approved materials and methods of installation approved for the project.
Ensuring that all information from the approved drawings is conveyed to the workforce in a proper manner and details produces are in compliance to the requirement.
2 x 609 Megawatt Coal-Fired Thermal Power Plant.
Location: Sual, Pangasinan, Philippines.
Department: Maintenance (Auxiliary Plant: Reverse Osmosis, Waste Water Treatment Plant and Demineralization Plant)
Job Description: Assist in making repairs and replacement of System/ Equipment in Reverse Osmosis Plant, Waste Water Treatment Plant and Demineralization Plant wherever and whenever necessary.
Responsible to perform and carry out any task undertaken by my senior maintenance Engineer.
Work as per the guidelines and instructions of the senior maintenance engineer and supervisor and deliver to the best of my abilities.
Bldg. 1-A, Sunyu Compound, Veterans Center, Taguig City, Philippines.
Job Description: Measure the dimensions of the product using precision measuring devices (Caliper, Micrometer, Thickness Indicator and Hardness Tester)
Ensure routing and inspection for incoming and finished product.
Assist for product quality control and assurance, keep track on reject, rework and scrap products.
Prepare nonconformance reports to the QA manager and assist in developing corrective actions.
Ensure rejected parts are properly identified.