Civil Engineer
Otaishan Consulting Engineers
Total years of experience :22 years, 3 Months
As Site Supervision Civil Engineer in Consultancy Work. Detailed work description as follows:
1. Approve/review Material submittals.
2. Approve/review Drawing submittals. (tender, issued for construction and shop drawings.)
3. Make close coordination with the contractor for the on-going and up-coming activities.
4. Approve/review document submittals.
5. Make civil works monthly reports
6. assigned in other civil work (drafting, calculation, etc) activities as manager wishes to.
PROJECTS:
- ProCare Riaya Hospital Expansion Project (9 Floors with basement, highlights: 150beds, tunnel to existing building, post tension slab, hollow core slab, raft foundation, pre-cast wall. - Al-Khobar, KSA.
- General Auditing Bureau - Office Building Project - highlights: 8 Floors with 2600 sq.m. basement, dapped-end beam, hollow core slab, 2 big elevator shafts, Joist slab system, shear walls, - Makkah Province
- IPA Compound Project - Phase I - Civil Engineer - as temporary replacement for engineer in vacation.
- Mobily Project - Mega Tahlia in Jeddah - Project
Manager
- General Auditing Bureau - Office Building Project - highlights: 8 Floors with 2600 sq.m. basement, dapped-end beam, hollow core slab, 2 big elevator shafts, Joist slab system, shear walls, - Makkah Province
CIVIL ENGINEER
a. Working as Site Supervision Civil Engineer in Consulting Department at Border Guard Compound Project, Rabigh, KSA. (10 hectares, 25Bldgs, SR50M)
b. In the last 3 months of my contract: work as Civil Engineer in Contracting Department for Border Point in Al-Khafji, KSA.
a. Responsible for the Inspection and Audit (nationwide) for the Civil Works Department: 1. AMA Bank; 2. AMA Universities and its Branches including AMA International University in Bahrain; 3. PICAR Holdings and other Subsidiary Corporation Worldwide.
Responsible for School Building Program under Department of Education (Foreign Assisted Special Project) at Division Level
a. Pre-Construction Activities like Conceptual, Detailed Engineering, Bid Tendering, Evaluation of Bids and Awarding of Contract to Good Record Contractors
b. Construction Phase Activities like Conducting Pre-Construction Activities and Site Visits with the winning contractor; Site Supervision; approval of materials, material testing requirements; approval of drawings, conduct Weekly Coordination Meeting and Project Monitoring; Snaglisting or Punchlisting of Remaining works; Commisioning and Recommendation for Project Certificate of Completion
c. Post Construction Activities - Implement Post Construction Contractual liabilities to the Contractor with the COA post Audit Technical Assistant Staff and World Bank; with 10% of Contract amount withheld in cash or in unconditional bank guarantee to correct any valid defects during the period.
4. Position: Division Cost and Planning Engineer
Duration: June 15, 2000 to August 21, 2001
Company: Intem Consulting, Inc.
Location: Tokyo, Japan (Main) and Makati, Philippines
Department: Civil Works Department
Job Description: Responsible for School Building Program under Department of Education (Foreign Assisted
Special Project) at Division Level
a. Pre-Construction Activities - Responsible for Final Cost Budgetary Estimates Reporting
b. Construction Phase Activities - Ensure Time, Cost and Quality Evaluation; and Check the
Internal consistency and logical sequence of the important milestone of the project.
Physical and Financial Impact with WBS during the duration of the project. Prepare
Weekly Physical Progress and Financial Report and Assist Request for Certificate of availability of Funds.
School University: University of San Carlos - Technological Center Location: Cebu City, Philippines Date: 1994 to 1999