Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
bhanu prakash donthula, Electrical Designer

bhanu prakash donthula

Electrical Designer·Amec

India

Bachelor's degree, ENGINEERING TECHNOLOGY

Work experience

Total years of experience: 29 years, 0 months

Electrical Designer

November 2017 - Present

Amec

Khobar, Saudi Arabia

November 2017 - Present

Electrical Designer

Company industry:
General Engineering Consultancy
Job role:
Engineering

Electrical Designer

September 2004 - Present

RANHILL PLANT POWERT

Malaysia

September 2004 - Present

: My role in this project drafting Electrical drawings which already mentioned above, selction of the products which is suitable as per clients requirement as per standard. Co-ordination with Civil, Mechanical, Structural people.
My role in this project mainly drafting and assistance in designing, selection of products like type of lighting fixture, power sockets lux level calculations checking as per clients requirement, checking vender documents and drawings. for earthing what ever the specification BS standard and as per weather conditions, power supply, for lightning we have to connect to the earth grid, maintaining the gap from bulding, for CCTV location checking the area of coverage of the camera modifications. as per Engineers instruction. I have dealed the project cable routing for OPERATION BASE CAMP(TOWN SHIPS).In this project I have done detailing all cable routes for existing civil diagrams and we have maintained single line diagrams for every divisions .The proceeding of the cable routing system in this project is as follows,
All the cables coming from power station to mcc from the origin of mcc the cables are separated to all the buildings like Sub switch boards, lighting dbs, Power dbs, Ac dbs, workstation dbs, Lighting layouts, Earthing layouts, lightning layouts, Main cable trench layout, Main earthing layout, Small power socket layouts, Public Addressing General Alarm layouts, Telephone, MATV, CCTV layouts for internal and External layouts, Main Switch Board, Sub Switch board and all other Distribution boards, lighting layouts, power sockets I have followed as per single line diagrams and as per the specifications given by the client.

All above drawings done for Two sites in Sudan. Palouge, Al-Jabalayn is the sites names. Al most 0.5 k.m X 0.5 km coverage area, It includes administration building, Recreation center, Medical center, Mosque, Laboratory, Fire station, Sub-

Company industry:
Oil & Gas
Job role:
Engineering

Electrical Designer

May 2015 - May 2017

WorleyParsons - Saudi Arabia

Yanbu, Saudi Arabia

May 2015 - May 2017

Electrical Designer

Company industry:
General Engineering Consultancy
Job role:
Engineering

Electrical Designer

June 2014 - April 2015

WorleyParsons - India

Hyderabad, India

June 2014 - April 2015

Electrical Designer

Company industry:
General Engineering Consultancy
Job role:
Engineering

Electrical Designer

September 2006 - May 2014

ASA BHANU TECHNICAL SERVICES LTD

Hyderabad, India

September 2006 - May 2014

Designing of AIS/GIS substations:

• Designing of Overall Equipment Layout
• Designing of Equipment Sections
• Designing of MEWP Access layout
• Designing of MEWP Access Sections
• Designing of Earthing Layout
• Designing of Earthing Sections & Details
• Designing of Earthing BOQ
• Designing of Lightning Layout
• Designing of Lightning Sections & Details
• Designing of Lightning protection BOQ
• Designing of Power cable layout
• Designing of Power cable support structures layouts
• Designing of Power cable support structures details
• Designing of Power cable support structures BOQ
• Designing of Busbar Connectors Details
• Designing of CDM Layout
• Designing of Cable Schedules
• Cable routing LV cables by using ME10 Software.
• BOQ for HV Power cable,
• BOQ for LV Power & Control cable,
• BOQ for Lightning Protection material,
• GA for Local Control Panel, Stage by Stage single line diagrams
• Loading Detail drawing for GIS Substation

Projects Involved

• Qurain 'W' 300/132/11kV GIS Substation
• Saad Al Abdulla 132/11kV GIS Substation
• Uskmouth 275/132kV GIS Substation
• Swansea 400/275/132kV GIS Substation

Projects Involved for Tendering

• Sloy 132kV GIS Substation
• Bredbury 132kV AIS/GIS Substation
• Blackhillock 275/132 kV AIS Substation

Projects Involved for Replacement of Equipment

• Lovedean 400/132kV Substation-SGT 3A Transformer Replacement
• Sundon 400/132kV Substation-SGT 5 Transformer Replacement
• Wymondley 400/132kV Substation-SGT 2 Transformer Replacement

Designing of Solar Power plants from 1MW to 10 MW:

• Preparation & Designing of Solar PV layouts
• Preparation & Designing of Single line diagram
• Preparation & Designing of Control room layout
• Preparation & Designing of Typical installation details of solar panel
• Preparation & Designing of Power Evacuation maps
• Feasibility study

Company industry:
General Engineering Consultancy
Job role:
Engineering

Electrical Designer

April 2006 - September 2006

CONSPEL QATAR WLL

Doha, Qatar

April 2006 - September 2006

Responsibilities :

• Designing of Single line diagram
• Designing of Power Socket layout
• Designing of Lighting layout
• Designing of Power cable layout

Projects Involved

• Intercontinental Staff/Guest Accommodation
• The Pearl Qatar

Company industry:
Electric Power Production & Transmission
Job role:
Engineering

autocad engineer

March 2003 - September 2004

kart engineering sdn bhd

Malaysia

March 2003 - September 2004

: We are M & E contractors kartz engineering provides M & E services in thisorganization I have dealed the project cable routing for sewage treatment plant (STP) and central sludge treatment plant (CSTF).In this project I have done detailing all cable routes for existing civil and instrumentation diagrams and we have maintained single line diagrams for every divisions .The proceeding of the cable routing system in this project is as follows,
All the cables coming from power station to mcc from the origin of mcc the cables are separated to all the equipments like penstocks, ventilators, pumping station, crane motors etc.,
For all these connections I have followed as per single line diagrams and as per the specifications given by the client.

And instrumentation drawings like Plant Wide SCADA System, PLC Diagrams, control panel diagrams, Pipe line drawings, Electrical Circuits diagrams.

Company industry:
Oil & Gas
Job role:
Design, Creative, and Arts

ENGINEER

September 2000 - March 2003

RMSI

India

September 2000 - March 2003

: Digitization of Flood effected areas in different areas of Japan in different years which includes all data in attributes thru MapInfo table structure with Computerization of attribute data Digitization of Streets, Water(Streams, Bodies, River) Railway lines, Roads includes(Freeways, Highways, Primary Roads, Ramps, Upper roads, New double roads) and giving Elevations to roads features using by old data from client. from different states of U S A Dividing Different Counties. we are doing County wide. And clean the drawing with different tools like dangle and chain breaks and delta and after doing digitization doing Q.C in AutoCAD after Q.C Processing should be done in Arc nt after that checking in data in MapInfo for checking for direction of road ways. After that submitting to Q.A.

Company industry:
Software Development
Job role:
Other

cad engineer

April 1999 - September 2000

vision labs

India

April 1999 - September 2000

Digitization& Vectarization, Modification, Editing and
Merging of drawings

Company industry:
Software Development
Job role:
Design, Creative, and Arts

jr engineer

November 1998 - April 1999

SURYA TRONICS PRIVATE LTD

India

November 1998 - April 1999

Drafting of Sugar Factory and Chemical Factory Machines like Jaw Crusher, Condenser, Evaporator, Pumps Tube Plates for Filtering of juice of Sugarcane, Piping for Sugar Plant, Leaching Mills, Ball Mills other Misc.(Maintenance Parts) 2D to 3D part modeling and taking dimensions Independently.

Company industry:
Industrial Production
Job role:
Design, Creative, and Arts

JR ENGINEER

June 1997 - November 1998

OILCOUNTRYTUBULAR LIMITED

India

June 1997 - November 1998

Drafting of Dies, Mandrels, Jigs &Fixtures, Boring Bars, Boring Heads and other Miscellaneous (maintenance parts)and making in to 2D to 3D part modeling and taking Dimensions Independently. Documentation of ISO standards all Drawings, Maintain Records of giving Drawings to all Shop floors.

Company industry:
Industrial Production
Job role:
Engineering

Education

BIRLA INISTITUTE OF ENGINEERING AND TECHNOLOGY,PILANI

June 2012

June 2012

Bachelor's degree, ENGINEERING TECHNOLOGY

India

PROJECT WORK DONE 5MW SOLAR POWER PLANT I RECIVED GOOD ON THIS REPORT

SG GOVT POLYTECHNIC

July 1996

July 1996

Diploma, MECHANICAL

India

Skills

Solidworks
Expert
Solidworks
Expert
CAD
Expert
CAD
Expert
PDMS
Expert
PDMS
Expert
CAD
Expert
CAD
Expert
E3
Intermediate
E3
Intermediate
ME10
Expert
ME10
Expert
PDMS
Intermediate
PDMS
Intermediate
SP3D
Intermediate
SP3D
Intermediate
Microstation
Expert
Microstation
Expert
Solidworks
Expert
Solidworks
Expert

Languages

English

Intermediate

Hindi

Expert

Malay

Beginner

Arabic

Beginner

Tamil

Intermediate