Trasmission & RAN Engineer.
Kou-chan Knowledge Convergence PVT LTD
Total years of experience :13 years, 8 Months
Installation and Commissioning of NSN Ultra & Flexi Edge BTS-Indoor/Outdoor.
Fault rectification & Troubleshooting of BTS.
Trouble shooting of CF & TRX Faults.
VSWR measurement using site master (Quality check of all Installation and Commission at sites.)
External Alarm Clearance through OMCR.
Preventive & Breakdown maintenance for the NSN BSC, BTS, Alcatel Lucent MUXs and Ceragon microwave equipments and ring protection testing on quarterly basis.
Coordination with RF team for customer Complaint and its related issues.
Worked On ZTE CDMA BTS.
Monitoring BTS Quality Alarms from BSC & rectification to achieve better KPI.
Activity involve in Audit, Quality of Newly Installed Sites.
Performing Site Acceptance Test (AT) Procedure after site is radiating.
Electrical Work Troubleshooting DG, PIU, SMPS, BATTERY BANK etc.
Working On Local NMS.
Commissioning & integration of following:
o Ultra and Flexi BTS.
o FIU 19 & FIU 19E with proper cross connection.
o RRI with microwave links and proper cross connection.
o Various cascading sites.
Using the site Analyzer (Anritsu-SS331A/Bird) for measurement of VSWR, Power.
Integrating sites as per the requirement.
Rectifying the Quality Affected Alarms in Nokia Ultra, Flexi Sites.
SDH
o Troubleshooting with TEJAS SDH MUX.
o Handling Tejas MUX with 63 E1s.
o Preparing KLM for cross connections.
o NMS of Tejas Mux using IP topology.
o Handling Alkatel Mux.
CERAGON
o Troubleshooting with R1, R2, SDH IDU.
Installation verification /operation & maintenance of BTS and Microwave link(Nokia)
Trouble shooting and fault rectification of BTS & Microwave Link
Cooperates and reports about the trouble handling under the direction of the Network Operation Centre. Collects site visit reports to Cluster Manager.
Manages tools, test equipment, spare units etc. for the location.
To Investigate the cell site alarms, resolve fault & reassurance with NMC
Implementation of EDGE, MULTIDROP and MULTI-BCF in Nokia BTS.
Restoring Power connections at sites
Through E1’s as per Transmission planning in the Network
Installation Commissioning & integration of following:
o Ultra and Flexi BTS & Node B.
LOOP Testing & E1 Testing.
Measurements of TRx powers, Call testing.
Measurements of VSWR per sector using site analyzer.
Activations of Alarms and Testing.
Troubleshooting for telecom related problems.
Performing the Acceptance Test (AT) for BTS sites.
Site Quality Index Audit (SQI) for BTS sites.
Commissioning of NOKIA ULTRA, FLEXI INDOOR/OUTDOOR BTS
Commissioning of FIU, FLEXI HYBRID, CERAGON & FPMR.
Commissioning of FIFA, FIPA, RRI, E1/T1 CARD.
Commissioning of Node B.
Installation of Node B.
Installation of NOKIA FLEXI INDOOR/OUTDOOR BTS.
Installation Commissioning & integration of following:
o Ultra and Flexi BTS.
o FIU 19 & FIU 19E with proper cross connection.
o RRI with microwave links and proper cross connection.
o Various cascading sites.
Using the site Analyzer (Anritsu-SS331A/Bird) for measurement of VSWR, Power.
Integrating sites as per the requirement.
Rectifying the Quality Affected Alarms in Nokia Ultra, Flexi Sites.
Installation verification /operation & maintenance of BTS and Microwave link(Nokia)
Trouble shooting and fault rectification of BTS & Microwave Link
Technical Qualification:- B.E. in Electronic & instrumentation From I.E.T Khandari Agra in year 2009 (Affiated To DR. B.R. Ambedkar University Agra) Academic Qualification:- High School (10th) form UP Board in year 2003. Intermediate (12th) form UP Board in year 2005.