Electrical Project Engineer
SkyElectric
Total years of experience :3 years, 4 Months
>Survey, Study technical Drawings and Specifications of
Electrical Systems.
>Test and Supervise the Deveolpment and Performance of
Equimpents and Devices.
>Responsible All devices Implantation and Project
Funcationality.
>Resonsible Series all the Modules and Connect it to the
Inverter.
>Isolation of the Cables by Inserting the Aluminum Wire in
to the Lag.
>By Taking the Connection from the Inverter and
Connecting it LT Panel.
>Supply AC Current To Transformer and its Connections.
>Controlling the Communication System through Control
Room.
>Monitoring the Fault, Short Circuit and Damaged
Devices&Components by Communications System.
>Replacing & Reparing Electronics Devices &
Components.
ANNUAL & MONTHLY MAINTENANCE OF EQUIPMENTS
INSTALLED IN COMPLEX:
>Generators, Air Compressor
>Over Head Crane (5/35 ton), Draft Tube Crane (210 ton)
>Drainage Pump Motors
>Straine, Battery System & Chargers
>IR Test of Generator, Transformer and Moters.
>Ratio Test of Transformer, BDV test of Transformer
>I Remained attached with
Operation, Electrical, Protection, Scada
Section and High Power Switchgear System