Bob Jusoy, QAQC Manager

Bob Jusoy

QAQC Manager

International Foundation Group

Location
United Arab Emirates - Dubai
Education
Bachelor's degree, QMS Lead Auditor
Experience
29 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :29 years, 2 Months

QAQC Manager at International Foundation Group
  • United Arab Emirates - Dubai
  • My current job since March 2018

01. Responsible for all Quality Assurance and Quality Control related matters of projects.
02. Liaise with the Project Manager, Operation Manager and Projects Director regarding project quality matters.
03. Liaise with client and consultant’s quality personnel to ensure the specified requirements are complied.
04. Supervise and manage QAQC Engineers and Inspectors
05. Preparation of PQP - Project Quality Plan and Method Statement
06. Preparation of ITP - Inspection & Test Plan and Field Inspection procedures.
07. Liaise with the Project Manager regarding project quality matters.
08. Coordinate with site QC Engineers in the day to day functioning of the department and act as the focal point of the contractor quality organization.
09. Initiate record and provide solutions for quality problems.
10. Handling the material submittal, testing and monitoring
11. Closing of Site Observation Report and NCR issued by the consultant.
12. Coordinate with the site project manager & construction manager on all quality issues
13. Testing & Commissioning and Project Handing-over

Project QAQC Manager at Al Jaber - Qatar
  • Qatar - Doha
  • October 2014 to December 2017

Al Jaber & Partners is an international contracting company that serves as the main contractor of the infrastructure road projects including the hard & soft landscaping works in 3 packages of a multi-billion development project in Lusail Energy City, Qatar.

Job Description:
01. Manage and control all quality functions upon the project within the guidelines of the Quality Management System and the project specific documents.
02. Ensure that Quality Management Systems (QMS) are implemented and maintained in accordance with the defined quality standards.
03. Liaise with the Project Manager regarding project quality matters.
04. Initiate action to prevent the occurrence of any non-conformance and stop any non-conforming works from proceeding without rectification.
05. Review the preventative actions recommended in non-conformance reports, initiate and verify corrective actions to prevent re-occurrence of non-conformity.
06. Initiate record and provide solutions for quality problems.
06. Ensure that all site personnel including sub-contractors follow the quality assurance system and implement training of site personnel in the QMS.
07. Periodically perform internal and external audit to the company, suppliers & subcontractors.
08. Prepare Project Quality Plan and approve the MS, ITP’s and Field Inspection procedures.
09. Liaise with client quality personnel to ensure the specified requirements are complied.
10. Comply with all the requirements handing over documentation for the milestone achievements and end of the project.
11. Coordinate with site QC Engineers in the day to day functioning of the department and act as the focal point of the contractor quality organization.
12. Closely monitor the micro-tunneling work for all roads crossing duct.
13. Liaise with the Corporate Quality Manager with regards to quality related issues and project QMS performance.
14. Attending Bi-Weekly Quality Meeting together with the Project Management and Supervising Consultants
15. Attending weekly progress meeting together with the Client and Consultants.
16. Monitor all quality related activities on the project.
17. Ensures the quality records, acceptance certificates, mechanical completion certificates and the documentation for specific systems and buildings/areas are prepared and collated in accordance with project requirements.
18. Coordinate with the site project manager & construction manager on all quality issues

Site QA/QC Manager at UCC - Qatar
  • Qatar - Doha
  • September 2011 to October 2014

UrbaCon-International Contacting Company is a grade-A international contractor that provides the design and built for the construction of a multi-billion development project in Banana Island Resort in which based on a totally self-sufficient resort concept and comprises of the construction of 117 keys and associated services comprising the following elements; Over Water Villas, Land Villas, Family Rooms, Hotel Suites, Spa, Restaurants, Pools, Marina for 50 luxury boats, Artificial reefs and Entertaining Areas including Hard & Soft Landscaping Works.

Job Description:
01. Obtain promotion from Sr. QAQC Engineer to Site QAQC Manager.
02. Implement the QAQC management system at site.
03. Attending Quality Management Review Meeting.
04. Monitor the progress and effectiveness of the project quality management system.
05. Prepare Project Quality Plan, Method Statements and ITP- Inspection & Test Plan.
05. Attending the weekly/monthly coordination & progress meeting with CSC, PMC & Clients.
06. Coordinate with the site project manager & construction manager on all quality issues.
07. Review submittals from subcontractors (such as O&M Manual, Materials submittals and other technical submittals) prior to final submission to the consultants.
08. Coordinate and chair the QAQC site weekly meetings with the project subcontractors QC personnel.
09. Supervise/Manage QAQC Engineers and QC Inspectors
10. Conduct internal & external audits.
11. Prepare the Monthly Quality Statistic Report and Monthly KPI’s.
12. Verify that the quality related site activities are in accordance with the applicable codes and standards.
13. Assure all technical documents relative to site quality control are current status.
14. Monitor all quality related activities on the project.
15. Ensures the quality records, acceptance certificates, mechanical completion certificates and the documentation for specific systems and buildings/areas are prepared and collated in accordance with project requirements.
16. Coordinate all the quality site inspections through the site QC inspectors.
17. Control all non-conformance reports and undertake remedial action.
18. Ensure all quality control documentation is compiled and completed for as-built, hand over through the QC turnover engineer.
19. Assist the site subcontractors to compile turnover dossiers.

Lead QAQC Engineer at Marubeni Corporation
  • Qatar - Doha
  • November 2008 to August 2011

A Project Cost of 1.3 Billion Qatari Riyals and this infrastructure project situated at North of Doha, Qatar for a Treated Sewerage and Effluent Pumping Station and Raising Mains Project.

This project involves:
TSE-3 Pumping Station - this project includes; Construction of Pumping Station & Generator House, 6nos. TSE Main Pumps with a total capacity of 7, 000 li/sec., 6nos. Motor Control Centers & Lifting Equipment, 4nos. Standby Electrical Generators with total capacity of 8MW 3.3KV., Installations, testing and start-up of Pumps, Motors & Control equipments. Also include installation of Vitrified Clay Pipes in sewer drainage pipelines and asphalt road works on access & diversion roads.

TSE MAINS - the project includes the installation of; approximately 43km of twin-line 1600mm ø Ductile Iron Pipe, Approximately 14km Single-line of 800mm ø to 1200mm ø Ductile Iron Pipe, 105nos. Pipeline Chambers.

Job Description:
01. Report to project manager and liaise with the sub-contractor & consultant’s staff.
02. Implement the QAQC management system at site.
03. Prepare Project Quality Plan, Method Statements and ITP- Inspection & Test Plan.
04. Witness/attend for the testing & commissioning at Pumping Stations and Generator Bldg.
05. Supervise/Manage QAQC Engineers, Inspectors & Surveyor and conduct inspection if needed at site.
06. Evaluate & attend testing on the 3rd party laboratory and to the site if required.
07. Monitoring the quality requirements for micro-tunneling works.
08. Conduct final inspection & punch listing prior to project completion hand-over.
09. Conduct air & water test for VC-Pipes connecting from manhole to manhole on drainage pipelines.
10. Conduct hydro-testing for D.I pipes at Single Line & Double Line piping works.
11. Witness the asphalting work on access roads in Pump Station Buildings and other Facilities and to the diversion roads.
12. Prepare, implement and maintain the quality system in compliance with the Contract requirements, and to verify its proper application and efficiency.
13. Also supervises checks and monitors the Subcontractors QAQC documentation to ensure compliance with Contract requirements.
14. Works in close co-ordination with Project Manager and other department managers.
15. Check and Review materials submittal & technical queries from subcontractor prior to final submittal to the Consultant.
16. To ensure that materials used and the executed works are in full compliance with project specifications and standards.
17. Closing of Site Observation Report and NCR issued by the consultant.
18. Compiles final records for all construction/manufacturing activities and review the records for legibility, completeness and conformance with the requirements prior to inclusion into the final records.
19. Chairperson on the weekly meeting with QAQC Engineers & Inspectors to determine and to know the problems related to the on-going activities at site.
20. Testing & Commissioning and Project Handing-over

Project Engineer / Coordinator at United Precast Concrete Co.
  • Qatar - Doha
  • October 2003 to November 2008

UPC is a concrete precast manufacturing company provides the design, production and installation of concrete precast elements in which involves in several projects such as; Twin Towers, Stadium & Race Track, Museum, Karahmaa - Electric & Water Substations, High Raise & Commercial Bldg., Car Parks & Villas, includes road barriers, panels & beams for roads/bridges infrastructure projects.

Job Description:
01. Obtain promotion from Erection Supervisor to Project Engineer - coordinator.
02. Manage the respective project work allocated in accordance with the contract documents, programme and within the planned costs.
03. Ensure that stages of project work allocated are completed within the planned costs and site overheads do not exceed the estimated budget allowance.
04. Liaison with the consultant, sub-contractors to execute the project efficiently, economically and to complete on schedule.
05. Prepare Method Statements, ITP- Inspection & Test Plan and Checklist for inspection.
06. Overall in-charge for the erection process.
07. Ensure that the erection planning is done in accordance with company standards and procedures and so with standards of Precast Concrete Institute.
08. Ensure that erection process is done effectively as per standards & procedures.
09. Ensure that proper documents are made for the early release of the product.
10. Coordinate with Project Managers (both in the Company, Clients and Consultants) in matters regarding the project schedule, variations, delays etc.
11. Identify the training requirements for erection staff & provide them the training as required.
12. Ensure that adequate resources are available in site.
13. Ensure that purchase of materials/components for erection is done according to Quality Control procedures.
14. Ensure that the know how of the department is maintained.
15. Ensure that installation is completed as scheduled.
16. That the erection records are filed in accordance with the standards & procedures.
17. Handling Multiple Projects at once.
18. Resolve any unexpected technical difficulties and other problems that may arise on the site at anytime

QAQC Civil Engineer at Kawasaki Steel Corp. / RIOFIL - JV
  • Philippines
  • February 2000 to May 2003

Kawasaki/Riofil-JV is involve in the construction of a multi-million dollar project package for road & bridge construction that includes pile driving in both offshore and onshore.

Job Description:
01. Report to project manager and liaise with the sub-contractor & consultant’s staff.
02. Advise on testing methods & ensure that the agreed testing procedures are satisfactorily carried out.
03. Generally supervise day to day testing activities and ensure timely submissions for materials & technical approvals.
04. Prepare appropriate testing procedures for inclusion in work method statements and ITP’s.
05. Ensure proper maintenance, calibration and operation of all testing equipment.
06. Ensure laboratory facilities are properly supervised, manned by qualified personnel.
07. Carry out and record inspections, materials & in-site testing.
08. Conduct testing and inspection on pipe installations and other civil work activities on site.
09. Witness/supervise the testing & inspection on road works.
10. Monitor & verify the quality requirements for the subway/tunneling works.
11. Monitoring the quality requirements for micro-tunneling works.
12. Conduct inspection on long span precast concrete beams before casting and delivery at site.
13. Ensure materials delivered are as approved and are properly stored.
14. Conduct inspection on site works such as; (Bored pile & sheet pile driving).
15. Inspect the Pile Driving Barge as per quality & safety requirements.
16. Inspect the Concrete Batching Plant Barge as per frequency required on testing and calibration.
17. Verify with independent testing laboratory that all relevant test results related to specific ITR meets the project requirements.
18. Ensure that the relevant records are effectively and adequately used and signed of the following site inspection activity.
19. Make sure that non-conformity has been reported through a Non-conformity Report (NCR)

Field Engineer / Civil Site Supervisor at Hanjin Engineering & Construction Co., Ltd.
  • Philippines
  • March 1998 to April 1999

HANJIN/ITUCHO-JV is an international consortium of a South Korean and Japanese firm company that provides the design and built for a multi-million dollar railway construction project in Manila, Philippines.

Job Description:
01. Area of responsibility at Subway, Bridge & Intersections (Roads Crossing).
02. Monitor the site activities for the contractor/JV and sub-contractors.
03. Noting conformance with specification, bringing to the attention of the Construction Manager any issues with regards to the work.
04. Monitoring the construction work progress and report to the Construction Manager.
05. Directly involved in the site activities and being the point of contact for any issues on day to day activities.
06. Witness asphalting works on access and diversion roads and so with the reinstatement of road works.
07. Plan and schedule the work & efficiently organize the site in order to meet an agreed program of deadlines.
08. Supervise and monitor the site labor force through General Foreman or Supervisors.
09. Monitoring the work of sub-contractors to complete work as per customer’s satisfaction.
10. Resolve any unexpected technical difficulties and other problems that may arise at site any time.
11. Oversee the selection and requisition of materials for use in the construction & maintenance, to check whether the materials are as specified.
12. In the event that the relevant Shop Drawing, materials used, QCP, MS, and ITP do not cover all specification requirements, the same should be reported in writing to the Construction Manager and the Senior Discipline Engineer.
13. Prepare periodical reports on the progress of work at site within given perimeter area.
14. Ensure that HSE requirements are provided and that they comply with the authorities' regulations.

Quality Control Civil Engineer at Dong-ah Construction Industries & Co., Ltd.
  • Malaysia
  • June 1996 to December 1997

Dong-ah is an international South Korean firm company that involve in the construction of a multi-million dollar project in Bakun Hydro-electric that includes tunnel diversion of 13m diameter, access roads and building facilities.

Job Description:
01. Monitoring on day to day inspection activities for civil construction practice (including tunneling, concrete and earthworks etc.).
02. Liaise closely with the QAQC Manager, Consultants, Construction Manager, Site Engineer and Supervisors.
03. Prepare Method Statements, ITP’s and Checklist.
04. Arrange & conduct site testing to be carried out in accordance with the contract specifications and standards.
05. Conduct air & water test for VC pipes on sewer drainage lines.
06. Ensure work is executed in accordance with the specification.
07. Observed procedures as required by the contract and specification standard.
08. Inspect sub-contractor’s work and making recommendations to the QAQC Manager & Construction Manager on compliance of the work to specified requirements.
09. Reviewing sub-contractors method statement and material submittals and making recommendations to the QAQC Manager.
10. Witness the asphalting work for access roads on Buildings and other Facilities.
11. Monitor the rock displacement inside the tunnel and in the slope protection area.
12. Conduct daily test monitoring on Batching Plant & Crusher Plant as per frequency of testing required.
13. Oversee quality and safety matters on the site, and ensure that the regulations are adhered to.

Site Supervising Coordinator at Hanjin Engineering & Construction Co., Ltd.
  • Philippines
  • February 1995 to May 1996

Hanjin Engineering involves in the construction of a multi-million Wharf Extension Project (5th Berth) at the Manila International Container Terminal that includes onshore/offshore pile driving, dredging and building facilities construction.

Job Description:
01. Monitor the activities of civil sub-contractors.
02. Coordinate closely to field engineer & general foreman and bringing attention to the construction manager.
03. Do surveying works such as leveling and lay-out using Transit/Theodolite and leveling machine.
04. Preparation of all data, charts, records, etc. and to record the result of surveys and features.
05. Verify the accuracy of survey data, including measurements and calculations conducted at various sites.
06. Closed coordinate with Project Engineer and Construction Manager.
07. Supervision and coordination in construction of Marine works on a Wharf extension project Berth-5.
08. Monitoring materials for excavation, backfilling and pile driving works.
09. Perform the sounding/hydrographic survey before & after the dredging works.

Site Supervising Engineer at BRAHM Industries Inc.
  • Philippines
  • October 1993 to February 1995

Brahm Industries is a local firm contractor that provides design and build for the construction of sewerage & water treatment plant and commercial building projects

Job Description:
01. Directly report to the Construction Manager all matters and obtain his approval of workforce, planning, materials and equipment, machinery requirements.
02. Construction site supervision for Sewage Treatment Plant on a high rise building.
03. Ensure correct & proper setting of machines, equipment’s and piping installation.
04. Do the daily & monthly progress reports.
05. Attend regular meeting with contractor, consultants and keeping them informed on progress in site.
06. Oversee quality and safety matters on the site, and ensure that the regulations are adhered to.
07. Resolve any unexpected technical difficulties and other problems that may arise at site any time.
08. Responsible for managing the project work allocated and in accordance with contract documents, program & within planned costs.
09. Responsible for ensuring that no delays occur due to incorrect & inadequate planning or shortage of materials.
10. Also ensure that the stages of project work allocated are completed within the planned costs and the overheads do not exceed the estimated budget allocation.
11. Provides Construction Manager with the accurate timely reports and progress of works in the project

Education

Bachelor's degree, QMS Lead Auditor
  • at ESENEK Training Center
  • May 2015

Quality Management System Auditor / Lead Auditor (IRCA -Certified)

Diploma, Internal Auditor
  • at Rastech Qatar
  • December 2012

Internal Auditor for Quality Management System (Certified - RasTech Qatar)

Diploma, Quality Assurance & Quality Control
  • at Philippines Institute of Civil Engineer (PICE-Qatar)
  • December 2012

Developing & Implementing the QAQC system on site

Diploma, PMP
  • at Project Management Certification Progam
  • September 2011

Project Management Professional

Diploma, Computer Aided Structural Analyis & Design
  • at Dela Cruz Institute of Technology
  • July 1994

Structural Analysis & Design

Bachelor's degree, Civil Engineering
  • at University of Bohol
  • October 1993

President in the Senior Student Class Organization and achieving the 3rd Honorable Mentioned as graduated

Bachelor's degree, Civil Construction And Civil Engineering
  • at University Of Bohol
  • October 1993

Specialties & Skills

Staff Supervision
Control M
Site Inspection
Civil Works
Quality Inspection
Primavera 3.0
MS Power Point
Internet
MS Word
Autocad Released-14
Basic Pipe Fitting & Welding
MS Project 2003
Driving
MS Excel

Languages

English
Expert
Filipino
Expert
Arabic
Beginner

Memberships

American Society of Quality
  • Member I.D # 65023257
  • May 2015
Project Management Institute
  • Memeber I.D#2547686
  • October 2012