Bobin Hasan, Piping Design Engineer (E3D, PDMS, SP3D, PDS)

Bobin Hasan

Piping Design Engineer (E3D, PDMS, SP3D, PDS)

Fluor Daniel Inc.,Philippines

Location
Philippines
Education
Bachelor's degree, Bachelor of Science in Mechanical Engineering
Experience
27 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :27 years, 7 Months

Piping Design Engineer (E3D, PDMS, SP3D, PDS) at Fluor Daniel Inc.,Philippines
  • Philippines
  • My current job since March 2016

Grade 4 Level 20 Engineer designation;
- This position performs work requiring advanced knowledge that is predominantly intellectual in character and which routinely exercises discretion and judgment. The advanced knowledge is in a field of science or learning and gained through a prolonged course of specialized intellectual instruction, experience, and expertise acquired in the field.

Principal Job Duties & Responsibilities;
- Designated Piping position as SP3D/PDS Design Engineer grade 4 and a Senior Piping Design Checker
- Reporting to design supervisor or Piping Lead Engineer
- Establish and lead the squad check effort for vendor equipment documentation for assigned equipment.
- Check engineering works of rotary equipment such mechanical data sheet and material requisition
preparation, technical bid evaluation with clarification to vendors, vendor document and drawing review
- Check pumps were in accordance to international standards (API610, API675, ISO5199, ASME73.1, etc.)
- Review and prepare reports, construction plans, cost estimates and specifications for assigned projects.
- Enforce appropriate safety and quality standards
- Use appropriate computer programs for engineering analysis, data acquisition and database functions.
- Communicate clearly and concisely, both orally and in writing
- Plan and manage the activities of subordinate workers; manage construction projects
- Prepare/review scopes of work for third party contracts
- Support proposal and estimate activities
- Identify deviations in job scope, estimate magnitude of changes, and initiate trends or change orders
- Deliver quality work, and adhere to the operating system requirements
- Adhere to industry codes and standards as well as department practices and procedures
- Assist in the development of department standards, procedures, practices and guidelines.
- Adhere to and support Fluor's Health, Safety & Environmental (HSE) and sustainability policies

Major Project On-going & Accomplished;
- LyondellBasell PO/TBA Plant (On-going)
The largest Propylene Oxide (PO) and Tertiary Butyl Alcohol (TBA) Plant in the world.
PO Plant is located in Channelview Complex Channelview, Texas USA. And
TBA Plant is in Bayport Complex Pasadena, Texas USA.

- Shell Penguins FPSO
Shell selected Fluor to perform the engineering, procurement and fabrication of Shell's Penguins floating production storage and offloading (FPSO) vessel in the North Sea. The FPSO will be designed to operate continuously for 20 years without dry docking and will help extend the life of the Penguins oil and gas field.

- Vopak Fuel Storage Terminal
An Engineering, Procurement and Construction Management Contract (EPCMC) for Vopak Fuel Storage Terminal in Durban, South Africa. The expansion project is part of Vopak’s program to facilitate the increased demand for fuel with cleaner specifications in Southern Africa by increasing the capacity of fuel storage at its Durban terminal.

- Dow RO Phase II
Fluor is currently providing front-end loading services for a coatings and water treatment project in Jubail, Saudi Arabia. A signed Strategic Global Engineering, Procurement, Construction (EPC) and Construction Management Agreement in support of Dow’s global capital projects program ranging across all Dow products. This three-year agreement has a two-year extension option for up to five years and includes potential new project work spanning across the globe.-

- Sasol Additional Oxygen Capacity Train 17 Outside Battery Limits project, Secunda
Located in Mpumalanga, South Africa

- Tower 03-07 under Cutbank Ridge Partnership Program for ENCANA, Dawson Creek
Located in British Columbia, Canada

- JG Summit Petrochemical Complex Expansion
- Sadara Integrated Chemicals Complex
- PETRONAS Refinery and Petrochemical Integrated Development (RAPID)

Senior Piping Designer (E3D, PDMS) at TECHNIP-FMC (formerly PT Technip Indonesia-PTTI)
  • Indonesia
  • January 2008 to December 2015

Major Roles & Duties;
- Acted as a Senior Piping-Mechanical Designer, a Lead Senior Designer and a PDMS Piping-Mechanical checker.
- Reporting to Piping Lead Engineer or may direct to HOD if necessary.
- Performed as an Area Lead Piping Designer over Pertamina onshore project Matindok Gas Development Project (MGDP).
- Designated as Piping Lead Designer for SK316 wellhead platform and PFLNG both are Petronas offshore projects.
- Implemented for a certain assigned projects as per Basic Design Principles;
- Determination of process design condition, evaluation and verification of refinery safety measures.
- Conduct proposal survey/ piping conceptual routing and layout in the preparation of plot plan or equipment arrangement.
- Preparation of piping project specifications, material requisition and other necessary design data
- Estimation of project planning man-hour and project organization.
- Estimation of bill of materials and quantities intended for the project.
- Preparation of piping information and design documents for civil/ structural which facilities/ cable routing for instrument and
electrical engineering.
- Preparation of project planning and schedule.
- Applied for a particular assigned project as per Detailed Design Category;
- Conduct site survey, locates all possible tie-in points of new and existing lines.
- Check and verify the possibility of site plant location.
- Preparation of piping layout and information.
- Evaluate/ study flexibility and thermal stress of piping systems.
- Take-off the volume and quality of material for procurement.
- Finalization of plot plan based on piping layout; refinery standard and safety requirements.
- Conducts vendor documents/ drawing review.
- Preparation of piping support specification other design data and specification for vendor and contractors.
- Finalize material specifications and requisitions.
- Final Piping Design (Final Drawing)
- Preparation of final piping arrangement and detail (isometric) drawings.
- Preparation of final bill of materials/ quantity.
- Preparation of steam tracing demolition and shop fabrication drawings.
- Preparation necessary tie-in sketches, detailed data/ documents diagram based on field condition and arrangement.
- Executed for a particular assigned projects as per Field Engineering and Construction requirements;
- Prepare field change sheets.
- Coordinate with client and sub-contractor in execution of remedial solution or any discrepancy at actual and design condition.

Accomplishments;
- FPSO topsides detailed engineering and procurement services contract, PETROBAS - Libra field, offshore Brazil
- Matindok Gas Development Project (MGDP), PERTAMINA - Central Sulawesi, Indonesia
- SK316 Development Project, PETRONAS - Bintulu, Sarawak, Malaysia
- Alliance Scheme for PFLNG Project, PETRONAS - East Malaysia Gas Field
- Jangkrik Floating Production Unit (FPU), ENI - Makassar Strait, East of Borneo
- South Mahakam Phase 3 Development, TOTAL - Mahakam delta of Kalimantan, Indonesia
- Weda Bay Nickel Project, Halmahera Island, Indonesia
- PECIKO Field Development Project Phase 7B, TOTAL - Senipa, Kalimantan Indonesia
- Koniambo Nickel Mining Project HATCH-TECHNIP - New Caledonia in Oceana
- North Belut Project, CONOCO PHILLIPS - Block B, Natuna Sea Indonesian Sector, Indonesia

Plant Engineer (Design & Construction) at BECHTEL POWER CORPORATION a joint Venture with PGESCo.
  • Egypt - Cairo
  • October 2006 to October 2007

Role & Responsibilities;
- Given a role for Plant Engineer (Piping/Mechanical System)
- Assigned as Plant Piping-Mechanical Team leader.
- Reporting to Project Lead Engineer.
- My scope are conceptual and detailed design of plant systems.
- Preparation of engineering documents which includes the developing of mechanical datasheets, request for quotation and organizing purchase order packages for rotating equipment such as centrifugal and positive displacement pumps, air compressors, and other miscellaneous equipment.
- Facilitated technical bid evaluation and recommended technically acceptable equipment vendor in accordance with project specification, codes and standards, and clients’ requirements. Perform technical bid clarification for rotating equipment and miscellaneous equipment
- Perform vendor document and drawing review for centrifugal pumps and miscellaneous equipment.
- Participated in Project management and construction management meetings which included initial operation support.
- With less instruction from project lead, I was assign to be Piping Team Leader.
- To assist a team of 8 designers to facilitate the two running power plant projects simultaneously.
- To provide and execute the conceptual design and create the 3D model of plant design accordingly.
- To meet the 2D deliverables within schedule prior to immediate procurement/fabrication/construction
demands respectively.
- Responsible for power plant piping design and providing piping deliverables of an assigned Areas and scope of work.
- Was mobilize to project site to exert more site engineering activities.
Accomplishments
- El Tebbin 2x350 MW Combine Cycle Thermal Power Plant (Gas Fueled), Al Qahirah, Helwan, Western Cairo, Egypt.
Plant Description
- El Tebbin power project is design to include a 2×350 MW thermal power plant to interconnect with the National Unified Power System (NUPS) through a GIS 220 KV switchyard. The power block is comprised of two identical Rankine cycle turbine generator units, each with a nominal rated capacity of 350 MW. The units are capable of generating rated capacity using natural gas, residual (mazout) oil, or a combination of both. The two-unit station arrangement includes an enclosed turbine building, an open boiler building, a common control room and all associated structures and facilities. The facility includes a water treatment plant that provides make-up water to the cycle. A 220 KV GIS switchyard evacuates the generated power to the national grid.
The project contracting plan utilized a multi-package system. Eighteen (18) contracting packages and purchase orders procured the equipment and services.

- Kureimat III Power Plant 750 MW, Upper Egypt.
Plant Description
- Kureimat III power project includes a power block that consists of two 250 MW combustion turbine generators (CTGs). Each one feeds exhaust gases to its respective heat recovery steam generator (HRSG). Steam from two HRSGs feeds one 250 MW (nominal), reheat, condensing steam turbine generator (STG). The estimated 750 MW net output is achieve by burning natural gas in the CTGs without supplementary HRSG firing. Nitrogen Oxide emissions are control by dry low-NOx (DLN) combustors. An inlet air filtration system supplies filtered combustion air to the CTGs. The steam exhausted from the steam turbine feeds into a once-through cooling, single-pass, divided water-box condenser. Power is generated at manufacturer standard voltage in the CTGs and the STG, stepped-up through main transformers and fed to the utility grid via the extension of the existing 220 kV, gas-insulated switchgear (GIS) switchyard. The Nile River provides the plant cooling water. The project-contracting plan utilized a multi-package system. Five (5) contracting packages and purchase orders procured the equipment and services.

Piping Design Engineer at Consolidated Contractor Company (CCC)
  • Oman - Muscat
  • September 2005 to September 2006

Main Responsibilities
- Hired for Piping Design Engineer role (Office & Field/Site Engineering).
- Main Job Assignment is for a refinery revamp demolition and construction projects.
- Given an assignment as a Site Engineer and a Piping-Mechanical checker of Isometric Fabrication, Spool drawing, Line Checking and regular Field Supervision & Construction supports.
- Reporting directly to site Project Engineer and head office Piping Lead Engineer.
- Was mobilize to jobsite in Oman for Site Engineering, Field Supervision & Construction Supports.
- Overall Supervision of including such as: HSE, House Keeping, piping prefabrication including pipe supports, piping erections including pipe supports, spool pieces control, check and monitor tools, equipment and welding consumables, check and monitor preservation, pipe internal cleaning for small bore and large bore.
- Schedule monitoring for manpower mobilization welding Dia-inch, No. of spools and Pipe Supports.
- Consult Engineering problems and Check and consult spools delivery in site.
- Check work front and coordinate with other disciplines.
- Request scaffolding constructions.
- Ensure work permits (confined space welding, grinding, erection, work for high level, etc).
- Check flange alignment.
- Follow Up of punch work.
- To designed new piping system or a modifications to existing process piping systems.
- Exerted an effort and with tight coordination among team at head office in Abu Dhabi, UAE.
- Started utilizing l-Sketch lntergraph software or design tools to formulate and extract an Isometric with MTO.
- Thoroughly check and re-check each Isometric and fabrication materials for immediate
procurement prior to demolition schedule.
Accomplishments
- lsomerization of Mina Al-Fahal (lPMF) Refinery Revamp Project
Located within ORPIC premises in Muscat, Oman.

Mechanical Design Engineer at COWI & Partners L.L.C (Consulting Engineers and Planners)
  • Oman - Muscat
  • January 2005 to August 2005

Responsibilities & Accomplishments;
- Designated as Mechanical-Piping Team Leader.
- Ability to interpret engineering plans and calculations.
- Provide technical clarification on vendor's proposal and ensure engineered equipment complies with specification requirements.
- Prepare Mechanical Data Sheet and Material Requisition preparation, Technical Bid Evaluation with clarification to Vendor, Vendor Document and Drawing review. Other responsibilities include technical meeting with client, coordination with related engineering discipline and Vendor.
- Responsible for Engineering matters for the design, installation, and pre-commissioning of mechanical works for fire equipment and both static and rotary equipment.
- Review and prepare reports, construction plans, cost estimates and specifications for assigned projects.
- Enforce appropriate safety and quality standards.
- Use appropriate computer programs for engineering analysis, data acquisition and database functions.
- Communicate clearly and concisely, both orally and in writing.
- Plan and manage the activities of subordinate workers; manage construction projects.
- Familiar with automotive and industrial components and their function.
- Analysis for cost, manufacturability, safety, durability, serviceability of existing and proposed designs.
- Worked with other (Cowi) Danish Mechanical Engineers & Local Mechanical Designers for the Design of Chiller Plant, Mechanical-Electrical-Plumbing (MEP) & HVAC System of the new two (2) Muscat & Salalah International Airports.
- Larsen is in charge for the Architectural activities.
- Resigned after 8 months and upon completion of my assigned task.

PDS Piping Designer at Dash Engineering Philippines Inc.
  • Philippines
  • June 1996 to December 2004

Main role & Responsibilities;
- A Subsidiary company of Mitsui Engineering & Shipbuilding Co., Ltd (MES) located in Tokyo, Japan.
- Became a Piping Group 1 Sub-group Leader and a PDS model & Iso Piping checker.
- Reporting direct to Piping Group 1 Leader.
- Obtained a solid 8 years term permanent staff-working career and a well trained by various Japanese Engineers.
- In the year 2001-2002, completed a year OJT in Mitsui Engineering & Ship building (MES) Head office.
- While in OJT, had visited project site location for Vaccum Expansion Project located in Nagoya, Japan.
Accomplishments;
- Vaccum Expansion of IDEMITSU Petrochemical Plant, Nagoya, Southern Japan
- South Pars Gas Field Project (Phases 6, 7& 8), Assaluyeh, Iran
- SMPC2 to SMPC3 Expansion Project, Rayong, Thailand
- SLEU Project, Hull, United Kingdom
- TPRC Project, Rayong, Thailad
- SPP Project (Singapore Polypropylene & Polymerization Plant), Jurong Island, Singapore
- PA Project Pulau Sakra, Singapore

Education

Bachelor's degree, Bachelor of Science in Mechanical Engineering
  • at Western Mindanao State University
  • April 1995

Specialties & Skills

PDS Intergraph
PDMS Aveva up to 12.4 version
MicroStation Bentley
Intergraph SP3D
Autodesk Autocad up latest 2021 release version
Caesar II - Stress Analysis
Aveva E3D

Languages

English
Expert
Arabic
Beginner
Indonesian
Intermediate

Memberships

Philippine Society of Mechanical Engineers (PSME)
  • Registered Mechanical Engineer(RME) with Professional Certification Reg. ID/nos. 49747
  • May 1996

Training and Certifications

Bobin Hasan_FLUOR-COE (Certificate)
Date Attended:
October 2016
Bobin Hasan_TECHNIP COE (Certificate)
Date Attended:
December 2015
Bobin Hasan_BECHTEL-PGESCO_COE (Certificate)
Date Attended:
November 2007
Bobin Hasan_CCC_COE (Certificate)
Date Attended:
October 2006
Bobin Hasan_COWI_COE (Certificate)
Date Attended:
September 2005
Bobin Hasan_DASH ENG-COE (Certificate)
Date Attended:
December 2004
Bobin-Intergraph 2012 SouthEast Aisa Seminar by Intergraph (Certificate)
Date Attended:
July 2012
Bobin Hasan_Long Service Award by Technip (Certificate)
Date Attended:
March 2013
Bobin Hasan_Expert Sharing Session by Technip (Certificate)
Date Attended:
October 2014
Bobin Hasan_HSE-PULSE for the Workforce by Technip (Certificate)
Date Attended:
December 2014

Hobbies

  • Sports and Understanding about HSE
    Thru technip program about HSE. Im fully aware now the importance of HSE at any working environment.I had understood and learned the 12 safety actions.