Total Years of Experience: 19 Years, 6 Months
July 2010
To Present
Electrical Section Engineer
at MID Contracting
Location :
Jordan - Amman
The Abdali Boulevard Project
Type : Mixed use Commercial and residential.
In the capacity of a Section Engineer, the duty is to supervise al l remaining electrical works according to updated time schedules, Works inspections, testing for existing work s (wires and cables) and Preparing for 3rd fix installations.
The Abdali Boulevard, located in the heart of the Abdali new Downtown will comprise of a tot a l built up area of 224, 000 sqm. Set to become a major regional shopping and visiting destination, the 'Boulevard' will consist of a 370 meter long and 21 meter wide Pedestrian strip outlined by 12 buildings, averaging 9 floors (above Ground) each, and will host over 130 retail shops, 400 luxurious five- star serviced apartment s .
Type : Mixed use Commercial and residential.
In the capacity of a Section Engineer, the duty is to supervise al l remaining electrical works according to updated time schedules, Works inspections, testing for existing work s (wires and cables) and Preparing for 3rd fix installations.
The Abdali Boulevard, located in the heart of the Abdali new Downtown will comprise of a tot a l built up area of 224, 000 sqm. Set to become a major regional shopping and visiting destination, the 'Boulevard' will consist of a 370 meter long and 21 meter wide Pedestrian strip outlined by 12 buildings, averaging 9 floors (above Ground) each, and will host over 130 retail shops, 400 luxurious five- star serviced apartment s .
June 2013
To Present
Automation Manager
at BESIX
Location :
Saudi Arabia - Jeddah
November 2009
To July 2010
Construction Manager
at ELREHA MAJOR PROJECTS
Location :
Jordan - Aqaba
PROJECT:-
Movenpick Resort Tala Bay Extension (SPA)
In the capacity of a Construction Manager, the duty is to lead the Electrical and Mechanical team through the different stages of construction till the final commissioning. DUTIES:
Shop Drawing. (Review, submit, approve).
Materials Take Off.
Material Submittals.(Review, submit, approve)
Site works supervision (electrical).
Coordination with Mechanical, structural and Architectural Departments.
Procurement
Inspection Requests.
Weekly E/M Works Progress Reports
Log sheets.
Preparing for Payments
. Project Description The project is a Luxurious SPA in Movenpick TALA Bay, which is considered One the best SPAs in Jordan. It is Equipped with professional SPA Equipments And Cabins from Thermarivm SPA Design and Manufacture.
Movenpick Resort Tala Bay Extension (SPA)
In the capacity of a Construction Manager, the duty is to lead the Electrical and Mechanical team through the different stages of construction till the final commissioning. DUTIES:
Shop Drawing. (Review, submit, approve).
Materials Take Off.
Material Submittals.(Review, submit, approve)
Site works supervision (electrical).
Coordination with Mechanical, structural and Architectural Departments.
Procurement
Inspection Requests.
Weekly E/M Works Progress Reports
Log sheets.
Preparing for Payments
. Project Description The project is a Luxurious SPA in Movenpick TALA Bay, which is considered One the best SPAs in Jordan. It is Equipped with professional SPA Equipments And Cabins from Thermarivm SPA Design and Manufacture.
September 2007
To November 2009
Electrical Project Engineer.
at AL-HAMAD FOR CONSTUCTION AND DEVELOPEMENT
Location :
Jordan - Amman
THE MISSION WAS TO LEAD THE ELECTRICAL TEAM THROUGH DIFFERENT STAGES OF CONSTRUCTION TILL THE FINAL COMMISIONING IT INCLUDES and not limmited to THE FOLLOWING:-
1-SHOPDRAWING REVIEW SUBMIT APPROVE;
2-MATERIAL SUBMITTALS
3-SITE WORKS SUPERVISION
4-COORDINATION WITYH ALL DEPARTMENTS
5-MATERIAL REQUESITIONS
6-INSPECTION REQUESTS
7-PROUREMENTS
8-COMMISIONING
1-SHOPDRAWING REVIEW SUBMIT APPROVE;
2-MATERIAL SUBMITTALS
3-SITE WORKS SUPERVISION
4-COORDINATION WITYH ALL DEPARTMENTS
5-MATERIAL REQUESITIONS
6-INSPECTION REQUESTS
7-PROUREMENTS
8-COMMISIONING
May 2006
To September 2007
Electrical Site Engineer
at CEEC (Consilidated Electromechanical Engineering Contracting)
Location :
Jordan - Amman
PROJECT:-
Khilda Design Center.(CEEC)
DUTIES:
Supervised the execution of the electrical works.
Inspection Requests
Quantity Surveying.
Project Description The project is a modern commercial building, located in Khilda area, consisting of 90 galleries and shops, 16 offices and underground parking, with a total area of 22000.0 m2. (Shell & Core).
Khilda Design Center.(CEEC)
DUTIES:
Supervised the execution of the electrical works.
Inspection Requests
Quantity Surveying.
Project Description The project is a modern commercial building, located in Khilda area, consisting of 90 galleries and shops, 16 offices and underground parking, with a total area of 22000.0 m2. (Shell & Core).
November 2005
To April 2006
Electronic-Electrical Site Engineer
at World of Lights
Location :
Jordan - Amman
PROJECT:-
Kempinski Hotel Ishtar.(World Of Lights)
DUTIES:
Inspection of lighting circuits.
Programming Dimming Scenes, and preparing schedules.
Troubleshooting dimming system components
Final Commissioning for the Lighting control system.
Project Description The project is a Luxurious 5 star Hotel in the Dead Sea Area, World of lights was the supplier for the lighting fixtures and the lighting control system.(Lutron Lighting Control System).
Kempinski Hotel Ishtar.(World Of Lights)
DUTIES:
Inspection of lighting circuits.
Programming Dimming Scenes, and preparing schedules.
Troubleshooting dimming system components
Final Commissioning for the Lighting control system.
Project Description The project is a Luxurious 5 star Hotel in the Dead Sea Area, World of lights was the supplier for the lighting fixtures and the lighting control system.(Lutron Lighting Control System).
Share on Facebook
Share on Twitter
Share Via Email