Electro mechanical Engineer
DB Shapriya Company ltd
Total des années d'expérience :2 years, 6 Mois
Main project features:
Erection of molasses, fermentation, distillation and alcohol storage tanks
Erection of steel members for fermentation, distillation and alcohol structures
Installation and alignment of distillery plant equipments
Roofing of all steel structures at the plant
Preparation of construction progress report in the format agreed by the stakeholders
Commissioning of distillery plant (extra neutral alcohol-spirit) installed equipment
Activities performed:
Erection of one carbon steel Molasses tank with a capacity of 3600m3, weighing 152200 kg when empty using Jack system
Erection of 4 Nos stainless steel Fermentation tank with a capacity of 188m3, weighing 11100 kg when empty using Crane system
Erection of 2 Nos carbon steel alcohol storage tank with a capacity of 1200m3, weighing 43000 kg when empty using Jack system
Erection of column and beam steel structure building up 32.5m height.
Prepare list of working tools for tanks erection
Prepare list of consumable material for tanks erection
Prepare list of material handling tools during offloading and tanks erection
HSSE induction at site.
Scholarship in Maintenance Management Main project features: Equipment operation and maintenance, Pump and valve parts design, manufacture, assembly, factory testing, installation and commissioning during industrial training at KSB pump factory at Pegnitz in Nurberg. Positions held: Industrial Trainee Engineer Activities performed: Design and Quality assurance of the pump and valve parts. Assembling of valve, pump parts including factory testing Use of computer aided machine in spare parts fabrication. Assessment of the damaged pump parts and the cost involved Use of robot in Material handling Packing of the assembled equipment