Consultant Oil and Gas Well Services / EOS Energy LLC - Independent professional
EOS Energy LLC - Independent / By myself
Total des années d'expérience :39 years, 0 Mois
At the moment I am without a formal job, and I dedicate myself to try to make independent professional consultancies
Being Professor of the Chairs: Productivity and Quality Management and Research Seminar
Organize the structure for work, equipment and personnel to carry on the project of Increase of Productivity in the field DZO, Zulia, Venezuela, which includes lines of work such as Hydraulic and Acid Fracturing, Operations with Coiled Tubing, Operations with Electric and Slick Wire Line, Operations with Corod Workover Rig, Well Testing Operations, etc., and preparation of the economic offer with the corresponding APUs, (Prices Unit Analysis) technical offer, well analysis, elaboration of programs with recommendations, search of equipment and allies that allow carrying out a Successful Project Management.
Adviser to the Company Shandong Kerui with technical assistance to get new contracts with new project since technical point of view.
Working with Shandong Kerui Petroleum Equipment in four basic areas:
1./ Ayacucho Project (Reactivation an Oilfield heavy oil in East Venezuela, This project has an execution amount of approximately USD 1000 million) / San Tome Bidding Process Turn Key to reactivating oilfields well,
2./ Flexible Pipelines project in the West of Venezuela, approximately with a contractual amount of 300 millions dollars,
3./ Technical Assistance and Tech Speech for the
personnel,
4) And Technical Support in Marketing and commercial meeting (Business Development with
companies)
Position the company Venpetech, in the oil and gas Industry market, in the areas of Engineering
Personnel Training and Operations, in drilling fluids solids control based brine fluids, well cementing,
well stimulation, sand control, Coiled Tubing Operations, Geology and Reservoir. Entering at the
market for drilling fluids and solids control, fluid pumping and preparation of pickles brine.
There are three basic functions of this position: a) Development of Construction Project Training Center and training plans for staff development engineering and laboratory services in the different business units. b) Guide, develop and implement research activities in the area Pumping Services (cementing, stimulation, gravel packing and fracture), Coiled Tubing, Snubbing Operations, Environmental Control, Completion, Drilling Fluids, and other lines of business. c) Promoting a work environment in which the challenges and career development must be considered key to developing motivation, recruitment and retention of staff in the company.
Meeting the goals and targets set in the strategic plan of the company, from the point of technical, operational, administrative, financial terms, sales management, professional development of staff, etc.
Goals: Sales increase in the District during my tenure, taking them from 1.6 mm to 7.5 MM USD Monthly USD in the period of three years (July, 2014). It manages to take the West District of the company to be the operational base with better "profit" with better operating and net Dower (2013 - 2014). During my term, it is achieve that the West District is the only operational base in the cement market during two years. Great deals on prices and profitability have been taken in the West District, since the company exists, won in competitive bidding by the respective business analysis, definition of prices of services and strategies are achieved. (lapse years, 2011-2014). Awards received by the community in which we operate (plate recognition).
My management encouraged staff to raise their academic level.
I have been in charge of duties related with the Cementing and Stimulation operations and Rigless work-over Operations (Snubbing and Coiled Tubing), since point of view operational and technical.
Goals: During my management, the company got better position in specifically markets related to coiled tubing and snubbing, basically, for operational deficiencies and lack of marketing existing in the management preceding.
I have been in charge of the operations related to oil wells cementing, since point of view technical and research development
Goals: During my management, the company was achieved solidly position from the technical point of view PDVSA, due to assisting in the activities of well cementing and converting the company in the number 1 in the Western District of Venezuela.
I have been in charge of the East District Station, in Venezuela, from the point of view operational, technical, administrative, human resources, community relations logistics and sales. This operating station produced 2.5 million dollars per month, in the last year, 2004
Responsible of the operations since technical point of view, technical assistant of the Vice President of Operations, put in the market new technologies.
Accomplishments:
New technologies related for control of gels of water production, treatment for increased productivity, low-density slurries, and stimulation with alcohol. Additionally, entering new markets and companies
Skills Used:
Great technical knowledge, persuasion, conviction, persistence, sales capacity.
Technical responsible of operations, technical assistant of district operation manager, penetrate the market with new technology.
Achievements:
Position the company BJ Services in the market as the leader in services to well above Schlumberger and Halliburton in the east of the country (Venezuela). Cementing of wells at depths of 21, 000 feet and slurries with greater than 18 lbs / gal densities. Entering the market well stimulation, enter the company in the market FRACTURE wells, using resin-coated sand, innovative technology at these time. Stimulation with alcohol among others.
Skills Used:
Great technical knowledge in the areas of technical business in which participates, persuasive, convincing, persevering, good ability in sales. High capacity working days.
Student of Master Petroleum Geology at the University of Zulia, begun in 2015 and scheduled to culminate at the end of 2016 or the beginning of 2017. The Graduate Program in Master Petroleum Geology aims to provide petroleum engineers, geologists and university professionals related, advanced knowledge in geology, in order to expand its scope in the various phases of the petroleum geology to achieve maximum success in the decisions arising from the hydrocarbon industry. Facing the best use of mineral resources.
Magister Scientiarum in Business Management, Operations Statement. Master Thesis: Research conducted "Operational Strategic Management from the perspective of Balanced Scorecard in companies of the Oil Industry". The Master of Business Management of the illustrious University of Zulia, is framed in the Faculty of Economics, and has 25 years of existence since its inception; It is considered the School of Management of Zulia State. It is focused on preparing human resources with the necessary and sufficient to address the Business Management tools.
Academic discipline at university level, created by the University Rafael Belloso Chacin to prepare human resources with basic tools in the technical disciplines involved in the development of a comprehensive productivity solution Hydrocarbons, set in the Reservoir area - Well - Surface. Duration of 168 academic hours over a period of 7 months with Certificate of Approval of the University.
Academic discipline structured by the University Rafael Belloso Chacin to prepare human resources with the basic tools in the disciplines involved in developing an Integrated Reservoir Study. Duration of 168 academic hours, over a period of seven months, with Certificate of Approval of the University.
Academic specialization, structured by the University of Zulia, in order to prepare the human resources, with basic theoretical tools in technical disciplines and knowledge in construction of hydrocarbon wells. Duration of 168 academic hrs Diploma in seven months, with certification of the University, upon approval of final examinations.
The aim of postgraduate studies in Petroleum Engineering is to provide participants with the tools necessary for the development of advanced technology that allows maintain and optimize existing methodologies in the oil industry, for the proper use of hydrocarbons. Technical paper: Research conducted “Slurries design with the grain packing theory in Tomoporo’s wells”.
The aim of the School of Civil Engineering, is provide for students the theories and technical foundations necessary to understand, conceptualize, visualize and troubleshoot and civil engineering works that are presented in their different professional areas, such as the Structural area, Roads, Hydraulic, and Water treatment. Pre-grade thesis: Research conducted “Capacity biaxial flexural compression of reinforced concrete short columns of variable section”