شاندرا دودي, Designation Performance Engineer

شاندرا دودي

Designation Performance Engineer

Qatar Power Company

البلد
قطر - الدوحة
التعليم
ماجستير, Mechanical Engineering
الخبرات
24 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :24 years, 0 أشهر

Designation Performance Engineer في Qatar Power Company
  • قطر
  • أشغل هذه الوظيفة منذ يوليو 2012

Operation manager

Performance Engineer في Qatar Power Company
  • قطر
  • أشغل هذه الوظيفة منذ يوليو 2012

Ras Laffan-B) - Doha Qatar
Duration :

Commercial manager
  • ديسمبر 2009 إلى يونيو 2012

Plant Configuration 1025 MW CCPP & 60 MIGD Water plant
Siemens STG5-4000F (V94.3A) x 3 GTs & Siemens 2 X STs
Doosan make MSF (4 x 15 MIGD)
* Previous Organizations:
* Organization Emirates Aluminum (EMAL), Abu Dhabi
Division Power plant operations

في Emirates Aluminum Company
  • كندا
  • ديسمبر 2009 إلى يونيو 2012

Role : Plant operations
Plant Details Combine Cycle Power Plant - 2000 MW with 6 x 9FA GE Gas Turbine (6x
255.6 MW Capacity) DLN 2+ Combustor & 2x C7GE Steam turbines (2 x 241
MW Capacity).
* Responsibilities includes safe and efficient operations of Gas turbines, HRSG, Steam
Turbine, Balance of plant, RO plant and handling operational emergency situation the plant.
* Isolations and de-isolations of HRSG, GT, ST, Low and High capacity Pumps, 220KV and
33 KV switch yards, Transformers, Circuit Breakers, 415V bus bar.
* Worked with plant commissioning team during plant phase-1 commissioning and
coordinated for startup /shutdown activities and successful execution of PG test.
* Preparing and modifying operating procedures and emergency procedures.
* Raising plant Mechanical and Electrical defects for maintenance to confirm availability and
reliability of the system
* Preparing and maintaining reports regarding Daily shift log sheet.
* Following on Jobs safety and strictly compliance with EMAL safety policies.
* Raising Environment, Health and Safety “Hazards Notifications” and ensuring it attained.
* Raising “Near-miss” in the plant and ensuring the cause is eliminated.

Working Period في Chandrashekhar Dudhe
  • أكتوبر 2006 إلى نوفمبر 2009
في General Electric
  • الهند
  • أكتوبر 2006 إلى نوفمبر 2009

Performance analysis engineer
Division : Power Plant Engineering Division
* Major responsibilities include simulating the Gas Turbine operations using GATE Cycle and
provide corrective actions before commissioning of plant.
* Combine cycle plant pre commissioning performance using GATE cycle and transient
analysis of plant operations using HYSIS software.
* Analysis for technical operation and test results to increase plant efficiency. Conducting
performance analysis of combine cycle power plant.
* Evaluation of plant utilities consumption, analysis of individual equipment operating
efficiency, economic operation, and energy management solutions.
* Operating condition analysis support for the engineering department during implementation
of plant improvement engineering projects
* Analysis of the site issues on Balance of Plant and GT, ST accessories & interacting with
customers to solve the equipment troubles.
* Optimization of GT and ST - Balance of Plant System, Preparing P & IDs and sending it to
vendors for the fabrications and interacting with vendors.
* Preparing technical specifications of GT and ST accessories and getting quotes for various
power plant systems, Piping from vendor and doing selection on cost analysis.
3. Organization : China Light & Power (CLP) - Bharuch, Gujarat - India

Designation Assistant Team Manager
  • أغسطس 2004 إلى سبتمبر 2006

Plant Configuration 655 MW Combine cycle plant
Siemens V 94.2 x 3 GTs + 1 x ST
* Organization Forbes Marshall Ltd, Pune
Designation Energy Auditor
Division Energy Management Division

Assistant Team Manager
  • أغسطس 2004 إلى سبتمبر 2006

Power plant operations
Plant Details : 655 MW Combine cycle power plant with 3X 138 MW Siemens V94.2
GTs and 1 x 241 MW Siemens steam turbine.
* Key responsibilities include safe and Efficient Operations of Gas Turbines, Boilers, Steam
Turbines & 220KV and 400KV switchyard Operations from Control room (DCS operations).
* Handling Operational emergencies and restoring plant back to normal operating conditions.
* Daily Log sheet preparations, Preparing/ updating operating procedures.
* Isolations and de-isolations of HRSG, GT, ST, Low and High capacity Pumps, 220KV/400
KV/66KV switch yards, Transformers, Circuit Breakers, 415V bus bar.
* Preparing the work permits (In software Nisoft/ Eclipse) for enabling safe maintenance of
mechanical and electrical equipments and doing the necessary isolations and de-isolations
of the equipments after the work has been completed.
* Co-ordination with State Electricity Board (Gujarat), Load Control Center (Gujarat), Regional
electricity Board (Western Region) and Natural Gas & Naphtha suppliers such as GSPL,
GAIL, CAIRN Energy and IOCL.
* Preparing and maintaining reports regarding Daily shift log sheet, Daily Generation Data and
Fuel Consumption, Machine Trips, Equipment Non-availability and Water Chemistry.
* Identify faults and notify the same to the Maintenance Coordinator through the Plant
Maintenance Management Software (Maximo), raise system modifications and Energy
conservation proposals.

في PRESENT JOB PROFILE
  • أبريل 2000 إلى يونيو 2004

Plant Configuration Energy auditing of power plants and process industries

Energy Auditor في Forbes Marshall Ltd
  • الهند
  • أبريل 2000 إلى يونيو 2004

Plant Details : Power and Process Industries
* Key responsibilities include driving and managing energy efficiency activities, project
execution, co-ordination and team management.
* Experienced in identifying and prioritizing energy saving measures and analyzing technical
& financial feasibility of energy saving measures. Experienced in taking process
improvement and energy reduction initiatives for enhancing plant efficiency
* Played a key role in collecting & evaluating the data on operating parameters, developed the
energy savings proposals, formulated detailed energy savings, study reports and
successfully monitored/verified the implementation of proposals.
* Energy audit experience on Coal fired Boilers, steam turbines, gas turbines, HRSG, steam
and condensate, Insulation, Compressed air, pumps, blowers, Condensers & cooling
towers. Hands on experience of Energy audit project conducted in process industries,
petrochemical industries and power industries. Preparing energy audit reports and reporting
to customers, presentations to customers on energy audit projects implementations,
investment and payback. Coordinating for energy conservation project implementations

Performance Engineer في Qatar Power Company
  • قطر
  • إلى

Doha Qatar
Contact No: 00974-55841088
shekhar_energy@yahoo.co.in
* Organization China Light and Power (CLP) - India

الخلفية التعليمية

ماجستير, Mechanical Engineering
  • في Devi Ahilya UniversityRajeev Gandhi CollegeBureau of Efficiency (BEE)
  • يناير 2013

of Engineering research and technology, Nagpur University with first division.

بكالوريوس, Mechanical Engineering
  • في Devi Ahilya UniversityRajeev Gandhi CollegeBureau of Efficiency (BEE)
  • يناير 2013

of Engineering research and technology, Nagpur University with first division.

ماجستير, Energy Management
  • في Bureau of Energy Efficiency

in

بكالوريوس, Energy Management
  • في Bureau of Energy Efficiency

in

بكالوريوس, Energy Management
  • في Bureau of Energy Efficiency

in

Specialties & Skills

BALANCE
ENGINEERING
MANAGEMENT
MECHANICAL
PERFORMANCE ANALYSIS
PROPOSAL WRITING
REPORTS
SIEMENS NIXDORF HARDWARE
SWITCHES