Chester لي, Senior Quantity Surveyor

Chester لي

Senior Quantity Surveyor

Melco Crown Philippines

البلد
الفلبين
التعليم
بكالوريوس, Civil Engineering
الخبرات
18 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 7 أشهر

Senior Quantity Surveyor في Melco Crown Philippines
  • الفلبين
  • أشغل هذه الوظيفة منذ يناير 2014

Project: City of Dreams, Manila
http://www.cityofdreams.com.ph/

City of Dreams Manila is a casino, hotel, retail and entertainment integrated resort in Manila. Comprising of six hotel towers, including Nobu Hotel, Crown Towers and Hyatt City of Dreams Manila - with a combined total of approximately 950 rooms, including VIP and five-star luxury rooms and high-end boutique rooms, suites and villas, numerous specialty restaurants and bars, gaming facilities, and a multi-level car park.

Value: USD 875 Million

Responsibilities:
• Directly reports to the Commercial Director, and responsible for an integrated team of Senior Quantity Surveyors and Project Quantity Surveyors under Langdon & Seah Philippines and Leighton Contractors (Philippines), executing change management, and administration of trade contract packages.
• Identified costs that are recoverable from the company’s local partner, SM/Belle Corporation, prepared cost claims worth USD 40 Million, and interfaced with SM/Belle Corporation’s quantity surveyors for the agreement of costs.
• Maintain / review status of open change orders, from budget to final agreement with contractors, and develop courses of action for closure.
• Ad hoc reporting for senior management which include monthly cost forecasting of variations, contra-charges, final accounts, and Additions and Alterations works postopening.
• Assisted in the procurement of FF&E items for the project.
• Handle design changes, variation orders, queries and deviations.

Project Quantity Surveyor في Carillion Qatar
  • قطر - الدوحة
  • مارس 2012 إلى ديسمبر 2013

Project: Msheireb Downtown Doha Project (Phase 1B) - Doha, State of Qatar
http://mdd.msheireb.com

The project is a mixed-use development situated in the centre of the city featuring premier office space, retail, leisure facilities, townhouses, upscale apartments, hotels, museums, civic services, and cultural and entertainment venues.

FIDIC Conditions of Contract: Conditions of Contract for Construction, For Building and Engineering Works Designed by the Employer, First Edition 1999, amended by the Particular Conditions of Contract
Contact Type: Lump Sum
Value: USD 630 Million

Responsibilities:
- Change management, checking of variation order submissions prepared by the QS team, preparation, submission, and settlement of variation orders.
- Updates and maintains the change order register for each job of the team.
- Management of the variation submission program of the QS team.
- Performs detailed take-off from drawings and specifications.
- Assists the Commercial Manager in developing tender, proposal, and subcontract orders.
- Manages commercial subcontractor packages and implemented administrative procedures necessary for the smooth running of a construction contract, such as procurement, valuing change, issuing of instructions, valuing construction work for interim payments, assessing and compiling claims.
- Assists junior members of the team.

Project Quantity Surveyor في Al Futtaim Carillion
  • الإمارات العربية المتحدة - أبو ظبي
  • مايو 2010 إلى أبريل 2011

Project: Al Bahr Towers - Abu Dhabi, UAE
http://www.afcarillion.ae/AFCAbuDhabi/projects/albahrtowers.html

The project comprises two 20, 000m² steel frame construction office towers of approximately 26 occupied storeys located above a linking podium. The crystalline/honeycombed structure of the towers is designed with diaphanous screen to form a dynamic Mashrabiya (Opening and closing in response to the sun's path).

FIDIC Conditions of Contract: Conditions of Contract for Construction, For Building and Engineering Works Designed by the Employer, First Edition 1999, amended by the Particular Conditions of Contract
Contact Type: Lump Sum
Value: USD 330 Million

Responsibilities:
- QS in charge for the commercial management of the Curtain Walling and Mashrabiya contractor (Shenyang Yuanda Aluminium Industry Engineering Co. Ltd), Roofing contractor (Arabian Profile Co. Ltd), and of the Structural Steelwork contractor (William Hare UAE LLC) among others.
- Managed the supply chain and implemented administrative procedures necessary for the smooth running of a construction contract, such as procurement, valuing change, issuing of instructions, valuing construction work for interim payments, assessing and compiling claims, and agreeing final accounts.
- Established and prepared contractual correspondences.
- Negotiated and agreed variation orders with the client’s cost consultants.
- Assisted the Commercial Manager in developing tender, proposal and subcontract orders.
- Compiled tender documentation such as letter of invitation, form of Tender, health and safety documentation, design documentation and contractual details.
- Carried out costing of construction works by methods such as tendered rates, quotations or dayworks.

Quantity Surveyor في Al Futtaim Carillion
  • الإمارات العربية المتحدة - أبو ظبي
  • مايو 2008 إلى فبراير 2010

Project: The Yas Hotel - Abu Dhabi, UAE
http://www.afcarillion.ae/AFCAbuDhabi/projects/yasisland.html

The project comprises two elliptical 8 and 6 storey Hotel towers, one on land and one in a Marina linked by a bridge providing views of a Formula 1 racetrack underneath. Both buildings are covered by a unique architectural Shell Cloak Structure which incorporates specialist lighting effects.

FIDIC Conditions of Contract: Conditions of Contract for Construction, For Building and Engineering Works Designed by the Employer, First Edition 1999, amended by the Particular Conditions of Contract
Contract Type: Cost plus
Value: USD 630 Million

Responsibilities:
- QS in charge for the commercial management of the Curtain Walling contractor (Permasteelisa Gartner Middle East), Hotel Gridshell contractor (Waagner Biro), and of the Interior fit-out contractor (Al Tayer Stocks) among others.
- Managed commercial subcontractor packages worth over USD 130 million.
- Negotiated and agreed variation orders with the client’s cost consultants.
- Negotiated and secured final account agreement with client and subcontractors.
- Prepared cash flow forecasts and progress reports.
- Measured and determined quantities both for payment application and material procurement.
- Evaluated subcontractor’s interim payment applications.

.

Cost Estimator / Site Engineer في Dwightsteel Building Systems Inc
  • الفلبين
  • ديسمبر 2004 إلى أبريل 2008

-Performed cost estimates of long span metal roofing, cladding, insulation materials, roll-up doors, and structural floor decking based on plans and specifications.
- Supervised installation activities on site.
- Directed subcontractors and coordinated a wide variety of construction field activities.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في University of Santo Tomas
  • مارس 2003

- Dean’s List: 1st semester, SY 2000-2001. 1st semester, SY 2001-2002. 2nd semester, SY 2001-2002.

Specialties & Skills

Contract Management
Quantity Surveying
Procurement
AutoCAD
Microsoft Office
MS Project
MS Excel
MS Powerpoint
MS Word

اللغات

الانجليزية
متمرّس
التاغلوج
متمرّس

العضويات

Philippine Institute of Certified Quantity Surveyors (PICQS)
  • Corporate member
  • January 2013
Australian Institute of Quantity Surveyors (AIQS)
  • Corporate member
  • September 2013
Royal Institution of Chartered Surveyors (RICS)
  • Associate member
  • October 2013