chillala narayana, site manager

chillala narayana

site manager

al futtaim carillion

البلد
الإمارات العربية المتحدة
التعليم
ماجستير, Project management
الخبرات
15 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :15 years, 10 أشهر

site manager في al futtaim carillion
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ يوليو 2008

Dubai mall fountain demolition and reconstruction works .
Avenue phase 1 construction and infra works . Dubal potline construction including RT and substation structural works.
EMAL potline 1 & 2 structural works, heavy slabs casting and installation works. Storm water, Drainage line and infra works .
DUBAL construction of SILO 8 foundation works, Roads and infrastructure works related to the project.
Construction of new IKEA mall at Yas island, Abu dhabi .
Construction of UAE university staff accommodation, Hostel, Canteen, Olympic stage level swimming pool structural works .
G+27 and G+29 G+55 and G+57 Boulevard central towers construction at Burj khaleefa, Down town area. .
Infra structure works at Burj down town area including Storm water drain, Irrigation line, structural works .
Lemeridien hotel construction works including structural and finishing.
Villa at MBR including infra works like Sewage, storm water, drainage lines.
City walk phase II structural works for the Mall and Hotel 1 project .

Project Coordinator في GBH international contracting llc
  • الإمارات العربية المتحدة - دبي
  • أغسطس 2016 إلى يناير 2019

Worked for 1000 villas coordination, execution quality etc.

snr project engineer Operations And Projects Abu Dhabi Arab Speaking في Sun engineering and contracting llc
  • سبتمبر 2015 إلى أغسطس 2016

completely responsible for all civil works associated to the project ie Retaining wall
, promenade, Atriums & infrastructure works .
• Supervising the Engineers and formens whoever looking after different trades for the sites divided into 05 zones of different structures .
• To prepare wastage analysis for Construction materials . Work as TWC to Check & approve false work & form work, familiar with CUP-LOCK SYSTEM, STAXO Light weight support structure, DOKA FORM
WORK, ECO form Work .
• To work out Quantity take off for material requirement for false& form work, Plan for form works movement .
• To carry out site inspection for false& form work
• Coordinate between third party consultant to carry out false& form work inspection, getting approval
• To prepare form work schedule, Table movement flow chart, allocation of Plants to all involved in the job.

الخلفية التعليمية

ماجستير, Project management
  • في ISMS - Indian school for management studies
  • يونيو 2013

Specialties & Skills

HR Management
QA QC Engineering
Construction Safety
Procurement
Project Management
tome management / site admistration / construction management

اللغات

الانجليزية
متوسط

التدريب و الشهادات

construction Industrial safety (تدريب)
معهد التدريب:
ECITB
المدة:
8 ساعات

الهوايات

  • Ball badminton,cycling,walking,jogging,spiritual listenings