Christiaan أوستويزن, Corperate Manitenance Manager

Christiaan أوستويزن

Corperate Manitenance Manager

Alfanar

البلد
جنوب أفريقيا
التعليم
بكالوريوس, Industrial Engineering
الخبرات
17 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 3 أشهر

Corperate Manitenance Manager في Alfanar
  • المملكة العربية السعودية - الرياض
  • ديسمبر 2010 إلى ديسمبر 2011

Corporate Maintenance Manager, Alfanar Riyadh Saudi Arabia
Our operations are based in Riyadh in two geographical areas supporting 453 family apartments and villa’s from the lower level to about 78 VIP Accommodations in varicose compounds rented by the company. Also responsible for the general Maintenance for the 3 owners of the company. Then another 327 bachelor dwelling are supported that range from labor up to Management Level.
The services to housing include all PM on AC and General maintenance such as Plumbing, carpentry, electrical and HVAC and refurbishment off accommodation to bring it to the company Standard.
Total Project budget that has been Executed is 1.6 Million SAR for Upgrading VIP accommodation and some family and bachelor apartments

Industrial side or Offices I am supporting 43990 SQM of office space including VIP offices and conference centers as well as varicose sales offices within Riyadh.
Equipment would range from BMS Systems and HVAC Package units all the way down to simple plumbing and electrical support.
Also included in the Scope is all Projects requested by the facilities department such as Office renovations and construction off facilities such as training centers
Total project Budget this year to date was 270 000 SAR
My Normal Operating Budget for CR/PM is 3.6 million for manpower and 4.2 mil SAR for Materials for offices and Accommodation excluding Projects.
Key Objectives :
Improve service delivery : achieved a improvement from 75% to 97 % in 11 months for Corrective maintenance
Execution off the Projects due to High Social Demand
Train and re-equip staff to be able to execute critical projects with a short lead time:
Establish and Maintain a HSE system and practices to international norms

3 visible recommendations for this position Manage

Facilities Manager for Base camps in Al Jalamid (ARAR) and Raz Az Zawr (Al Jubail) في WorleyParsons KSA
  • المملكة العربية السعودية
  • يوليو 2008 إلى ديسمبر 2010

Key Areas of responsibility

Management :

• Camp management.
• Logistical planning and warehousing
• Project planning and control
• Costing and estimating and control of projects and operations
• Cost Management
• Water facilities
• Power generation facility
• Waste removal
• Room, room allocations and administration
• Property control/ management
• Projects for camp modifications and expansion
• Up to 50 Indian, Shrilakan, Nephali Egyptian and Bangladeshi
• Construction Projects
• Training of Staff
• Documentation design and systems implementation

Facilities Engineer /Camp Manager في WorleyParsons
  • العراق
  • أبريل 2004 إلى ديسمبر 2007

Worleyparsons was reconstructing the Iraqi Oil fields infrastructure in Iraq with a project budget for the Northern fields in Kirkuk of $600 000 000, central $80 000 000 and the southern Oil fields a approximate $300 000 000.

My key area of responsibility was the Operation and maintenance of the RIO North Base camp for the Parsons E&C(PIJV) team on the RIO project for the USACE ( United States Army Core of Engineers)
My primary function was life support, ie plan, construct, maintain the infrastructure needed to live and work such as office, accommodation, electricity, water, sewage, operational services ( maintenance, cleaning, support of logistics and engineering services) and Food services under severely adverse conditions.
I worked in both Kirkuk and Basra during this project and supported up to 300+ people in Kirkuk and 160+ in Basra



Key Areas of responsibility

Management :

• Camp management.
• Logistical planning and warehousing
• Project planning and control
• Costing and estimating and control of projects and operations
• Water facilities
• Power generation facility
• Waste removal
• Room, room allocations and administration
• Property control/ management
• Projects for camp modifications and expansion
• Up to 140 local national under my direct control - Kirkuk
• Up to 32 Indian Egyptian and Bangladeshi - Basra
• Construction Projects
• Training of Staff
• Documentation design and systems implementation



Engineering :
• Maintaining facilities, electrical, water, sewage and all other infrastructure
• Maintenance and operation of Reveres osmosis Plant
• Operation and maintenance of Generators
• Construction projects, such as new Gym, additional room and offices
• Design systems, water, power, sewage
• Design Offices and warehouses
• Design Generator instillations

Site Engineer في Prime Projects International
  • العراق
  • سبتمبر 2003 إلى مارس 2004

Site Engineer reporting to Project Manager

My key area of responsibility was the Construction of the RIO North Base camp for the Halliburton (KBR ) team on the RIO project for the USACE ( United States Army Core of Engineers) in Kirkuk on the USAF air base.

Management:
Plan, organise and control men, materials and equipment on a daily basis with all activities related to construction


Engineering

• Install RO instillation
• Install lift stations
• Install Cabins and Offices
• Install Power generation facility
• Install Water, electrical and sewage systems
• Install Offices, Cabins and warehouses


Overview
• Construction Of RIO base camp for RIO north project (KBR)
• Construction of 152 living units and 20 000 ft of Office space and 4 800 of warehouse space .
• Construction of 135m^3 RO plant and 2 Lift stations and commissioning
• Supervision of 40 Filipino construction workers and 20 Iraqi construction workers

Quality Engineer/Production Manager في Henkel Surface Technologies
  • جنوب أفريقيا
  • مايو 2002 إلى أغسطس 2003

Quality Engineer/Production Manager reporting to General manager

Henkel Surface Technologies produces specialized chemicals for (mostly) the motor industry
Products would include industrial solvents and cleaners, wax protective coatings under body liners ext
In my tenure I increased total conforming production output by 200%.
My key objective was to optimize production and increase quality levels.

Management:
• Production Monitoring and Control
• Variance control management
• Manage a staff of 22 production Operators and Laboratory personnel
• Maintained ISO 9002 system
• Partner in TS 16949 system design and implementation
• Industrial relations
• Time management of staff and equipment


Engineering :
• Design and implement Plant modifications to increase production output.
• Work Study to Increase production output
• Process Engineering for both Plastic’s and Inorganic chemical processes
• Maintaining ISO9000 and TS16949 Quality systems
• Using Industrial engineering techniques such as activity sampling, work-study and synthesis I optimized processes


Software:
SAP. Windows, Word Excel ext

Shift Manager في SASOL Polymers PVC Compounding
  • جنوب أفريقيا
  • مايو 2000 إلى أبريل 2002

Sasol PVC compounds( Polymers) specialized in the compounding of PVC plastic material for the production of materials to be used in footwear, vehicle components, erasers, electric cable isolation and many more.
My main function was to manage the production floor and ensure efficient and effective production.
I managed to maintain the lowest scrap rate and the highest overall attainment for a 12 month period

Manage

• Management of 40 production operators
• Production output of 30 metric tone of PVC compounds per shift
• Highest overall attainment of 3 shifts for 12 months .
• Lowest Scrap rate of 3 shifts
• Lowest customer complaints / external defect rate
• Plant modifications to improve production process
• Maintaining ISO 9002 Quality System

Engineering

• Process optimization
• Work Study
• Maintenance engineering

Software

• SAP
• Window
• JBS
Reports

• Shift utilization reports
• Attendance reports of staff
• Industrial relation reports

Production Controller في Tupperware SA
  • جنوب أفريقيا
  • أبريل 1998 إلى أبريل 2000

Production Controller/ Planner reporting to Logistics /Business manager
My main objective was the logistical planning of materials, moulds, labor and machine time to ensure that product release schedule was met
This included the mould shuttling planning, production line plan, materials planning and packaging planning

Planning Activities/Logistics

• Planning of daily production schedules
• Planning of medium term production schedules
• Aggregated planning
• Materials requirements planning


Engineering

• Costing and estimating of new products and packing materials
• Design of packing materials
• Work study for new products assembly and optimization of assembly line.
• Development of new processes to reduce production costs on assembly line
• Work study to improve workflow and reduce production cost

Management

• Management of packing materials
• Management of finished goods stock

Reports generated
Production plans
Mould plans
Materials plans
Attainment reports

Logistics Coordinator في Johnson Mattehey
  • جنوب أفريقيا
  • أبريل 1994 إلى مارس 1998

Logistics Coordinator Reporting to Operations Manager
Johnson Matthey is a Auto catalyst producer for customers such as Ford, VW, Audi, BMW and Fiat.
My key objective was to plan production, materials and line time to meet the demands of the various customers with service level of 97.5% while keeping low inventories of stock and maintaining a Just in Time system.
Stock Control was a major part of my responsibilities since we had lost of extremely high value materials, such as Platinum, Rhodium and palladium
Since most of these materials were in a soluble form a deep understanding of Chemistry worked to my advantage

Planning /Logistics

• Planning of daily production schedules
• Planning of medium term production schedules
• Aggregated planning
• Materials requirements planning
• PGM metal planning

Managing
• Managing of raw materials and finished goods warehouses
• Managing warehouses
• Management of PGM material stocks
• Maintaining ISO9002 and DVA Quality Systems
• Managing of Stock takes

Reports generated
• Line Plans
• Capacity forecast
• Attainment reports/capacity utilization
• Materials plans and forecast
• PGM stock take reports
• Aggregated planning reports
• What If’s?

الخلفية التعليمية

بكالوريوس, Industrial Engineering
  • في TWR
  • يونيو 1996

• Diploma in Industrial Engineering ( majored Chemical industries) • Plastics technology certificate from Plastics federation of South Africa Part time studies: Started Bachelors degree in Industrial engineering 2002-2003 before working in

Specialties & Skills

Industrial Engineering
Production
Attainment
Materials
Facilities Manager
Logistics Coordinator
Production Manager
Production Controller

اللغات

الانجليزية
متمرّس
الأفركانية
متمرّس
الكردية
مبتدئ