Assistant Engineer
Vectis
Total years of experience :3 years, 4 Months
Production and installation of stainless steel piping for a 60.000lt tank connection with the existing networks at Mai Dubai, a water treatment factory in Dubai.
User of surveying equipment - Theodolite Total Station, Geodimeter and GPS, creating Topographical maps and drawings using AutoCAD, Levelling, Mapping, Staking out
Mapping, using a digital theodolite and a GPS rover, of a 40 kilimetres length road in Rhodes island and cadastral survey of a 50m zone on each side of the road.
Every 1km we built cement pedestals 30cm height to use them as steady points and when the mapping came to an end we used GPS for triangulation with the current steady points of the island to access them in the local geodetic system
Participation in field measurements for planning permission and surveying contracts, creating
Topographical maps, Resolving topographic networks
School of Rural and Surveying Engineering ▪ Focus on the Department of Geodesy and Topography ▪ Bachelor’s thesis entitled "Three-dimensional Mapping the 3rd and 14th Primary School in Veria"
Halastra Lyceum. ThessaloniKI ▪ grade: 17.6 VERY GOOD