Consultant Engineer
National Center for Housing and construction
Total years of experience :16 years, 11 Months
Overseeing the implementation of the social housing project Tenth of Ramadan City
• Oct. 2011- Nov 2014 : Project manager - Structural Department Head
- Alshati Consultant Office ( Gazan, Ksa )
¥ Project manager of the study and supervision of the main municipality of Jazan and its branch municipalities.
¥ Design and site inspector Engineer Alshati Consulting Office and Structural Department Head & Gazan Municipality:
¥ Review projects Studies received from municipalities of the municipality of Jazan and studies projects asphalt, pavements and lighting and spatial planning and Road and set buildings and ward off the dangers of Seoul and rain water drainage and the establishment of parks and green spaces and studies and supervision of projects.
¥ Assess structural problems in various projects for the Municipality of Jazan and the other municipalities.
¥ Work within the evaluation committee ramshackle buildings in the city of Jizan.
¥ Samta Muncipality Construction Supervision.
¥ Structural Design For The Abu Arish Municipality Building.
¥ Structural Design For The Entrance Gate Of Ardah City.
¥ Structural Design For Many Residential Buildings And Mosques.
¥ Structural Design For The Entrance Gate Of Gazan City.
¥ Abu Arish private school Construction Supervision.
¥ Preparing B.O.Q for the building of the Municipality Abu Arish, Viva City Hall, the bridge's upper Abu Arish and Samta.
¥ Structural Design of Gazan hotel and Samta health center.
• Oct. 2008 - Sept.2011 : Fahd Jutily Al Anzi for architectural contractions (Arar, KSA).
¥ Oeqiela Entrance Improvement (Interlock for passageway through 3.0 Km with total project value 3, 332, 000 SR (360 days). \[Design and Construction\]
¥ Rainfall drainage, Keeping flood danger off and Vallies watercourse
Rectification through 2.00 kilometers with total project value 1, 680, 250 SR
(360 days). \[Design and Construction with all Survey works\]
¥ Oeqiela main and it's villages Streets illumination with Sidewalks (360 Steel column with PC Foundation + PC man holes + All Electrical and civil work supervision + Planning project) through 12.0 kilometers with total project value 7, 148, 975 SR (720 days). \[Design and Construction\]
• March 2008 - Sept 2008: Consultant Engineer in ECC (Engineering Consulting Center) Governorate Tower, Zagazig, Egypt.
¥ 5 Tall buildings (design and construction supervision) .
¥ Design 3Tall Buildings in Dubai through the branch of the office in Dubai.
¥ Manshet Sahbra hospital maintenance and finishing supervision with total
Project value 628.345 LE.
¥ Design more than 12 house, 3 villas and a mosque architectural and structural in Diarb Negm City and Construction supervision.
• July 2007 - March 2008: A Designer and Construction Engineer in Concrete Sharm Co, Sharm El Shiekh, Egypt.
¥ Water Desalinization Station in Arabsat tourist village in Gharqana with total
Project value 3.5 millions LE including RC + steel + private Concrete + chemical materials + sanitary works (360 days).
* Consultant Office: Mittito. * Contraction Company: Concrete Sharm.
¥ J.d' Costa village Construction and Finishing in Noor Area with total value 15.0
Millions LE including 9 villas RC skeleton, super finishing, 3 swimming pools, tennis Court, around wall and landscape finishing (720 days).
¥ 3 Villas in Arab Sat Tourist village in Gharqana with total value 2.5 millions LE
Including RC skeleton and super finishing (360 days).,
• Oct. 2008 - Sept.2011: Fahd Jutily Al Anzi for architectural contractions (Arar, KSA)
¥ Oeqiela Entrance Improvement (Interlock for passageway through 3.0 Km with total project value 3, 332, 000 SR (360 days) . \[Design and Construction\]
¥ Rainfall drainage, Keeping flood danger off and Vallies watercourse
Rectification through 2.00 kilometers with total project value 1, 680, 250 SR
(360 days) . \[Design and Construction with all Survey works\]
¥ Oeqiela main and it's villages Streets illumination with Sidewalks (360 Steel column with PC Foundation + PC man holes + All Electrical and civil work supervision + Planning project) through 12.0 kilometers with total project value 7, 148, 975 SR (720 days) . \[Design and Construction\]
• July 2007 - March 2008: A Designer and Construction Engineer in Concrete Sharm Co, Sharm El Shiekh, Egypt.
¥ Water Desalinization Station in Arabsat tourist village in Gharqana with total
Project value 3.5 millions LE including RC + steel + private Concrete + chemical materials + sanitary works (360 days)
* Consultant Office: Mittito. * Contraction Company: Concrete Sharm.
¥ J.d' Costa village Construction and Finishing in Noor Area with total value 15.0
Millions LE including 9 villas RC skeleton, super finishing, 3 swimming pools, tennis Court, around wall and landscape finishing (720 days)
¥ 3 Villas in Arab Sat Tourist village in Gharqana with total value 2.5 millions LE
Including RC skeleton and super finishing (360 days),
B.Sc. Of Civil Engineering, Zagazig University Graduation Date: 2007.
B.Sc. Project: Design of Reinforced Concrete (Tall Building, Mosque and Water Tank) . Project Degree: Excellent. 2002: Al Sadat Military Secondary School.
1999: Kramout Sahbra Prep School.
1996: Karmout Sahbra Primary School.