Project Coordinator/Piping Design Engineer
Chiyoda Corporation
Total years of experience :10 years, 0 Months
• Reviewed 3D models from Piping and Instrumentation Diagram/ Drawing (P&ID) requirements, safety and integrity requirements, operation & maintenance requirements, good engineering practices and client comments / requirements
• Supervised a team of engineers and designers for execution of piping work scopes, reviewed all the piping studies and work done by task force members
• Prepared and developed hydraulic pipe model for vendor equipment packages
• Prepared project documents like deliverables list, design verification plan, design basis
• Resolved 3D model related issues such as inter-discipline clash, maintenance clash
• Resolved and closed project issues and comments with the client
• Created piping route study for FEED
• Produced piping plan drawing, piping isometric drawing and pipe support drawing
• Developed 3D model of piping, equipment and preliminary structure
• Executed work as per applicable standards and procedures, and within man-hour budgets/schedule targets
• Conducted site survey to gather information to be used for piping design
• Attended project meetings and site walk downs to discuss ongoing issues
• Assigned/seconded on company’s affiliated EPC companies
• Prepared, reviewed & verified plot plan & equipment layout with innovative techniques and work practices for cost effective design, statutory approval drawings / layouts
• Created and developed 3D model of piping, equipment and structural models
• Produced basic piping drawings including plot plans, piping plans, isometrics and sketches
• Reviewed vendor drawing and data sheets within the discipline and from other disciplines for compliance with project requirements, and actively searched for discrepancy resolution
• Involved in detail engineering and design of company’s domestic and overseas projects
• Created and developed 3D model as per project requirements and standards
• Incorporated stress isometric analysis comment to piping model
• Produced and issued isometric drawings for construction
• Attended piping discipline engineering meetings
• Maintained and developed engineering standards; produced engineering and design deliverables including basic Piping & Instrumentation Diagram (P&IDs)
• Modified existing piping discipline drawings, based on information gained on-site or information provided by pipe stress and flow analysis, simulation, pipe pressure drop calculation, and fluid velocities
• Conferred and worked closely with other engineers during project execution
• Assigned as a Piping Field Engineer on Saudi Aramco Total Refinery Project (SATORP)
• Prepared, walked down, released and provide technical oversight for pressure test packages
• Managed the completion assigned area in accordance with schedule