Project In-Charge
D.M. Consunji, Inc.
Total years of experience :24 years, 9 Months
Project: North-South Commuter Railway
Clients: Department of Transportation (DOTr) / Philippine National Railways (PNR)
- Help prepare the Project Operational Plan which is the main planning, monitoring and control tool of the Operations.
- In charge of the implementation of the assigned permanent scope of works of the Project Operational Plan according to the contract documents especially contract, plans and specifications
- Responsible for the controls associated to the identified risks of the assigned scope of works of the project
- Direct and manage the assigned sub-contractor’s works safety, quality and schedule.
- Coordinate with the Customer’s representative on matters related to the assigned scope of works of the project.
- Prepare and submit project accomplishment reports.
- Prepare the supporting documents for billing based on the approved payment schedules.
- Help in the implementation Project Quality Plan, Inspection and Test Plan, and Project Construction Safety and Health Program.
- Direct workers and evaluate actual manpower loading against plan.
- Recommend addition or reduction of manpower.
Project: Khalifa Port Expansion (Capping Beams and Access Road)
- Managed the project in a safe manner and meets the requirements of the project documentation
- Ensured all measuring and test equipment on site is properly calibrated
- Reviewed and ensures that all shop drawings and material submittals are presented to the appropriate bodies with adequate supporting information
- Provided updated shop drawings to site foremen/supervisors
- Prepared the ITP
- Ensured that operatives comply with the relevant method statement, Tootbox Tasks and general site briefings
- Ensured that sub-contractors and suppliers achieve the on-site required standards.
- Monitored the close-out activities of the project and maintain a smooth hand-over
- Carried out phased inspection
- Ensured that completed works are offered for inspection/approval to external companies within specific dates/programs
- Prepared and monitors the project snagging list
- Prepared project HSE documents as per project HSE plan.
Project: Temburong Bridge (Superstructure of Marine Viaducts)
- Overseen and directed the superstructure site supervision staff of engineering work.
- Liased with client representatives for any query on site regarding technical matters such as work quality, works methods, standards etc.
- Prepared and submitted daily report and progress to construction engineer in daily basis.
- Monitored in-coming materials on site.
- Advised sub-contractor in the proper construction methods as per standard and quality.
- Reviewed sub-contractor submitted shop drawing prior to implementation.
- Responsible for working within the provisions and guidelines of the Quality Assurance system relevant to marine works project
- Responsible for personal safety safe working practice. Understand and follow OH&S procedures.
Project: Manila Bay Resort (Pile Driving Works)
- Managed and oversee the day-to-day construction activities of the project
- Ensured all construction is being performed to quality standards in compliance with design specifications, drawings, budget and schedule, interpreted and explained plans and contract terms to involved staff and contractors
- Coordinated and optimized the arrangement of daily activities tasked to the construction crews to minimize lost productivity time
- Submitted requests for extension of time, claims for additional payment, and contractual disputes to project management team.
- Reviewed quotes, material requests, procured items, deliveries and on-site production to validate accurate fulfilment and quality control.
- Certified all invoices submitted by suppliers and recommend for payment by Owners
- Performed inspections at completion of each construction phase, and signed-off on quality of workmanship along with project management.
- Determined and recommended labor force, materials, and equipment requirements
- Built and updated project schedules
- Responsible for ensuring completion of activities according to schedule.
- Expedited and coordinated any delayed or potentially delayed activities.
- Enforced and promoted site safety and project procedures and proper use of equipment
- Conducted meetings with field staff to remain informed of project work accomplishment and developing issues.
Project: King Abdullah Port
- Reviewed all drawings prior to site implementation.
- Coordinated the work to the supervision consultants prior to implementation.
- Monitored and supervised works as per agreed method statement.
- Provided comprehensive daily report to Construction Manager and Project Manager.
- Monitored the availability of site materials.
- Liaised with and direct the work to sub-contractors
- Prepared materials take-off needed to site as per work schedule.
- Prepared bar bending schedule for the approval of the construction manager prior to the implementation on site.
- Assigned sufficient and capable workers to carry out the works as per schedule.
- Provided project weekly accomplishment to the Construction Manager.
- Supervised the site filling works, road works and site boundary fence.
- Supervised the setting-out of survey with coordination of the site surveyor.
- Supervised of installation of rubble mound in blinding layer of precast quay blocks.
- Prepared method statement for the concreting works and concrete repair works.
Project: NAKILAT Ship Repair Yard- Ras Laffan, Qatar
Client : NAKILAT / Qatar Petroleum
- Involved as Civil Works Engineer on off-shore structure such as caisson structure, piers, dry dock structure, quay wall structure and on-shore dry dock utility structure such as fire pump house, compressor house, substations, pavement, underground utilities, potable water tanks foundation, underground contaminated water treatment plant and others minor utilities.
- Supervised and reviewed works on site in respect of the current/ latest approved construction drawings, method statement (slip forming, bar bending and cutting, concreting, transportation of caisson structure, concrete repair works) in connection to the project specification.
- Attended inspection on the submitted RFI both on-shore and off-shore structure on daily basis.
- Attended Bathymetric survey of sea bed.
- Inspected the quality of all materials and workmanship (including samples) provided by the Contractor, checked compliance with all specified technical requirements.
- Inspected marine civil works activities in relations to the approved Method Statement.
- Assisted the Asst. Resident Engineer to review and comment on Contractor’s shop drawings.
- Assisted the Asst. Resident Engineer to review and comment on Contractor’s submittals such as Technical, Materials, Test Results and Calculations.
- Assisted the Asst. Resident Engineer on the monthly accomplishment report.
- Monitored concreting works especially on the slip forming activities of the caisson structure.
- Reported any deviations from approved Site Safety Procedures via the Asst. Resident Engineer.
- Maintained a comprehensive daily report on Contractor’s major activities and important observations on site.
- Carried-on work instructions of Asst. Resident Engineer from time to time.
Project: Lusail Development- Marine Supervision Management
Client : Qatari Diar
- Involved as Concrete Inspector on Retaining Wall concrete blocks.
- Supervised and reviewed works on site in respect of the current/ latest approved construction drawings, method statement for casting in connection to the project specification.
- Ensured that all works are being executed in accordance with the Contractor’s approved Quality Assurance & Quality Control Procedures and it being strictly implemented.
- Monitored and inspected concrete heat of hydration and full scale trial mixed design of concrete.
- Inspected the installation of Pre-Fabricated Quay Wall Blocks, Revetment Rocks/Blocks, Scour Protection Rocks/Blocks
- Monitored and inspected the temporary fence installation at perimeter of the project site.
- Monitored and inspected the construction of jetty.
- Witnessed and evaluated material testing in accordance with agreed schedule and specifications.
- Assisted the Senior Engineer to review and comment on Contractor’s shop drawings.
- Assisted the Senior Engineer to review and comment on Contractor’s submittals such as Technical, Materials, Test Results and Calculations.
- Assisted the Senior Engineer on the monthly accomplishment report.
- Reported any deviations from approved Site Safety Procedures via the Senior Engineer.
- Maintained a comprehensive daily report on all Contractor’s major activities and all important observations on site.
- Carried-on work instructions of Senior Engineer from time to time.
Projects: Construction of School Buildings, Roads, Seawalls & Rock Revetments
Client : Provincial Government of Romblon, Philippines
- Supervised concreting works, lay-out of column, beams & slabs
- Supervised cutting and installation of structural reinforcement bars, testing & sampling of concrete.
- Supervised construction of concrete pavement from filling and compaction of sub-base, base course up to concreting of pavements.
- Supervised test on materials for the sub-base, base course and ingredients for the concrete mix.
- Prepared progress reports, coordinated with client’s representative in resolving problems and issue for project implementation
- Coordinated with Local Government representatives and property owners affected by projects.
- Managed the whole workforce, preparation of tender documents
- Monitored all schedules, program of works and material quantity control
- Prepared quantity take-off preparation, estimated bill of materials
- Attended pre-bid conference construction meetings
- Involved in ground modification by supervising and assigning the right equipment for excavation, hauling, backfilling, compaction and testing.
- Supervised and carried out in the construction of rock bunds, marine structures, piling works, excavation works, rock placing by using crane.
- Carried-out survey on staking lines, layout of the works to ensure satisfactory construction of works.
Projects: Construction of School Buildings for the Third Elementary Education Program
Client: Department of Education (DepEd), Romblon Philippines
- Prepared bid tender and detailed engineering works based on the approved program of works and funding.
- Prepared cost analysis, bill of quantities, elemental estimating, progress payment certification.
- Took charge in Contract administration and progress payment certification and defect management/ hand over.
- Prepared architectural, structural, plumbing and electrical drawings for approval of Lead Senior Engineer and Project Manager of the Client.
- Prepared detailed manpower and material quantity take-off based on the approved drawings.
- Evaluated Contractor’s claims and work accomplishment on bi-monthly and weekly basis depending on when the contractor submit claims.
- Prepared program of works, on a school-by-school basis, based on the priorities set by the results of school mapping exercise and fulfilment of requirements such as proof of site ownership.
- Conducted pre-bid conferences, bid opening, bids evaluation, post-qualification and recommendation for award.
- Evaluated bid results of each contractor who submitted a tender bid for the project.
- Taken charge in the processing of contracts and issuance of notice of award and notice to proceed
- Conducted site inspection on a daily basis.
- Prepared status reports on weekly basis.
Projects: Construction of School Buildings for the Third Elementary Education Program
Client: Department of Education (DepEd), Romblon Philippines
- Conducted site appraisal of the location of the project.
- Prepared bid tender and detailed engineering works for approval of the Lead Senior Engineer and Client Project Manager.
- Conducted pre-bid conference & inspect proposed project sites with the contractor.
- Evaluated bid results & review necessary documents
- Took charge of processing of contract and issuance of notice of award, notice to commence work & reviewed attachment.
- Attended pre-construction meeting with stakeholders.
- Conducted site inspection & monitored on-going projects.
- Prepared monitoring & inspection reports.
- Facilitated preparation of completion & turnover documents.
- Prepared plans & work targets.
- Prepared monthly status report.
Projects:
-Manila Electric Company (MERALCO) underground power supply
- Tutuban Mall skybridge, main drainage, asphalt laying of parking area
-Philippine National Railways Executive Building
- Conducted monitoring and inspection of pile driving, excavation, concreting, structural steel fabrication and testing of the construction materials.
- Scheduled the production rate with the available machines in the site
- Checked the soil report and followed up the drilling to make sure of the efficiency and accuracy of the foundation (pile, sheet pile, diaphragm, h-beam, etc.
- Reviewed technical specifications, construction drawings and as-built drawings
- Monitored and checked progress schedule, budget and quality of works.
- Prepared and implemented construction program
- Prepared and monitored weekly work accomplishment.
- Checked and evaluated Contractor’s progress billing.
- Verified and maintained critical project documentation such as certificates of insurance, bonds, applications for payment, test reports, warranties, change order documentation and other contract instruments
- Reviewed and recommended acceptance of change proposals and rendered impartial interpretations to the contract documents when claims arise between the parties to the contract
- Attended coordination meetings with the project design team and authorities having jurisdiction to identify, review and resolve possible code interpretation conflicts.
- Prepared monthly progress report.