Quantity Surveyor
SHIBH AL JAZIRA CONTRATING CO.
مجموع سنوات الخبرة :13 years, 3 أشهر
Structure Department (Bar Bending, Detailing, Setting-Out)
-Bridges
-RCBC
-Slope Protection
-Retaining Wall
-Earthwall Panel
-Residential
Quantity Take-Off / Estimate for Materials (Bar Cut)
Monitoring Delivered Materials and Proper Consumption
Assist Project Manager and Project Engineer
Prepare Power point presentation during meeting
Prepare Auto Cad Drawing
As-stake Plan, Construction Drawing, Working Drawing, Shop Drawing, As-Built Drawing, lay-out of survey data, and plot lot bearing.
Coordination Meeting (Inter Office, Maynilad, DPWH, Etc)
Quantify Daily Accomplishment Report for Inter Office
Quantify DAR for Owner (Maynilad)
Prepare Billing with attach documents required
Prepare Variation Order w/ back-up computation
Monitoring of Billable Accomplishment
Prepare Time Extension and Revise S-Curve w/ Bar Chart
Prepare weekly Cost Data Report (Accomplishments VS Expenses)
Prepare Construction Methodology
Prepare Schedule of Works
Issue memorandum at campsite and jobsite.
Prepare transmittal letter for documentation.
Conduct weekly cash count of money with accounting clerk
Document Controller (for ISO requirement)
Prepare Close -out Documents and Final Contract Amount
Justification for Turn Over of Pipes and Fittings
Preparation of Asset Registry and Billing Statement