Work Experience

Total years of experience :16 years, 0 Months

Leader mechanical at Sertecpet
  • Ecuador
  • January 1999 to December 2014

15 years of experience Design and construction of machinery, Maintenance management, Construction and quality control in oil industry and potable water plants, Design in oil industry.
10 years of experience in the oil industry.

Management on maintenance of machinery, management on construction prefabricated piping, formulation, design, implementation and monitoring of hydrocarbon industrial projects for new plants and revamping of central process facilities, pipelines and pumping systems and Auxiliary Services in Ecuador.

DESIGN
Acueduct la esperanza
Interconnection pipeline Ecuador Colombia.
Relief stations systems.
Evaluation system fire station
Increase in cooling of the unit.
Separators instrumentation
Multiphasic meters
Follow-up audit, ISO,
Heavy oil Facilities
Revamping DORINE Battery increase 20000 bbls to the management of water injection
New Quito airport

Design and implementation of the system ISO 9000 certification project

CONSTRUCTION
Drinking water plant Machala
Machala drinking water plant cubic 750metros per hour /, receipt of equipment, piping, instrumentation, tools, review of plans, issuance of orders change to the design due to interference between civil and mechanical levels, redesign of interconnections, relocation of equipment, personnel and control progress of work, journal and book of work, for additional quantification, management of the constructive timetable, interconnection to water wellsinstallation of filters for standard, installation of instruments of measurement, supporting the boot and bombproof, delivery of mechanical equipment in operation.
Sarayacu Pump Station
Prefabricated pipe for the installation of engines Wartsila, system of pumping, drains according to P & ID, construction and delivery of 4000-inch pipe in a month of work, 10% RT, 0 accidents, 0.3% Weld repair, 23 PQR, 60 WPQ, organization of work, qualification of welding, welders qualification procedures, team management was MTR's, control of discharges of Wineryreception of containers of material, liquidation of materials, traceability of materials in construction, preparation of list of spool for delivery, monitoring loading spool and lashing of cargo transport, development of dispatch guides and consecutive levels indicating the way mount spooling.
Pipeline maintenance
Yuralpa Central process Facilities block 21
Project Yuralpa. Prefabricated pipe 19000 inch in 6 months for the CPF, 10% RT, 0 accidents, 0.4% Weld repairs, 17 PQR, WPQ 246. Prefabricated pipe 7000 inch in 3 months for the
Power Generation Wartsila, 10% RT, 0 accidents, 0.4% weld repairs, 21 PQR, WPQ 140.Construction of pipe rack for CPF and generating approximately 20 tons.
Construction of all the Shelters of the project Yuralpa 30 tons in a month and a half.
Construction of shelter for engines of Power Generation according to level, and reinforcement of 24 major columns within 24 hours, construction of the first floor of Tower of support of Exhaust of Wartsila engines and pre-Assembly in workshop with alignment in the diagonal according to plans of holes in the base - columns - levels - perpendicular and parallel with tolerance + - 0 mm handling de70 people
Flowline Villano to - villain (b)
Flowline of Agip villain, villain B 3.5 km. Control of welding of 3.5 Km, 100% RT, 0 accidents, 0.3% weld repair, 1 PQR, WPQ 12. Control of the coating of thermal insulation of the flowline, liberation of the line with DNH, management of the report on progress of work.
Injection of 5000 psi water line
Expansion of Agip CPF Puyo, mounting of pumps, re 2500 water injection line # and hydrostatic testing
Installation of an Electrostatic Heater Treater
Enlargement of Agip CPF Puyo, Control of welding, 10% RT, 0 accidents, 0.7% weld repair, 1 PQR, WPQ 6, assembly lines to exchangers and heater treater

Education

High school or equivalent, Mechanical Engineer
  • at ESPE
  • December 1999