Director at TRANSIENT ELECTRICALS PVT.LTD.
  • India - Kolkata
  • My current job since September 2014

1. Transient Electrical Private Limited, KOLKATA  Director 20th. May 2014 - till date.
Entire EPC turnkey solution for industrial projects.


 Project Under execution.
33/11KV substation construction along with double circuit 33KV transmission line including all civil works at MIDNAPORE.
VAL wagon tippler E&I work at SESA Sterlite Lanjigarh.
Design, engineering and estimation of Chandrapur Dhariwal projects, 400KV transmission OPGW link between Bhdrawati and Parli grid sub-stations.
E &I Consultancy for M/S CDE ASEA C&D plant.
33/11 KV, 3X6.5 MVA Substation Augmentation at Malda English Bazar Main s/s for West Bengal State Electricity Board.
Industrial E&I Supply & Erection at Ultratech Cement Limited.
Designing and manufacturing of MCC PDB and Augmentation with ACB for M/S Indiana Conveyor.
Project Marketing.
CIP and Budgeting.

DGM at POWER MAX INDIA PVT. LTD.
  • India - Kolkata
  • February 2010 to June 2014

2. POWER MAX (INDIA) PRIVATE LIMITED Kolkata (India)  Sr Dy.General Manager-E&I  01st. Feb 2010 - till 2014 May 19th. JUNE

 Project Under execution.
 IOCL Panipath refinery E&I job during 2010
 GUA Iron Ore mines, apron feeder with drives for Iron ore handling for SAIL during 2010-2012
 Revamping of SAIL BOKARO PLANT for capacity enhancement of coke oven battery no 4 during 2012-2013
 Hidalco Sambalpur plant E&I job for Blue fox canning plant.
 Vedanta aluminium SESA STERLITE lanjigarh plant E&I, C&A for wagon tippler and conveying system for bauxite handling.
 E&I total engineering and estimation for SHREI Dishergarh Power supply 12 MW captive plant.
 Design and estimation for Total plant lighting for Blue fox plant at Sambalpur for Hindalco to the tune of 14, 00, 00, 000.00 INR
 Meghahatuburu Iron Ore mines Capacity augmentation for SAIL and erection is under progress.

3 SPECIALIST Project MANAGEMENT PROFESSIONAL AS CONSULTANT FROM BVQI BAHRAIN for SCHNEIDER ELECTRIC at BVQI
  • Bahrain - Manama
  • June 2009 to September 2009

From 15th. JUNE 2009 - 14th.SEPTEMBER 2009


• Participated in meetings, monthly progress verification, Technical Queries preparation for Contract clause variation/ deviation, Contract Evaluation, Maintained register of queries, Billing, overview of Project Budget and Scheduled updates, drawings correction.
• Accountable for negotiation with Vendors, Subcontractor’s work evaluation, approval of Payments to Vendors, followed up of Payments with Client and interfaced with Clients & subcontractors.
• Responsible for all Electrical, Instrumentation, Telecommunication and Cathodic Protection related construction, pre-commissioning & commissioning activities viz. cable laying, station/plant earthing system (E&I), lightening protection, Overhead line, Transformers, LT Switchboard, UPS, Battery Bank, Lighting for safe and hazardous area, Cold & Hot loop testing of Instrumentation.
• BMS AND EMS

Manger Projects at CEGELEC QATAR
  • Qatar - Doha
  • July 2005 to May 2009

3. Country Manager Projects for Qatar Cegelec France(Bahrain and Qatar Operation)
-E&I from 01st. July 2005 - 6th.May 2009
 Project Handled
 E&I ERECTION FOR1025 MW COMBINED CYCLE POWER PLANT, HRSG WITH SIEMENS AND ANSALDO CALDAIE SPA (7th. MARCH 2006 TO 30th. JUNE 2007).
 E&I ERECTION FOR2000MW COMBINED CYCLE POWER PLANT, HRSG WITH IBERINCO SPAIN(JULY 2007-MAY 2009)
 E&IEPC TURNKEY FOR VOLATILE ORGANIC CHEMICAL BURNING BATH FOR QATAR GAS(NOV 2006-FEB2008)
 AIR PRODUCT PLANT FOR TECHNIP( JUNE2008-MAY2009)
 E&I, COMMUNICATION, LIGHTING IN CAMP, EPC FACILITY PROVISIONS FOR GAMUDA( AUG 2007-DEC2007)

Project Engineer at 4 ALKOMED ENGINEERING BAHRAIN –PROJECT ENGINEER E&I  6th. JUNE 2004- 10th.MARCH 2005
  • Bahrain - Manama
  • June 2004 to March 2005

 Project Handled
 6 NOS. VOLTAGE REGULATING AND RECTIFIER TRANSFORMER SYSTEM ERECTION FOR POT LINE 5 EXPANSION PROJECT AT ALUMINIUM BAHRAIN OF 6X72 KA DC CAPACITIES. INCOMING WAS 220KV AC AND THE OUTPUT OF THE SYSTEM WAS 450KA AT 1550V DC

• Responsible for Coordination with engineering department OF BECHTEL AND FUJI ELECTRICAL for availability of approved construction drawings/other necessary deliverables as per the project document list. Review of engineering drawings/Data sheets/MR/vendor drawings for fulfilling the project required specifications. Review of MTO to ensure requirement as per the AFC drawings.
• Responsible for Project Engineering, coordination and expediting also monitored and managed Engineering efforts, followed up MOM, Design review, Master Document list & execution as per approved construction drawings.
• Participated in meetings, monthly progress verification, Technical Queries preparation for Contract clause variation/ deviation, Contract Evaluation, Maintained register of queries, Billing, overview of Project Budget and Scheduled updates.
• Cold & Hot loop testing of Instrumentation, testing/calibration OF ALL TRANSFORMERS RELAYS AND SAFETY DEVICES,
• Organizing site testing, metrology verification/calibration of field instruments/F&G instruments/metering instruments from approved certified agency, pre-commissioning and commissioning activities of Electrical equipments including transformer, protection relays and earthing resistance testing from approved certified laboratory.

Manager Projects at 5 AS INDUSTRIES -MANAGER ELECTRICAL  MAY 2001 – JUNE 2004
  • India - Kolkata
  • May 2001 to June 2004

 Project Handled
 ONGC RIG MAINTENANCE
 CHITTARANJAN LOCOMOTIVE WHEEL BEARING WASHING PLANT

• Responsible for TENDERING 7 ESTIMATION, Project coordination and expediting also monitored and managed Engineering efforts, Design review, and preparation of submittals, Master Document list & execution as per approved construction drawings.
• Involved in Electrical & Instrument equipment erection- alignment -testing-equipment layout-Isometrics-P&IDs, review of Quality Assurance, HSE planning, Production Quantity Surveying and verification.
• Participated in meetings, monthly progress verification, Technical Queries preparation for Contract clause variation/ deviation, Contract Evaluation, Maintained register of queries, Billing, overview of Project Budget and Scheduled updates.
• Handled Erection of transformers, installation of battery bank of 48V, Battery Charger, LV Panels like DCDB panels, ACDB Panels, RTU panels, Telecommunication Panels, Control Panels, Marshalling Panels, Cable tray, Earthing, Cable Termination.
• Monitored the Erection of Tower (steel structure), installation of instruments and fire & gas equipment in field, loop checking for instruments from field to control room through type of source, inspection, wiring, testing and commissioning & maintenance activity of Electrical & Instrumentation Equipments.

Specialist Steel rolling mill planner at Saudi Iron & Steel Company
  • Saudi Arabia - Jubail
  • April 1999 to April 2001

Specialist job planner for all three hot mills, rod mill, bar mill and section and bar mill in SAP.

Project Manager at Hindustan Copper Ltd/SABIC/ALKOMED/CEGELEC/BUREAU VERITAS
  • India - Kolkata
  • October 1989 to April 1999

Electrical machine maintenance for different shops like smelter, copper refinery, Gas Turbine power generation plant.