مجموع سنوات الخبرة: 27 سنوات, 3 أشهر
يونيو 2013
إلى أبريل 2016
Senior Electrical Engineer
في Fairmont Hotel
البلد :
الإمارات العربية المتحدة
يوليو 2008
إلى مايو 2013
Project Manager
في MEP
البلد :
الإمارات العربية المتحدة
Projects :
- B+G+P+21floors Hotel &Hotel Apartment - Gaya Grand hotel - DUBAI
- G+1F Villas (qty=7) - DUBAI
- B+G+P+21floors Hotel &Hotel Apartment - Gaya Grand hotel - DUBAI
- G+1F Villas (qty=7) - DUBAI
أكتوبر 2006
إلى يونيو 2008
Senior Electrical Engineer
البلد :
الإمارات العربية المتحدة
Projects :
- G+6/6 Buildings. B+G+4 Offices Bld 8Towers +7Bld.
- G+28, 32/2Towers
- G+6/6 Buildings. B+G+4 Offices Bld 8Towers +7Bld.
- G+28, 32/2Towers
مايو 2005
إلى نوفمبر 2006
Maintenance Engineer
في AL-Bayat Al-Raqmi Company
Responsibility:
- Installation & operation Flam Cutting Machine / SATO (CNC).
- Maintenance Induction Furnace.
- Maintenance & fixed spectrometer for metal test type ( ARL3460 )
Clients : University of Technology & ALSMOOD public company
- Installation & operation Flam Cutting Machine / SATO (CNC).
- Maintenance Induction Furnace.
- Maintenance & fixed spectrometer for metal test type ( ARL3460 )
Clients : University of Technology & ALSMOOD public company
نوفمبر 1999
إلى أبريل 2005
Managing Director
في Al-Salam Engineering Bureau
Electronic & Electrical Works Contractor - ALMUSSIAB Thermal Power Station / Iraq
- Fully installation & Manufacture main control systems of power station (EHG, TSE, ARU, BMS) including all
electronic cards & field instruments .
- Installation Switch Gear instrument.
- Maintenance main control systems in power station including electronic cards & calibration of systems.
- Installation of Burners Watching System.
3
- Maintenance & Manufactured the electronic cards for (AVR) system.
- Maintenance & fixed UPS system (75kVA) .
- Installation UPS system type GE (40kVA) /QTY.( 2).
Electronic & Electrical Works Contractor - HELLA Power Station / Iraq
- Installation & testing of equipment (SEMAINS ) in substation (400kV / 132kV ) .
- Installation of Switch Gear instrument
- Fully installation & Manufacture main control systems of power station (EHG, TSE, ARU, BMS) including all
electronic cards & field instruments .
- Installation Switch Gear instrument.
- Maintenance main control systems in power station including electronic cards & calibration of systems.
- Installation of Burners Watching System.
3
- Maintenance & Manufactured the electronic cards for (AVR) system.
- Maintenance & fixed UPS system (75kVA) .
- Installation UPS system type GE (40kVA) /QTY.( 2).
Electronic & Electrical Works Contractor - HELLA Power Station / Iraq
- Installation & testing of equipment (SEMAINS ) in substation (400kV / 132kV ) .
- Installation of Switch Gear instrument
أغسطس 1997
إلى سبتمبر 1999
Inspector
في University of Technology
Responsibility:
- Installation Fire Alarm System type GENT (6 loops) .
- Maintenance Fire Alarm System & firefighting type WORMOLD (418 zones) .
- Installation protection system of turbine (TTRC)
Clients : Ministry of Trade, QUDUS Gas Power station, MUSSAIB power station
- Installation Fire Alarm System type GENT (6 loops) .
- Maintenance Fire Alarm System & firefighting type WORMOLD (418 zones) .
- Installation protection system of turbine (TTRC)
Clients : Ministry of Trade, QUDUS Gas Power station, MUSSAIB power station
نوفمبر 1993
إلى أغسطس 1999
Engineer
في BIN FERNAS General Company
Maintenance the Electro Mechanic Instruments (inverter control of bridge crane, pumps, etc ) .
- Maintenance the Control System of Motors (three & single phase also D.C Motors) .
- Maintenance the Elevators. Maintenance Tensile, Impact & Laboratory instruments (Tensile and Impact ) .
- Maintenance the Control System of Motors (three & single phase also D.C Motors) .
- Maintenance the Elevators. Maintenance Tensile, Impact & Laboratory instruments (Tensile and Impact ) .
انشر على فيسبوك
انشر على تويتر
مشاركة عبر البريد الإلكتروني