Dietrich Hein, Consultant

Dietrich Hein

Consultant

Al Rostamani Pegel

البلد
ألمانيا
التعليم
الثانوية العامة أو ما يعادلها, Industrial Engineering
الخبرات
32 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :32 years, 3 أشهر

Consultant في Al Rostamani Pegel
  • الإمارات العربية المتحدة
  • يناير 2004 إلى يناير 2012
Superintendent في Formwork & Concrete
  • كندا
  • يناير 1998 إلى يناير 2003
Superintendent في Formwork & Concrete
  • يناير 1992 إلى يناير 1998
Project في Ministry of interiors projects, Auditorium projects & Industrial projects
  • يناير 1984 إلى يناير 1989
في Formwork & Concrete Exper
  • المملكة العربية السعودية
  • يناير 1976 إلى يناير 1984

Formwork & Concrete Expert

  • إلى

I had been in concrete and formwork industry for more than 41 years specialized in designing of formworks for complicated concrete structures. Supervise and advice on coordination of technical activities of assigned projects in GCC countries. Supervision of the company’s yard and workshop ensuring work quality and safety is observed. Serving the company to the best of my ability using due skill and care on a timely basis. Providing assistance in preparation of project concept designing in regards of finalizing the columns grid and framing plan to achieve optimum utilization of steel and concrete. To make an ease in formwork designing, planning and to achieve economy in overall projects
Providing assistance in project planning at the start of new project
Preparing preliminary budget on the basis of concept design, built up area
Follow preliminary schedule provided by the management to achieve completion of project on time.
Workshop activities - Tools, machines/equipment maintenance prior and after using for forms, ensuring good quality condition at all times
Open and keen eyes to workers who is not observing proper use and maintenance and making them amenable to disciplinary action for not abiding imposed maintenance measures
Strengthen teamwork and maximize the capacity of workers in producing quality products by effective motivation, supervision of supervisors, foremen/charge hand.
Motivation develops enthusiasm about the worker’s drive to accomplish quality work output
Implement a range of monitoring methods which enable proper use and maintenance of tools and equipment.
I have been familiar with all the formwork systems such as but not limited to
ACS Climbing system,
Vario Formworks system,
Table formwork for horizontal and designing of swimming pool formwork
Trio Formwork
Single sided trio formwork
Aluminum Formwork with PDA towers
Doka and GHI system
Sleep form for core walls.

الخلفية التعليمية

الثانوية العامة أو ما يعادلها, Industrial Engineering

courses: Germany. Certified Specialized concrete Strengthening of structures – 1989 - Germany Successfully completed training for ISO 9001

Specialties & Skills

BUDGETING
CAR DRIVER
CONCEPT DEVELOPMENT
CONSULTING
FRAMING
ISO 9000

اللغات

الالمانية
متمرّس