Project: construction new administration building at Korea Electric Power corporation (KEPCO) Calculating of concrete and steel quantities Prepare interm and f inal payments Prepare as- built drawings
Providing treatment of solid and l iquid waste course to students, which includes but is not l imited to: Methods of collecting and conveying wastewater to Treatment plants in addition to design of these plants. Method of collecting solid waste from urban areas. Method of disposing solid waste in landfills Design of solid waste landfills Providing Environmental and Sanitary Engineering courses and environmental and sanitary engineering labs to students, which includes but is not l imited to: Design of sanitary sewer systems Design of pumping stations Stages of wastewater Treatment Water chemistry and method used to treat drinking water Conveying and distributing drinking water Check water quality by using different techniques at lab Providing hydraulic courses to students, which includes but is not l imited to: Design of pipeline and pipe networks Open channels design Hydraulics of pressurized f low
Quantity Surveyor and Technical Engineer Project: Construction of a Rapid Bus between Amman and Zarqa Calculate quantities of asphalt mixtures Calculate of concrete and steel used in culverts construction Draw cross and longitudinal sections using Autocad Prepare monthly and f inal payments
Project: Construction of a Rapid Bus between Amman and Zarqa
Calculating of concrete and steel quantities Prepare interm and f inal payments Prepare as- built drawings
1 Quantity Surveyor and Technical Engineer
2 Preparation of tender documents
3 invoices preparation
4 prepare shop drawings
5 prepare monthly report
1 Quantity Surveyor and Technical Engineer
2 Preparation of tender documents
3 invoices preparation
4 prepare shop drawings
5 prepare monthly report
Project: Dike 18 raising and Risk Control Works - Ch. 5 + 300 - Ch. 1 1 + 750
Solar Pond SP 0 A Construction of Separation Dike
Reviewing quality Control Procedure, Inspection and test Plans, Method Statements to ensure that all activities are applicable and relevant to the project.
Carry out inspection for all civil construction activities to make sure that all works and testing are carried out in accordance with the applicable Codes and Standard.
Site inspection/monitoring of quality activities like excavation, backfilling, compaction, formworks, reinforcing bar installation, concrete placement, pre- cast manufacture and placement, asphalting works, fireproofing, masonry works, finishing works and other civil related works.
Confirm control system for measuring and testing equipment by checking calibration procedures, status of calibration and the calibration records at the time of test/inspection.
Coordinate with other discipline Quality Control Inspector to ensure that civil related activities in other discipline, to be inspected within the construction program, have been inspected and cleared.
Coordinate with Project Development Team for proper implementation of QA/QC system in accordance with ISO Standards and Procedures.
Identify and record any quality problems and initiate, recommend or provide solution through designated channels.
Initiate action to prevent occurrence of non- conformance.
Make the necessary changes in the path of the water line so as not to conflict with the constraints presented on the site, these changes called FCR (Field Change Request).
Quantity surveying for each extract work done in each phase in the project and apply invoice for these works.
Prepare as-built drawings, and shop drawings for all structures in the project.
Participating in the construction of a gas supply station from the Arab gas line to the thermal station in Al-Qatrana .
My master thesis deal with flood flow and base flow of Al-Hasa stream uder the the title ''Modeling of TANNUR Dam effects on Hydraulic and Hydrologic features of AL-HASA base flow and flood flow (1985-2015)”. During my work I was in charge of collecting data of rainfall, runoff, and ground water wells for the study area and analyzing the data using IBM software, also the ARC map (GIS) was used in maps drawing.I recommended in my thesis to increase the number of climatic station in study area to provide agood record of metrological variables and provide an appropriate input data of runoff and ground water readings by ditributing stations in different locations inside the basin.
Bachelor project focused on Al-Mujib dam, one of the biggest dams in Jordan the project title is Rehabilitation of Al-Mujib Dam , the idea of the project was increase the storage capacity of the reservior by raising the RCC section of Dam by 5m.