Project
TAKREER
مجموع سنوات الخبرة :4 years, 4 أشهر
Carbon Black Delayed Coker Project, AL Ruwais
and SAMSUNG ENGINEERING Seoul/Korea (referred as Contractor) entered into 2 contracts executed on
February 2013 for the design, engineering, equipment & material supply, construction, commissioning & associated services for
Badra CPF2 Project. The Badra oil field is one of the largest under development in Iraq and is thought to hold around three billion
barrels of oil. The filed is expected to produce around 170, 000 barrels per day when the $2 billion development plan is complete,
with a huge amount of associated gas generated too.
of world-class residential, commercial, cultural, entertainment
and public facilities, which will ultimately house up to 120, 000 residents. Al Raha is located on the beach side of the main highway
leading into Abu Dhabi from Dubai, the development consists of three precincts.
Project, Al Ruwais, Abu Dhabi, TSJ Ltd. Is a Joint Venture established between
TECNIMONT
Performs a variety of administrative support tasks that are highly confidential and sensitive and coordinates all office
management activities of the Project.
Managing and coordinating all HR & Administrational activities related to Project Staff
Provides assistance to all incoming business trip / OJT.
Hotel & Camp Reservations for the Business Travelers and Dispatch
Accurately maintain and organize the filing of documents on a daily basis.
Daily Monitoring for Business travelers
Handling labor work such as conducting Medical test, U.A.E ID App., Extension Visa App. & Res. Visa App.
Distribute and maintain inventory of HR stock’s availability.
Preparing HR - Admin Weekly Report for branch (Business Trip
- Working within a reception environment providing a telephone answering, admin and reception service as well as organizing the
post, welcoming visitors and providing hospitality towards guests and clients
Excellent telephone manner. Answering all incoming calls / emails and re-routing them to relevant parties.
Meeting and greeting visitors ensuring they are signed in and inducted.
Opening, distributing, collecting and taking the post.
General administration duties, photocopying, filing etc.
Dealing with any enquiries at the reception.
Data entry onto internal systems.
Reporting any problems to the office manager.
Dealing with visitor’s requests and hospitality requirements.
Ensuring that the reception area is tidy and clutter free.
Monitoring stationary stock and reordering when required.
Operating a computer system and switchboard.
Can offer a warm & friendly greeting to visitors.
Smart, presentable appearance.
Ensuring an efficient running and operation of the Reception Desk.
Fully aware of all Health & safety legislation relating to office work.
Dealing with guest billing and cashiering.
RRE # 3 Utilities and Offsite Project, Al Ruwais, Abu Dhabi, - A $2.73BN (USD) contract from Abu
Dhabi Oil Refining Company TAKREER, an affiliate of ADNOC, for the Utilities and Offsite Package 3 of the Ruwais Refinery
Expansion Project (RRE). The Package 3 unit is expected to supply utilities into the complex which is expected to produce another
400, 000 barrels of oil. Samsung Engineering will perform engineering, procurement and construction on a LSTK (Lump Sum Turn-
key) basis for Package 3.
courses: Higher Secondary School -