Electrical Construction Manager
Berksan Engineering and Construction Inc.
Total years of experience :10 years, 4 Months
DUBAI METRO EXPO 2020
Client : RTA
Contractor: EXPOLINK 2020
Alstom @ Acciona @ Gulermak
15 km Double Line Metro Underground & 5 Elevated Metro Stations.
SKILLS @ RESPONSIBILITIES:
-Supervise the electrical site engineers and electrical foremen at site to ensure that the site construction activities (Installation, testing and commissioning of electrical installations, including lighting, small power, earthing, Fire alarm system & gas detection system, ECS system, cable trays, cable lying, Terminations, Telecom, CCTV, Intercom, Access Control Systems, Instrument installation, tubing installation and tubing tests., Loop Checks.) are in accordance to the planing
schedule, and performed as per the quality and HSE requirements.
-Review the electrical design to ensure that is in accordance to the project requirements, local regulations and applicable standards.
-Planning and coordinating the electrical & instrumentation works due to the schedules, calculating the time required to meet deadlines and preserve margins.
-Ordering the project material on time, and following the material receiving dates.
-Preparing and submitting budget estimates and progress and cost tracking reports.
-Preparing the method statements for installation, testing and commissioning of the electrical systems.
-Attending client meetings for the purpose of defining the weekly and monthly project schedule and reviewing design development documents
during project execution.
GARABOGAS FERTILIZER PLANT PROJECT
Client : Mitsubishi Heavy Industry
Contractor: Gap İnşaat A.Ş.
Ammonia Plant: Reforming Area, CO Conversion Area, Methanation Area, NH3 Synthesis Area, NH3 Recorvery Area, SG/NH3-PA/NGCO2 Compression Area, AUX Boiler area.
Urea Plant: HP Pump Area, Synthesis Area, Process Condensate Area, Granulation Area.
Utility & Offsite Area: Raw Water-Waste Water Treatment System, Cooling Water Pump Sytem, Emergency Cooling Tower, MP BFW Pump, Hot
Water System, IA-PA-NG-FG System, System, Gas Turbine System (H-25), Heat Recovery Steam Genarator, Fire Water Pump Station, Bulk Urea Storage House, Flare Area, Non-Plant Buildings, 4 Substation Buldings. Sea Water Intake Area:
LINDE AZOT TOGLIATTI AMMONIA & HYDROGEN PLANT
Client : Linde Azot Togliatti LLC & Rus LLC
Project Management Company: Linde Engineering
Project Description:
Steam Reformer, Interconnection Lines Steamreformer, WHRU Waste Heat recovery Unit, Ammonia Synthesis, Gas cooling, Feed Water, Interconnecting Lines PSA, Compressor Area (Steam Turbine-MCL455 HP Casing-2BCL456 LC Casin), Fire Water Pump Station, Substation, Office and Admin Building, Cooling Tower.
RYBINSK GAS TURBINE MANUFACTURING PLANT (GE 6FA GAS TURBINE)
Client : Ge-Energy - Russia Gas Turbine
Project Management Company: Aecom
Project Description:
Administration Building, Production Building, Painth Shop, Test Bench, Comperessor Station, Fire Pump Station, Substation Building.
EUPHORIA AEGEAN RESORT THERMAL & THALASSO SPA 5 STARTS HOTEL CONSTRUCTION AREA
Client: Prs Otelcilik Truzim ve Taşımacılık A.Ş.
Projct Description:
455 Standard rooms, 11 luxurious villas, Multi-purpose Conference Hall, Main Restaurant, 3 pieces A La Carte
Restaurant, Activity Pool, Relaxation Pool, Aqua Park, Thermal and Thalasso Pools.
Client:
Istanbul Special Provincial Administration Consultancy & TOKI
Project Description:
Çamlıca Elementary School, Piri Reis Elementary School, Yildirim Beyazit Elementary School and Infrastructure and Landscaping Construction Works.
Istanbul Kayabaşı Construction Site, 1090 Houses, 2 Cafeteria, 6 Buffets Infrastructure and Landscaping Construction Works.