Quality Manager
Orascom Construction Limited - Other Locations
مجموع سنوات الخبرة :14 years, 6 أشهر
The Consortium of: - Orascom Construction & Hitachi Energy
Project: ±500 KV HVDC Saudi Egypt Interconnection
Project Management: SNC Lavalin
Owner: Egyptian Electricity Transmission Company (EETC)
Value of approximately: 250 million $ + 30 million € + 950 million EGP
Project scope:
Works will be provided and executed on Turn Key basis, by providing
Engineering design services, fabrication, furnishing, delivery,
transportation to the site, unloading, site delivery, storing, civil works,
erection, installation, testing, commissioning, setting to work, putting in
operation, training, insurance till provisional acceptance, technical
assistance & supervision during trial operation
This is the first ever large-scale high-voltage direct current (HVDC)
interconnection link in the Middle East and North Africa. It will carry
power along a 1, 350 km route (839 mile) using overhead power lines
and a subsea cable across the Red Sea.
The interconnection will allow Egypt and Saudi Arabia to exchange up
to 3, 000 MW of power.
Project: Project 7000, Tawila Island Resort, Hurghada, Red Sea
Project Consultant: Shaker consulting group (SCG)
Owner: ALMASA Hotels
Value of approximately: 850 million EGP
Project scope:
Execute and construct a 5-star resort at the northern Islands of
Hurghada region known as Tawila Island, includes civil work, steel
structure, MEP work, HVAC works, internal & external finishing, testing,
commissioning. Tawila Island Resort is intended to provide 121 Keys
(31 Key as 1st phase + 90 as 2nd phase) with a mix of inland and
overwater bungalows, main arrival building, all-day dining, one
signature specialty restaurant, pools (adults, kids), kids club, gym, spa,
private beaches, pool bar, retail, and event spaces
Also construct a large Back of House area is done as the infrastructure
component for the island to work remotely from the mainland served
with staff accommodation, administration office, sewage treatment
plant, desalination plant, main kitchen, electrical substations, water
tanks and Fuel tanks
Project: Project 6000 (Al Massa Hotel- New Alamein)
Project Consultant: Engineering Consulting Group (ECG)
Owner: Financial affairs authority of the Egyptian Armed Forces
Project scope:
• Buildings concrete skeleton for podium and 6 high rise towers
• Six towers with post tension slab to level 110 M (27 Floors)
• Internal and external finishing and decoration for all buildings
• Construct site plan including gates, fences, flooring and infrastructure
• Including buildings, structures, foundations, earthwork, underground piping, utilities, roads, parking lot and fencing
Project: Vida Al Alamein Hotel Refurbishment (5 Stars) - 750 Million EGP
Project Consultant: Ali Nour El Din Nasser & partner (ANP)
Project Management: Mirage Leisure and Development
Owner: Emaar Misr
Project scope:
• Buildings concrete skeleton refurbishment including all structure elements
• Internal and external finishing refurbishment and decoration for all buildings
• Construct of new buildings ( health club, swimming pool and beach bar )
• Construct new site plan including gates, fences, flooring and infrastructure
• Including buildings, structures, foundations, earthwork, underground piping,
utilities, roads, parking lot and fencing
Company: Orascom Construction (OC)
The Consortium of: Orascom Construction (OC) & Siemens AG
Project: Burullus combined cycle power plant (4800 MW) - € 2bn plus 2bn EGP for site preparation
Project scope:
•Four turbine building included 8 combustion turbine generators and 4 steam turbine generator
•Four (4) Air cooled condensers (ACC) with all required balance of plant system
•Site preparation includes (4, 499 of Bored piles - 5, 518 of Driven piles - 11, 215 of Stone columns 10, 700 of Wick drains -2, 000, 000 m3 of Backfilling)
•The plant will utilize the sea water as the raw water source
•Site preparation, temporary construction, facilities, system excavation, grading, and storm water drainage
•Two control building, electrical building, circulating water pump house structure, water treatment area with control room and laboratory and pipe racks
•Including buildings, structures, foundations, earthwork, underground piping, duct banks, utilities, roads, parking lot, fencing, and circulating water piping
Company: Orascom Construction (OC)
Project: Marrasi village
Project Consultant: Raafat Miller Consulting (RMC)
Project Management: Turner Construction (TC)
Owner: Emaar Misr
Project scope: Villas Package 27 (A&B) - 265 Million EGP
• Work includes concrete skeleton in addition to the internal and external finishes of villas and town homes
• Site preparation, temporary construction, facilities, system excavation, grading, and storm water drainage
• Including buildings, structures, foundations, earthwork, underground piping, utilities, roads, parking lot and fencing
site engineer in
Company:- Dar El Mimar For Construction (DMC)
Project :- Diplomats Ras El Hikma “North Coast”
Project scope :-
• Work includes concrete skeleton in addition to the internal and external finishes of villas and town homes.
• Site preparation, temporary construction, facilities, system excavation and grading.
• Including buildings, structures, foundations, earthwork, underground piping, utilities, roads, parking lot and fencing.
Quality control (QC) engineer in
Company:- Orascom Construction Industrial (OCI)
Project :- Marrasi village
Villas package 18 & village D - EGP 800 million
work includes concrete skeleton in addition to the
internal and external finishes of villas and town homes.
site engineer in
Company:- Orascom Construction Industrial (OCI)
Project :- Marrasi village
Project scope :- Catania homes (1, 2) - EGP 600 million
Finishing works included the interiors and exteriors
Villas package 18 & village D - EGP 800 million
work includes concrete skeleton in addition to the
internal and external finishes of villas and town homes.
Project :- Nile sugar company - EGP 1.13 billion
• Work includes infra structure, concrete skeleton, internal and external finishes for company .
• fixation and systematic all electrical and mechanical machines and equipments .
Project :- AlAtf combined cycle power plant (750 MW) - EGP 2.8 billion
• One turbine building included 2 combustion turbine generators and 1 steam turbine generator .
• Tow outdoor heat recovery steam generators .
• control building, electrical building, circulating water pump house structure, water treatment area with control room and laboratory, pipe racks and access platforms .
• Site preparation, temporary construction, facilities, system excavation, grading, storm water drainage
• Design and construction of the ancillary facilities
• Including buildings, structures, foundations, earthwork, underground piping, duct banks, utilities, roads, parking lot, fencing, and circulating water piping
Company:- Hassan Allam Sans (HAS) and Consolidated Contractors Company (CCC)
Project :- Nubaria combined cycle power plant (750MW) - EGP 2.8 billion
• One turbine building included 2 combustion turbine generators and 1 steam turbine generator .
• Tow outdoor heat recovery steam generators .
• control building, electrical building, circulating water pump house structure, water treatment area with control room and laboratory, pipe racks and access platforms .
• Site preparation, temporary construction, facilities, system excavation, grading, storm water drainage
• Design and construction of the ancillary facilities
• Including buildings, structures, foundations, earthwork, underground piping, duct banks, utilities, roads, parking lot, fencing, and circulating water piping.
Project :- Nubaria combined cycle power plant (750MW) - EGP 2.8 billion
• One turbine building included 2 combustion turbine generators and 1 steam turbine generator .
• Tow outdoor heat recovery steam generators .
• control building, electrical building, circulating water pump house structure, water treatment area with control room and laboratory, pipe racks and access platforms .
• Site preparation, temporary construction, facilities, system excavation, grading, storm water drainage
• Design and construction of the ancillary facilities
• Including buildings, structures, foundations, earthwork, underground piping, duct banks, utilities, roads, parking lot, fencing, and circulating water piping.