إيهاب الدسوقى, Quality Manager

إيهاب الدسوقى

Quality Manager

Orascom Construction Limited - Other Locations

البلد
مصر
التعليم
بكالوريوس, Faculty of engineering
الخبرات
14 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 6 أشهر

Quality Manager في Orascom Construction Limited - Other Locations
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ يناير 2022

The Consortium of: - Orascom Construction & Hitachi Energy
Project: ±500 KV HVDC Saudi Egypt Interconnection
Project Management: SNC Lavalin
Owner: Egyptian Electricity Transmission Company (EETC)
Value of approximately: 250 million $ + 30 million € + 950 million EGP
Project scope:
 Works will be provided and executed on Turn Key basis, by providing
Engineering design services, fabrication, furnishing, delivery,
transportation to the site, unloading, site delivery, storing, civil works,
erection, installation, testing, commissioning, setting to work, putting in
operation, training, insurance till provisional acceptance, technical
assistance & supervision during trial operation
 This is the first ever large-scale high-voltage direct current (HVDC)
interconnection link in the Middle East and North Africa. It will carry
power along a 1, 350 km route (839 mile) using overhead power lines
and a subsea cable across the Red Sea.
 The interconnection will allow Egypt and Saudi Arabia to exchange up
to 3, 000 MW of power.

Quality Manager في Orascom Construction Limited
  • مصر - الغردقة
  • يوليو 2019 إلى ديسمبر 2021

Project: Project 7000, Tawila Island Resort, Hurghada, Red Sea
Project Consultant: Shaker consulting group (SCG)
Owner: ALMASA Hotels
Value of approximately: 850 million EGP
Project scope:
 Execute and construct a 5-star resort at the northern Islands of
Hurghada region known as Tawila Island, includes civil work, steel
structure, MEP work, HVAC works, internal & external finishing, testing,
commissioning. Tawila Island Resort is intended to provide 121 Keys
(31 Key as 1st phase + 90 as 2nd phase) with a mix of inland and
overwater bungalows, main arrival building, all-day dining, one
signature specialty restaurant, pools (adults, kids), kids club, gym, spa,
private beaches, pool bar, retail, and event spaces
 Also construct a large Back of House area is done as the infrastructure
component for the island to work remotely from the mainland served
with staff accommodation, administration office, sewage treatment
plant, desalination plant, main kitchen, electrical substations, water
tanks and Fuel tanks

QC team leader Engineer في Orascom Construction Limited
  • مصر - مرسى مطروح
  • يونيو 2018 إلى يوليو 2019

Project: Project 6000 (Al Massa Hotel- New Alamein)
Project Consultant: Engineering Consulting Group (ECG)
Owner: Financial affairs authority of the Egyptian Armed Forces
Project scope:
• Buildings concrete skeleton for podium and 6 high rise towers
• Six towers with post tension slab to level 110 M (27 Floors)
• Internal and external finishing and decoration for all buildings
• Construct site plan including gates, fences, flooring and infrastructure
• Including buildings, structures, foundations, earthwork, underground piping, utilities, roads, parking lot and fencing

Senior QC engineer في Orascom Construction Limited
  • مصر - مرسى مطروح
  • ديسمبر 2017 إلى يونيو 2018

Project: Vida Al Alamein Hotel Refurbishment (5 Stars) - 750 Million EGP
Project Consultant: Ali Nour El Din Nasser & partner (ANP)
Project Management: Mirage Leisure and Development
Owner: Emaar Misr
Project scope:
• Buildings concrete skeleton refurbishment including all structure elements
• Internal and external finishing refurbishment and decoration for all buildings
• Construct of new buildings ( health club, swimming pool and beach bar )
• Construct new site plan including gates, fences, flooring and infrastructure
• Including buildings, structures, foundations, earthwork, underground piping,
utilities, roads, parking lot and fencing

Senior QC engineer في Orascom Construction
  • مصر
  • مايو 2016 إلى ديسمبر 2017

Company: Orascom Construction (OC)
The Consortium of: Orascom Construction (OC) & Siemens AG
Project: Burullus combined cycle power plant (4800 MW) - € 2bn plus 2bn EGP for site preparation
Project scope:
•Four turbine building included 8 combustion turbine generators and 4 steam turbine generator
•Four (4) Air cooled condensers (ACC) with all required balance of plant system
•Site preparation includes (4, 499 of Bored piles - 5, 518 of Driven piles - 11, 215 of Stone columns 10, 700 of Wick drains -2, 000, 000 m3 of Backfilling)
•The plant will utilize the sea water as the raw water source
•Site preparation, temporary construction, facilities, system excavation, grading, and storm water drainage
•Two control building, electrical building, circulating water pump house structure, water treatment area with control room and laboratory and pipe racks
•Including buildings, structures, foundations, earthwork, underground piping, duct banks, utilities, roads, parking lot, fencing, and circulating water piping

Quality control (QC) engineer في Orascom Construction
  • مصر
  • يونيو 2014 إلى أبريل 2016

Company: Orascom Construction (OC)
Project: Marrasi village
Project Consultant: Raafat Miller Consulting (RMC)
Project Management: Turner Construction (TC)
Owner: Emaar Misr
Project scope: Villas Package 27 (A&B) - 265 Million EGP
• Work includes concrete skeleton in addition to the internal and external finishes of villas and town homes
• Site preparation, temporary construction, facilities, system excavation, grading, and storm water drainage
• Including buildings, structures, foundations, earthwork, underground piping, utilities, roads, parking lot and fencing

site engineer في (Dar El Mimar For Construction (DMC
  • مصر
  • أبريل 2013 إلى يونيو 2014

site engineer in
Company:- Dar El Mimar For Construction (DMC)
Project :- Diplomats Ras El Hikma “North Coast”

Project scope :-
• Work includes concrete skeleton in addition to the internal and external finishes of villas and town homes.
• Site preparation, temporary construction, facilities, system excavation and grading.

• Including buildings, structures, foundations, earthwork, underground piping, utilities, roads, parking lot and fencing.

Quality control (QC) engineer في (Orascom Construction Industrial (OCI
  • مصر
  • فبراير 2012 إلى أبريل 2013

Quality control (QC) engineer in
Company:- Orascom Construction Industrial (OCI)
Project :- Marrasi village
Villas package 18 & village D - EGP 800 million
work includes concrete skeleton in addition to the
internal and external finishes of villas and town homes.

site engineer في Orascom Construction Industrial (OCI)
  • مصر
  • نوفمبر 2010 إلى يناير 2012

site engineer in
Company:- Orascom Construction Industrial (OCI)
Project :- Marrasi village
Project scope :- Catania homes (1, 2) - EGP 600 million
Finishing works included the interiors and exteriors
Villas package 18 & village D - EGP 800 million
work includes concrete skeleton in addition to the
internal and external finishes of villas and town homes.

training engineer في Orascom Construction Industrial (OCI)
  • مصر
  • يوليو 2009 إلى سبتمبر 2009

Project :- Nile sugar company - EGP 1.13 billion
• Work includes infra structure, concrete skeleton, internal and external finishes for company .
• fixation and systematic all electrical and mechanical machines and equipments .

training engineer في Hassan Allam Sons (HAS) and Consolidated Contractors Company (CCC)
  • مصر
  • يونيو 2009 إلى يوليو 2009

Project :- AlAtf combined cycle power plant (750 MW) - EGP 2.8 billion
• One turbine building included 2 combustion turbine generators and 1 steam turbine generator .
• Tow outdoor heat recovery steam generators .
• control building, electrical building, circulating water pump house structure, water treatment area with control room and laboratory, pipe racks and access platforms .
• Site preparation, temporary construction, facilities, system excavation, grading, storm water drainage
• Design and construction of the ancillary facilities
• Including buildings, structures, foundations, earthwork, underground piping, duct banks, utilities, roads, parking lot, fencing, and circulating water piping

training engineer في Hassan Allam Sons (HAS) and Consolidated Contractors Company (CCC)
  • مصر
  • يونيو 2008 إلى سبتمبر 2008

Company:- Hassan Allam Sans (HAS) and Consolidated Contractors Company (CCC)
Project :- Nubaria combined cycle power plant (750MW) - EGP 2.8 billion
• One turbine building included 2 combustion turbine generators and 1 steam turbine generator .
• Tow outdoor heat recovery steam generators .
• control building, electrical building, circulating water pump house structure, water treatment area with control room and laboratory, pipe racks and access platforms .
• Site preparation, temporary construction, facilities, system excavation, grading, storm water drainage
• Design and construction of the ancillary facilities
• Including buildings, structures, foundations, earthwork, underground piping, duct banks, utilities, roads, parking lot, fencing, and circulating water piping.

training engineer في Hassan Allam Sons (HAS) and Consolidated Contractors Company (CCC)
  • مصر
  • يونيو 2007 إلى سبتمبر 2007

Project :- Nubaria combined cycle power plant (750MW) - EGP 2.8 billion
• One turbine building included 2 combustion turbine generators and 1 steam turbine generator .
• Tow outdoor heat recovery steam generators .
• control building, electrical building, circulating water pump house structure, water treatment area with control room and laboratory, pipe racks and access platforms .
• Site preparation, temporary construction, facilities, system excavation, grading, storm water drainage
• Design and construction of the ancillary facilities
• Including buildings, structures, foundations, earthwork, underground piping, duct banks, utilities, roads, parking lot, fencing, and circulating water piping.

الخلفية التعليمية

بكالوريوس, Faculty of engineering
  • في Alexandria University
  • يوليو 2010

Specialties & Skills

civil engineer
Structural Engineers
Engineering
Construction Engineering
computer
autocad
Primavera 6

اللغات

الانجليزية
متمرّس

العضويات

Egyption Engineers syndicate
  • Civil Engineer
  • August 2010

التدريب و الشهادات

Primavera 6 (تدريب)
معهد التدريب:
EAAC Institute
تاريخ الدورة:
January 2009

الهوايات

  • القراءه و العمل الخيري