• Position: Senior Project Engineer
Project Name: Damac Heights
Location: Dubai Marina, Dubai, United Arab Emirates
Duration: 36 Months
Client: DAMAC Properties
Construction Coast: Approx. AED 551 Million
http://www.arabtecuae.com/Page.aspx?PageId=108&id=78Project Description: The tower is a residential development, 420 meters high and with 85-floors will consist of 600 luxury apartments of one, two, and three bedroom units in addition to duplexes and penthouses.
Damac Heights will become one of the tallest buildings in Dubai and amongst the top three tallest residential buildings in the world.
• Position: Project Engineer
Project Name: Palazzo Versace
Location: Culture Village, Al Jadaf, Dubai, United Arab Emirates
Duration: 36 Months
Client: Emirates Sunland Group
Construction Coast: AED 1.1 Billion
Consultant: Halford / Hyder Consulting
http://www.arabtecuae.com/Page.aspx?PageId=108&id=31Project Description: One of the most prestigious and luxurious resort and outstanding landmark situated at the heart of Cultural Village Dubai. This project has 10 levels of luxury hotel with 213 rooms and 169 condominiums. There are also three levels of parking. The special feature of the project is the temperature controlled beach which is the finest in the UAE.
The Palazzo Versace will include suites, restaurants, spa and luxury villas, with the interior being designed using elements from various Versace collections.
Project Name: Dubai International Airport, Terminal 2- Expansion
Location: Terminal 2, Dubai, United Arab Emirates
Duration: 25 Months
Client: Dubai Aviation Engineering Company
Construction Coast: Approx. AED 600 Million
http://www.arabtecuae.com/Page.aspx?PageId=108&id=133Project Description: The Dubai International Airport Terminal 2 Expansion project will involve approx. 30, 000 m² of new buildings and 29, 000 m² of refurbishment. Dubai International Airport Terminal 2 will be able to handle more than 10 million passengers per year.
The scope of work includes superstructure and site works for: Terminal Building, Check-in Hall, Departure Area, Immigration Hall, Extension connecting the existing facility to the new building, Management Office, Refurbishment of the Existing Terminal, Lounge Areas, Baggage and Arrival Halls, Mechanical, Electrical, and Plumbing works, Site Works, Associated Facilities
• Position: Section Engineer
Project Name: Emirates Hills - Villas
Location: Emirates Hills, Dubai, United Arab Emirates
Client: Design and Build for various clients
Construction Coast: AED 700 Million
Consultant: Various
http://www.arabtecuae.com/Page.aspx?PageId=108&id=40Project Description: The project consists of ultra-luxury villas that are finished according to owners specifications: meaning, buyers get exactly what they pay for, and according to their own unique tastes.
Each property in Emirates Hills is different from every other, but each offers an unrivalled level of luxury, complete with private pools and views of the world class Montgomerie Championship Golf Course.
Project Name: Palazzo Versace
Location: Culture Village, Al Jadaf, Dubai, United Arab Emirates
Duration: 36 Months
Client: Emirates Sunland Group
Construction Coast: AED 1.1 Billion
Consultant: Halford / Hyder Consulting
http://www.arabtecuae.com/Page.aspx?PageId=108&id=31• Position: Site Engineer
Project Name: Tiara Palm Dubai Hotel and Tiara Residences
Location: Jumeirah Palm, Dubai, United Arab Emirates
Duration: 20 Months
Client: Zabeel Investment
Construction Coast: AED 1.5 Billion
Consultant: Dar Al Handasah
http://www.arabtecuae.com/Page.aspx?PageId=108&id=16Project Description: Tiara Hotel and Residences consists of seven 15-storey low-rise buildings built in a V shape, incorporates a world class hotel, offering one, two and three-bedroom apartments with high quality finishes.
The project is composed of 658 apartments, 132 furnished apartments and 243 hotel keys, as well as a beach club house, a business center, food and drink outlets, meeting rooms, and a health club and gymnasium.
Project Name: DIFC Gate Village
Location: DIFC, Dubai, United Arab Emirates
Duration: 27 Months
Client: Tecom/DIFC
Construction Coast: AED 521 Million
Consultant: Hopkins