Total Years of Experience: 8 Years, 1 Months
June 2018
To Present
Maintenance Technician
I found this job using Bayt.com
at CAF Arabia
Location :
Saudi Arabia - Riyadh
I'm doing daily maintenance of trains.
On board technician from last 15 months.
Daily reporting of faults, analysis of working condition, if train having a problem during service then I will be responsible for solving that problem and try to reach near by station safely.
On board technician from last 15 months.
Daily reporting of faults, analysis of working condition, if train having a problem during service then I will be responsible for solving that problem and try to reach near by station safely.
March 2016
To December 2017
Testing Inspector
at Bombardier Transportation India Pvt. Ltd
Project : QNGR And DMRC RS11
September 2015
To February 2016
Trainee Engineer
at Schurter Electronics India Pvt. Ltd
Reference : Chittaranjan bai ( Testing Manager)
Mo:- +91 9078676284
Responsibilities:
•Involved in testing and commissioning, fault troubleshooting of trains.
•Automatic Harness testing With the help of MK tester for DMRC and cirris tester for QNGR.
•Testing & fault trouble shooting of Auxiliary Converter, Traction Converter (Based on VVVF Technology), LCB (Line Circuit Breaker), CT (Current Transformer), PT (Potential Transformer), Surge Arrestor, Traction Motor, Main Transformers.
•Responsible for static test and responsible for failure investigation and fault finding.
•Detail failure analysis, finding of root cause and preparing the failure incident reports based on the findings and corrective actions.
•In Process testing and Check of all connection and make report .
•Insulation test of train
Mo:- +91 9078676284
Responsibilities:
•Involved in testing and commissioning, fault troubleshooting of trains.
•Automatic Harness testing With the help of MK tester for DMRC and cirris tester for QNGR.
•Testing & fault trouble shooting of Auxiliary Converter, Traction Converter (Based on VVVF Technology), LCB (Line Circuit Breaker), CT (Current Transformer), PT (Potential Transformer), Surge Arrestor, Traction Motor, Main Transformers.
•Responsible for static test and responsible for failure investigation and fault finding.
•Detail failure analysis, finding of root cause and preparing the failure incident reports based on the findings and corrective actions.
•In Process testing and Check of all connection and make report .
•Insulation test of train
Responsibilities:
•Check module of connectors and test with tester
•Daily production planning
•Material Management and handle
•Packaging and Dispatching of Product
•Check module of connectors and test with tester
•Daily production planning
•Material Management and handle
•Packaging and Dispatching of Product
Share on Facebook