Eid Gaballa, Project Manager

Eid Gaballa

Project Manager

SUIDO KIKO MEDDEL EAST (SKME-Japanese Company) / JEDDAH-SAUDI ARABIA

Lieu
Arabie Saoudite - Khobar
Éducation
Baccalauréat, Mechanical Engineer
Expérience
19 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :19 years, 11 Mois

Project Manager à SUIDO KIKO MEDDEL EAST (SKME-Japanese Company) / JEDDAH-SAUDI ARABIA
  • Arabie Saoudite - Jeddah
  • Je travaille ici depuis janvier 2009

Design and Execute RO, MBR and Conventional Systems through Prepare Volume calculation, Hydraulic calculation, PFD, P&ID, Plot plan design, Technical specification preparation and equipment selection, Quotation and vendor’s offer evaluation, BOM-ROM-GRN preparation, Piping and mechanical structure detail design, Plant control method design, Project schedule, Project Budget Control, Cash follow up, Project risk assessment, Commissioning SV, Manual preparation, Trouble shooting at field, Successful Hand Over etc.
Projects:
1. MBR 2x4, 000 m3/day
2. MBR 2x250 m3/day
3. Hardness Removal RO2x50 m3/day
4. Mobile RO 350 m3/day
5. Sea Water desalination Plant (RO/MF 4x2500 m3/day)

Mechanical Head/ Projects duputy Manager à Professional Technical Service. (PROTEC) / QATAR-DOHA
  • Qatar - Doha
  • janvier 2006 à janvier 2009

-Prepare working Drawings and method statement.
-Prepare all technical submittals, Inspection requests, Daily & Monthly Reports.
-Follow up the work progress as per as project time schedule.
-Develops the Project Plan with the team and manages the team’s performance of project tasks.
-Secure acceptance and approval of deliverables from the Project Sponsor and Stakeholders.
-Responsible for communication, including status reporting, risk management, escalation of issues that cannot be resolved in the team, and, in general, making sure the project is delivered in budget, on schedule, and within scope.
-Monitor, verify and document the work being performed through subordinates.
-To ensure proper implementation of design at site.
-- Provide technical assistance to the construction team as needed.
- Ensure that all site activities are conducted under controlled conditions as per shop drawings, method statements, specification and work plan

Projects:
1. MED desalination Plant 1300m³/day.
2. Gas Pressure reduction station (GPRS).
3. Waste water treatment Plant 600m³/day.
4. Waste water treatment Plant 2, 700m³/day.
5. SWRO (See water Reverse Osmosis treatment Plant 2, 500m³/day).
6. Waste water treatment Plant 2x600m³/day.

R&D Engineer à Misr Compressor Manufacturing Co. (ZMC) Hermetic Compressor Company
  • Egypte - Le Caire
  • juillet 2004 à janvier 2006

Research and development Engineer (R&D).
Redesign and development the Comp. Part's through
1-Simulation Models For Stress Analysis - Fluid dynamic - Heat Trans.
2- Using new rotating mass balancing reduce noise and vibration
3- Optimize the existing design by using CAD/CAE soft ware.
4-Vibration analysis using P&K 5- Process Improvement
6- Write Bills of Materials

Éducation

Baccalauréat, Mechanical Engineer
  • à Cairo university
  • juillet 2004

Bachelor Of Engineer Cairo University – Fayuom Branch Major Industrial Engineer Dept. Grade Very Good (77%) -2004 Graduation Project Dissimilar welding Experimental and Simulation by Finite Element Project Grade Excellent Master degree (under study) Cairo University – Faculty of Engineer –Mechanical Design and Production Dept. Under Work: dynamic analysis and balancing for Reciprocating machine Part’s using FEA.

Specialties & Skills

Water Treatment
Waste Water Treatment
Electro mechanical
Planning
Project Management
Inventor
Autocad
primavera/MS Project
Simulation Software
WaterCad, SewerCad
Revit MEP

Langues

Anglais
Moyen
Arabe
Expert