Total Years of Experience: 10 Years, 10 Months
January 2014
To Present
ELECTRICAL ENGINEER
at SATORP
Location :
Saudi Arabia - Jubail
I am in charge of the reliability tools, plans and strategies for power plants and electrical equipment.
I provide technical assistance, standards, procedures and trouble-shooting support for all electrical equipment and other departments.
I provide technical advice during new electrical equipment proposals, and review equipment specifications, documents and drawings before deployment.
I participate in designing plant modifications of a technical nature.
I maintain and ensure electrical system spares are established and maintained.
I provide technical assistance, standards, procedures and trouble-shooting support for all electrical equipment and other departments.
I provide technical advice during new electrical equipment proposals, and review equipment specifications, documents and drawings before deployment.
I participate in designing plant modifications of a technical nature.
I maintain and ensure electrical system spares are established and maintained.
January 2018
To February 2018
ELECTRICAL LEADER
at SATORP
Location :
Saudi Arabia - Jubail
I assigned as block-3 electrical leader. Block 3 is a special block, which uniquely consist of three large areas. Each area is partially in shutdown.
I am responsible of all motors that to be serviced in site or in the workshop as a major overhaul.
I support the work service for SG and MCC in nine substations.
I am responsible for implementing the MOC and troubleshooting.
I am accounted of completing the service required within the period.
In charge of all electrical emergency work that is not in the original plan.
Dealing and communicating with contractors and other discipline for lifting, transportation, servicing, spare parts and operation.
I am responsible of all motors that to be serviced in site or in the workshop as a major overhaul.
I support the work service for SG and MCC in nine substations.
I am responsible for implementing the MOC and troubleshooting.
I am accounted of completing the service required within the period.
In charge of all electrical emergency work that is not in the original plan.
Dealing and communicating with contractors and other discipline for lifting, transportation, servicing, spare parts and operation.
May 2017
To November 2017
ASSISTANT LEAD ELECTRICAL COMMISSIONING
at ARAMCO- SATORP
Location :
Saudi Arabia - Jubail
I took part in the establishment of SATORP Internal Storage Facility (ISF), a new project that commissioned by ARAMCO.
I handled the commissioning activities of the various components of the project including MV&LV SG, MV&LV MCC, HV&LV transforms, power panels, lighting & lighting panels, AC UPS, DC UPS, motors, MOVs, EDG, ECS, and LSS.
I led the implementation team, supported the pre-commissioning, offered technical support and solved prevailing problems.
I handled the commissioning activities of the various components of the project including MV&LV SG, MV&LV MCC, HV&LV transforms, power panels, lighting & lighting panels, AC UPS, DC UPS, motors, MOVs, EDG, ECS, and LSS.
I led the implementation team, supported the pre-commissioning, offered technical support and solved prevailing problems.
May 2012
To December 2012
Field Engineer
at General Electric
Location :
Saudi Arabia - Eastern Province
Installing, PPM and troubleshooting for Ultrasound and BMD machine
Also, connecting them to a Pacs and Worklist
finally, I do other office work
Also, connecting them to a Pacs and Worklist
finally, I do other office work