محمد المهدي, Commissioning Manager

محمد المهدي

Commissioning Manager

Nesma and PArtners

البلد
المملكة العربية السعودية - الدمام
التعليم
بكالوريوس, Electrical And Control Engineering
الخبرات
22 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 4 أشهر

Commissioning Manager في Nesma and PArtners
  • المملكة العربية السعودية - الدمام
  • أشغل هذه الوظيفة منذ يونيو 2021

o Project Name: Upgrade Abqaiq filed Water Injection System.
o Company: Nesma and Partners.
o Location: Abqaiq GOSP#2, GOSP#5.
o Client: Saudi Aramco.
o Position: Commissioning Manager.
o Project Description:
o New Water oil Separator (WOSEP), GOSP#2.
o Salt Water Injection Pumps, GOSP#2, GOSP#5.
o Sea Water Injection Pumps, GOSP#5.
o Sea Water intake Pipe line (QUAD-1), to GOSP#5.
o Electrical and Utility Power Networks.
o East and West Pipe line Flanks.
o Sectionalizing Valve Station for east and West Flanks.
o New 69/13.8 KV Substation in GOSP#5.
o Fire Station.
o Security Gate House and Security System.

Commissioning manager في Nesma and Partners
  • المملكة العربية السعودية - الدمام
  • أكتوبر 2019 إلى يونيو 2021

Project Description:
Pre-Commissioning, Commissioning, Start-Up and Performance Tests
of FBC, GSRC Projects including Residential Buildings ( 13-Bildings)
and Utility Support facilities as per Followings, -
 115/13.8KV Electrical source substation fed from FGP Plant
Substation, 380/115 KV.
 Emergency Power Supply System and Generators.
 Chiller Plant and chilled/ HVAC systems.
 Potable, Irrigation, Raw water, Fire Water, Drainage Plants and
Networks.
 Electrical and Utility Power Networks.
 STP Plant.
 Community, Recreation and Diwaniya Centers.
 Medical Clinic and Laundry.
 Fire Station.
 Security Gate House and Security System.

Commissioning Manager في ALFANAR
  • المملكة العربية السعودية - الدمام
  • مارس 2017 إلى أكتوبر 2019

Project Description:
Pre-Commissioning, testing, commissioning and energize of the
Following:
 380KV GIS System 13 Feeders, 2-Incomers and 1- Bus
Coupler.
 115KV GIS 10 Feeders, 2- Incomers . and 1- Bus
coupler.
 115/13.8 KV 50/66MVA Power Transformers .
 13.8/115KV 45MVA Power Transformers.
 115/11 KV 20MVA Power Transformers.
 13.8 KV, 11KV, 480V Switchgears.
 Control and Protection Systems.
 SAS, SCADA and RTU Systems.
 Fire alarm and Protection Systems.
 HVAC Systems.

Testing Team Leader في ALFANAR
  • المملكة العربية السعودية - الدمام
  • سبتمبر 2014 إلى مارس 2017

Project Name: Abqaiq Power Cogen-Plan Gas Turbine Generator & HRSG.
o Company : Alfanar.
o Location: Abqaiq, Eastern Region.
o Client : Saudi National Grid(SEC NG), Saudi Aramco.
o Position: Testing and Commissioning Team Leader.
o Project Description:
Testing and Commissioning of the Followings:
 Interface of Abqaiq Substation 230/115KV, Jawatha
and Al-Uqauir 380/115KV Substations.
 Al-Uqair 380KV/115 KV BSP.
 PSA system and interface with Dispatcher.
 Open/Closed Loop Checks and Verification.
 Line Stability and end to end Tests.

Software Testing Team Leader في ALFANAR
  • المملكة العربية السعودية - الدمام
  • أكتوبر 2011 إلى سبتمبر 2014

Project Description:
Pre-Commissioning, Testing and Commissioning of the 5- Substations,
each consists of:
 115KV GIS 8 Feeders, 2- Incomers . and 1- Bus coupler.
 115/ 13.8 KV 50/66MVA Power Transformers .
 13.8 KV, 480V Switchgears.
 Control and Protection System.
 SAS and RTU System.
 Fire alarm and Protection Systems.
 HVAC Systems.

Pre-Commissioning, Commissioning, Start-Up, Warranty of Al-Qassim Power PlantSenior Engineer في Arabian Bemco Contracting Company
  • المملكة العربية السعودية - القصيم
  • أبريل 2007 إلى أكتوبر 2011

Project Description:
Pre-Commissioning, Commissioning, Start-Up, Warranty of Al-Qassim
Power Plant which consists of:
 12 No’s of Gas Turbine Frame#5 7-EA Mark-2 Speed-troncic
Controller.
 6 No’s 11/13.8 Kv 50/67MVA power Transformers.
 13.8Kv, 4.16Kv, 11Kv, 480V Switchgears and MCC, s.
 DCS and SCADA and RTU systems.
 Power Plant Automation and DCS system.
 GT’s and Power System Protection Systems.
 Integration of interface with Generation Dispatcher Center.
 Water Treatment Plant.
 Fuel Oil Treatment and Forwarding Plants.
 Air Compressors Plant.
 Fire water Plant.
 Control and Scada Buildings.
 Administration Buildings.
 13.8/115/KV Substation.
 Fire alarm and Protection Systems, Telephone, DATA, Systems.

Testing and Commissioning Senior Engineer. في Arabian Bemco
  • المملكة العربية السعودية - الدمام
  • فبراير 2005 إلى أبريل 2007

Project Name: Madina Bulk Plant
o Company : Arabian Bemco Contracting.
o Location: Al-Madina, Western Region.
o Client : Saudi Aramco.
o Position: Testing and Commissioning Senior Engineer.
o Project Description:
Pre-Commissioning, Commissioning, of the Following:
 Oily Water Sump Pumps,
 Fire Water Pumps (motor Driven and Diesel Generator Driven).
 Diesel Loading Pumps.
 Gasoline, Kerosene Pumps.
 Oil Transfer Pumps.
 Raw Water System.
 Emergency Diesel Generator.
 Foam Skids, and Storage Tanks
 33KV, New Transmission Line.
 33KV, 480 V, 220V Switchgears.
 Switchgear Building, Loading Pumps Station Building, admin
and Control Buildings.

Electrical Construction Engineer. في Arabian Bemco Contracting Company
  • المملكة العربية السعودية - الهفوف
  • يناير 2002 إلى فبراير 2005

Project Description:
 GT, GE-7FA, 173 MW, 6.9 KA, 3600 RPM.
 Power Transformers (18 KV/230 KV, 240 MVA OLTC).
 Combined Static Start Excitation System (LCI/EX).
 Packed Control Compartments (GE-PEECC) wiht related MCC’s
 Switchgears, C.B’s, Disconnect and Earth Switches.
 Gas compressor skids.
 Service and Instrumentation Air Compressors Skids
 Hydrogen Generation Plant skids, GE supplied.

الخلفية التعليمية

بكالوريوس, Electrical And Control Engineering
  • في Elmansura univ
  • فبراير 2000

Specialties & Skills

Power Plants
Electrical Maintenance
Construction Engineering
Commissioning
CONSTRUCTION
COMMUNICATIONS
OPERATIONS
COMMISSIONING
DESIGN REVIEW
ELECTRICITY
INSTRUMENTATION
INTEGRATION
GAS TURBINE

اللغات

الانجليزية
متمرّس

التدريب و الشهادات

Building effective Team Culture (الشهادة)
Stratigic Leadership and Management (الشهادة)
تاريخ الدورة:
January 2022
Leading Teams , Developing as a leader (الشهادة)
تاريخ الدورة:
February 2022