Total des années d'expérience :33 years, 2 Mois

Lead Mechanical à Prima Energi Consult
  • Indonésie
  • Je travaille ici depuis janvier 2017

My duties:
1. Review contract, scope of work, project schedule of Power Plant Project, New Energy.
2. Check and review Balance Of Plant (BOP), the mechanical and piping engineering project documents to follow project specification and project standard.
3. Making data sheet for mechanical equipment and piping, plumbing, material specification, MTO, HVAC, TBE.
4. To coordinate mechanical engineers, piping engineers and designers for Feasibility Study
and Detail Design
5. Making estimation cost for project and quotation.

Sr Mechanical Piping Engineer à eni
  • Indonésie
  • novembre 2013 à novembre 2015

My duties:
1. Review contract, scope of work, project schedule.
2. Check and review the piping engineering project documents are following project Specification and international standar ie. : ASME B31.3;31.4;31.8; B16.5, EEMUA, ISO, DNV and eni standard.
3. Check and review PID drawing, Valves Data sheet, piping material thickness calculation
sheets.
4. Check and review GA drawing, equipment layout, piping layout & routing at HULL,
LQ, Helydeck, TOPSIDE & Onshore Receiving Facility to use Navis work.
5. Check progress and review isometric drawing on HULL, TOPSIDE & Onshore Receiving Facility for material CS, LTCS, SS316/SS316L, SS Duplex, SS-Super Duplex, Cu Ni, CPVC and GRP piping.
6. Check TBE for piping material, BOM, Procurement status and material schedule deliver to site.
7. Interface with other project department.
8. Review Stress Analysis calculation sheet, involves HAZOP and HAZID

Sr Project Engineer à Wood Group Kenny
  • Indonésie
  • janvier 2013 à septembre 2013

My duties:
1. Review basic engineering drawing from client.
2. Review contract, scope of work, project schedule and site survey.
3. Coordinate all discipline engineers for preparing manhrs to carry out the engineering work, ie. FEL 1-2-3, Basic design, Detail Design.
4. Arrange weekly meeting and monthly meeting between team and client.
5. Interface with other department, sub. contractor or vendor.
6. Involve HSE for the project.
7. Check the progress, cost control and project schedule.
8. To deliver engineering work on schedule & within budget.

Sr Project Engineer à Wood Group CCC
  • Oman - Muscat
  • mars 2012 à décembre 2012

My duties:
1. Review basic engineering drawing from client.
2. Review contract, scope of work, project schedule and site survey.
3. Coordinate all discipline engineers for preparing manhrs to carry out the engineering & construction work, ie. Concept Study, Basic Design, Detail Design, EPCI.
4. Arrange weekly meeting and monthly meeting between team and client Petroleum Development Oman (PDO).
5. Interface with other department, sub. contractor or vendor and other contractor.
6. Involve HSE for the project.
7. Check the progress, cost control, project schedule and prepare document for invoicing to client.
8. To deliver the project safely, on schedule, within budget.

Sr Pre Commissioning/Commissioning Engineer à NISCONI
  • Indonésie
  • mars 2011 à février 2012

My duties:
1. Review engineering drawing for structural, mechanical and piping drawing.
2. Review contract and scope of work.
3. Pre-Commissioning plans, as appropriate
4. Prepare system and sub system limits use ICAPS
5. Define system pre-commissioning requirement, as appropriate
6. Prepare check sheet format, pre-commissioning procedure
7. Prepare work control procedure, work packages, including calculation and drawings for company approval.

Sr Pre Commissioning/Commissioning Engineer à NISCONI
  • Indonésie
  • mars 2011 à février 2012

My duties:
1. Review engineering drawing for structural, mechanical and piping drawing.
2. Review contract and scope of work.
3. Pre-Commissioning plans, as appropriate
4. Prepare system and sub system limits use ICAPS
5. Define system pre-commissioning requirement, as appropriate
6. Prepare check sheet format, pre-commissioning procedure
7. Prepare work control procedure, work packages, including calculation and drawings for company approval.

Sr Project Engineer à Black Cat Engineering Construction
  • Qatar
  • juillet 2008 à mars 2011

My duties:
1. Review engineering drawing for structural, mechanical and piping drawing.
2. Review contract and scope of work.
3. Coordinate all site engineers and supervisors at gas lift manifolds and wellheads area.
4. Making site design work and site survey (FEED Study)
5. Making planning and schedule for manpower, equipment, material, tools and utility.
6. Interface with other discipline and client
7. Making method statement for execution works
8. Check and review data sheets from vendor, pumps, equipments, vessels, materials.
9. Checking and supervise during fabrication at plant yard.
10. Assist for pre-commissioning and commissioning

Sr Project Engineer à Karinda Daya Perkasa
  • Indonésie
  • juin 2006 à juin 2008

1. Review engineering drawing for mechanical equipment, alignment sheet of pipeline and piping drawing.
2. Review contract and scope of work of Pipeline Project.
3. Coordinate with procurement, all site supervisors during preparation work and construction. (Site survey ROW, site clearing, transportation, stringing, welding joint,
NDT, trenching, field joint coating, Holiday test, lowering, chathodic protection, back filling, hydrotest, reinstatement, commissioning.
4. Making site design work and site survey
5. Making planning and schedule for manpower, equipment, material, tools and utility.
6. Interface with other discipline/department and client
7. Making method statement for execution works.
8. Check and review data sheets from vendor, pumps, equipments, vessels, materials.
9. Assist for pre-commissioning and commissioning
10. Making progress report and cost control.

Construction Manager à Kawan Abadi Sejahtera
  • Indonésie
  • janvier 2003 à avril 2006

My duties:
1. Review engineering drawing for civil work, structural, mechanical equipment, tank and piping drawing.
2. Review contract and scope of work.
3. Coordinate with procurement, site supervisors during preparation work, construction and pre-commissioning and commissioning work.
4. Making site design work and site survey
5. Making planning and schedule for manpower, equipment, material, tools and utility.
6. Interface and meeting with subcontractor and client
7. Making method statement for execution works.
8. Check and review data sheets from vendor, pumps, equipments, vessels, materials.
9. Making progress report and cost control.

Sr Mechanical Project Engineer à Niigata Construction/ Shinko Plantech
  • Indonésie
  • avril 1995 à décembre 2002

My duties:
1. Review engineering drawing and design for civil work, structural, mechanical equipment, tank and piping engineering drawing.
2. Review contract and scope of work.
3. Coordinate with procurement, engineers, site supervisors during preparation work, construction and pre-commissioning and commissioning work.
4. Making site design work and site survey (FEED Team)
5. Making planning and schedule for manpower, equipment, material, tools and utility.
6. Interface and meeting other discipline and client
7. Check and review data sheets from vendor, pumps, equipments, vessels, materials.
8. Making progress report and cost control.
9. Coordination for maintenance work, turn around (TA), mini-shutdown work (MSDW), Routine daily Maintenance (RDM) for static equipment (Column, vessel, heat exchanger,
furnace, filter, reactor, tank ) and rotating equipment (Pumps, turbine generator, compressor, blower).
10. Piping modification project.

Sr Mechanical Engineer à Akindo Karya Gemilang
  • Indonésie
  • octobre 1993 à mars 1995

My duties:
1. Review engineering drawing and design for mechanical equipment and piping drawing.
2. Review contract and scope of work.
3. Coordinate with procurement, engineers, site supervisors during preparation work, construction and pre-commissioning, commissioning work and start up.
4. Making planning and schedule for manpower, equipment, material, tools and utility.
5. Interface and meeting with subcontractor and client
6. Making progress report and cost control.
7. Coordination for maintenance work, turn around, mini-shutdown work for static equipment ( Column, vessel, heat exchanger, furnace, filter, reactor, tank ) and rotating equipment ( Pumps, turbine generator, compressor, blower ) and piping modification work.

Technical Engineer à Toyo Kanetsu KK
  • Indonésie
  • janvier 1991 à septembre 1993

My duties:
1. Review engineering drawing for tank and piping drawing.
2. Coordinate with procurement, site supervisors during preparation work, construction and pre-commissioning.
3. Supervise during erection work for Double wall Ethylene tank, Spherical Butane tank, Floating Roof tank and Atmospheric tank.
4. Making site design work and site survey
5. Making planning and schedule for manpower, equipment, material, tools and utility.
6. Check and review data sheets from vendor, pumps, valve and materials.

Mechanical Engineer à Insal Utama
  • Indonésie
  • décembre 1989 à décembre 1990

My duties:
1. Review engineering drawing for machinery, equipment and piping drawing.
2. Making design for equipment and piping work.
3. Making estimation cost and MTO.

Éducation

Baccalauréat, Mechanical
  • à Institute Technology Sepuluh November Surabaya
  • août 1989

Specialties & Skills

Microsoft Office Applications
Primavera
MS Project
Project Management
Nawis Work Review
PDMS Review

Langues

Anglais
Expert

Adhésions

PIPI
  • member
  • January 2000

Formation et Diplômes

Caesar II (Formation)
Institut de formation:
P and ID
Date de la formation:
March 2017
Durée:
40 heures
Primavera P6 (Formation)
Institut de formation:
Conztruct Engineer
Date de la formation:
February 2016
Durée:
60 heures
Training SPC PUMA 5, ENI Indonesia (Formation)
Institut de formation:
Aveva Marine
Date de la formation:
November 2013
Incident and Injury Free” Health and Safety Course (Formation)
Institut de formation:
Qatar Gas
Date de la formation:
March 2010
HUET and Sea Survival (Formation)
Institut de formation:
Venture Gulf Qatar
Date de la formation:
July 2010
Training for ICAPS R3 2.0 for Total E & P Indonesia (Formation)
Institut de formation:
Total Indonesia
Date de la formation:
May 2011

Loisirs

  • Reading, Travelling, Jogging, gardening
    many established brotherhood with strangers, adding cultural insight knowledge. add knowledge to solve problems with the team