EMAD HANNA, Projects Manager

EMAD HANNA

Projects Manager

Abdullah Mohamed Alsikhan company- ASASCO -

Location
Saudi Arabia - Riyadh
Education
Master's degree, الهندسة المدنية
Experience
41 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :41 years, 9 Months

Projects Manager at Abdullah Mohamed Alsikhan company- ASASCO -
  • Saudi Arabia - Riyadh
  • My current job since July 2010

in field of water and waste water flow nets, and pipelines, pumping station :

Full Time .
MY DUTIES IN THIS COMPANY IS :
To study and pricing the Company`s Governor Tenders ( Biddings ), and NWC Tenders in field of water and waste water pipelines and flow nets, STP & WTP at Saudi Arabia .
Arrangement for the supplier and sometimes importing the required project`s materials as pipes, fittings, pumps, valves, flow meters, measuring instruments, , , , , etc .
The management of the company`s project, for a lot of projects, most of it already executed and some other under construction , and here below the names of these projects :

•Extension of transmission water pipeline at Buraydah - Qassim , with budget ( 90 Million SAR )
•Nadwah waste water project in Riyadh ( 74 Million SAR

TECHNICAL DEPARTMENT DIRECTOR at شركة عبد الله محمد الصيخان و أولاده للتجارة و المقاولات
  • Saudi Arabia - Riyadh
  • My current job since July 2010

أدارة المشاريع الهندسية للشركةمن أعمال و مشروعات انشائية و أعمال بنية تحتية - دراسة الأسعار للمشاريع و تقديم العطاءات الحكومية و للقطاع الخاص- متابعة و جلب مواد المشاريع الجاري تنفيذها بأسعار مناسبة - متابعة التنفيذ للمشاريع و متابعة مديري المشاريع و تدعيم الأحتياجات الفنية للمشاريع و توريد احتاجاتها في موعدها دون تأخير من مواد للتنفيذ - متابعة متطلبات مالكي المشاريع التى تم ترسيتها على الشركة و متابعة سير و تقدم العمل بالمشاريع و تقديم المستخلصات للمشاريع و مطابقة التنفيذ مع البرنامج التنفيذي لكل منها دون تأخير

مدير مشاريع at عبد الله محمد الصيخان للتجارة و المقاولات
  • Saudi Arabia - Riyadh
  • July 2010 to September 2020

دراسة المنافسات و جلب تسعيرات المواد و متابعة تنفيذ المشاريع و مساندة مديري المشاريع فنيا و توفير المواد المطلوبة للمشاريع

مدير مشاريع at عبد الله محمد الصيخان للتجارة و المقاولات
  • Saudi Arabia
  • July 2009 to November 2017

ادارة و تنفيذ مشاريع انشائية و مشاريع المياه و الصرف الصحي بالمملكة
دراسة المنافسات العامة و الخاصة للشركة
توفير المواد المطلوبة للمشروع
متابعة التنفيذ طبقا للبرنامج الزمني للمشاريع و للميزانية الموضوعة لكل مشروع

Project Manager at 15 th
  • Egypt
  • June 2007 to October 2009

MY responsibilities was the supervision as a consultant, of the here below projects :

1-Supervision and carry out of High Lifting Water pump station at Al-Sherouq City of capacity 120, 000 m3 / day. ( Talat Mostafa co. was the contractor )
This Water Pump Station consists of 3 groups of pumps, each group consists of 3 pumps of different head , 1st group of 120 ms. Head, 2nd group of head 85 ms., and 3rd group of head 45 ms.
Each lifting pump can cover the water consume of one third of
EL-Sherouq city, and the second pump for future use, and the third as stand by pump.
This water pump finished on 8th of January, 2009 and became under the operation of water company at 19th, march, 2009.

2 - Executing of High Water Elevated Tank of Capacity of 3000 m3 at Sherouq city:
This elevated tank to make a Hydraulic Stability of Sherouq water net, and it is finished by 24th of may 2009.

3 - Executing of Main Irrigation Flow Net for the green areas at
El- Sherouq City .
It is consists of 300 km. of UPVC pipes and Pre-stressed Concrete pipes for diameter between 150 mm up to 900 mm .
(this Irrigation flow net, executed 105 % of its primary budget and the contractor was Arab Contractors Co. ) .

at 1 s
  • June 2005 to June 2007

My Own Office - Egypt
- Construction of some concrete Bridges on the Villages Canals belongs to irrigation Ministry at Fayoum .
- Private Construction works and Finishing works by my own office,
\{construction and finishing of new buildings

project manager at Edalco Co
  • June 2000 to May 2005
at Abu El – Noor Village With Fathi Hashim Company belong to Al – Awkaf Ministry
  • January 2003 to June 2004

The renovation and development of the Lawyers Syndicate Building at fayoum city as a site manager for Edalco company
- Construction of a Mosque

Project Manager at Cooperative Society for Construction and Housing – of Sohagg
  • June 1999 to December 2002

A lot of Ductile iron water pipelines projects of Dia. 500 mm, and 400 mm, & many plastic PVC pipelines for dia. 300 to dia. 100 mm at many villages at Fayoum Governorate, Egypt, some of it at (Gaaffer village - Abu`Elnoor Village - Al- Haggar Villages, , , , , , etc

Site Manager at Shaban Ragab Co
  • May 2001 to November 2001

Construction of the Security Force Accommodation buildings at Azab region, Fayoum - Egypt . ( Belong to Ministry of Interior) .

Site Manager at Adalco co
  • May 2000 to April 2001

A ) At Farm & Villa of the Exterior Trade Minister Mr. Youseph Botros Ghali on Lake Karoun beach, Fayoum Governorate - Egypt :

•Build up of a rocky walls and gates for the villa outside boundary
•Construction of R. Concrete protection Retaining wall for the farm against the streams of Qaroon lake .
•Build up and installations of the Steel Barbed wires, Steel Fence and Boundary wall for the farm.
•Swimming Pool, Service House, Car Sheds, and Villa Annex .
•Other Decoration and finishing works at the garden of the villa.

Assistant Manager at Arabian Anabib Co. ( belong to Aziz Company Limited )
  • to January 2001

project & cooperation in executing part of Haier STP Project

  • March 2000 to November 2000

Waste Water of plastic PVC flow nets Dia. 110 mm, 150 mm, at Abo-Alkasem, and Al- Lahoon cities, Fayoum Governorate

  • Egypt
  • April 1999 to April 2000

Waste Water pipelines of Dia. 250mm, and 300mm plastic PVC at different provinces of

Manger at International Trading & Contracting
  • Egypt
  • July 1996 to May 1997

Executing of Two Waste Water treatment Station (STP )
( cap. 10.000 m3/day & 20.000 m3/day ) at Matar`tares city and Deffeno city including the following items :

•Intake, Grit chamber, Collecting flood material building
•Oxidation tanks, Settling tanks, Drain measuring tank
•Internal pump station, Sludge pump station, Sludge concentrating tank
•Drying pump
•Chlorination detach and Chlorination building .
•Workshop building, store and guard house .
•Administration building .

Projects Manager at Cooperative Society for Construction & Housing - Suhagg
  • June 1990 to June 1996
Assistant Manager at Diyar Corporation
  • United Arab Emirates
  • April 1989 to May 1990
Technical representative at Gemayel Carroserie Factory
  • Saudi Arabia
  • June 1988 to March 1989

Technical support for sales Business.
•Supervising the workshop activities
•Preparing Specifications for the Production .
•Studying Tenders .

projects Manager at Saad Ali Al – Zhrani Contracting Establishmen
  • Saudi Arabia
  • April 1986 to November 1987

Executing of Steel Trusses at King Fisal Academy - construction of steel trusses of the workshop and administration buildings inside King Fisal Academy :
Construction of concrete footing and steel trusses for workshop, as well as finishing works .
Construction of concrete footings and steel structure for three (3) buildings as well as finishing works for .
Some electromechanical works .


•***Construction of Electrical Substation at Samtah city - Jazan as Sub-Contractor from Al-Toukhy Co. :
1-Construction of concrete footings for huge generator sets at Samtah city sub-station, and Coordination and monitoring the day to day activities of sub-contractor and the Swidish consulting office .
2- Preparing Invoices, Material submittals of subcontractors .

•***Supervision the project of maintenance of sewage pipelines and WCS for the National Guard Compound at Dammam city .

•***Studying and pricing of the federal tenders for the Establishment.

Site Manager at AL _ JANAH AL _ TADAMNIA Co. for Trading
  • Saudi Arabia
  • April 1984 to March 1986

Executing of Qunfoudah City Water Flow net and Main pipelines of length 25 Km.
•Construction and Restoration of many Villas at Riyadh Area

Consultant at Farid Hanna Consulting
  • Egypt
  • December 1981 to September 1983

Supervision of the construction of :
Ice Factories and Cold Stores in some Egyptian Cities :
\{ Beni-Suief ice factory, Menia ice factory, Kom-Ombo ice factory, Aswan cold store, Al-Toor in Sinai ice factory and cold store, Pyramids Street cold store at Giza city, and Zaghazik ice factory \} Owned to Gerco for Cooling.& Engineering co. and each ice factory or cold store consists of the followings :
•Ice Factory or cold store :
Consists of the following works :

-concrete Structural Works (concrete footings and skeleton or Steel trusses and fixation of Cranes)
-Finishing (Internal and external finishing, Gates, Windows and Roof insulation items as well as Wall thermal Insulation ...etc.)
-Electromechanical (Machine House, Control Panels, electric Panels.)
-Equipment's Civil Works( Concrete machine`s Footings .)
•Office Buildings complete construction.
•Visitors Buildings complete construction
•Workers Accommodation complete construction.
•Generator Houses complete construction.
•Septic Tanks.
•Ground water Tanks.
•Boundary walls, Fence and landscape.

Site Engineer at Comag co
  • Egypt
  • April 1981 to November 1981
Site Engineer at Mohamed Abd El - Aziz Al- Haiatmy Engineering
  • Egypt
  • November 1979 to March 1981

Construction of Rail Way Station building and sheds in Beni Suief City- EGYPT :
The construction of the concrete footings, concrete skeleton, and finishing works for the railway station which Consists of the main building, hall of the railway station, tickets room, offices, and sheds for the passengers .

•Construction of workers residential building in Beni - Suief.
The construction of the concrete skeleton with footings for the building of the railway officer`s families, and each building consist of 6 floors .

at King
  • United Arab Emirates
  • to

st. main waste water pipeline -

at construction the Main Sewage Line of Al-kharj
  • Saudi Arabia
  • to

Construction of five sewage pump stations, each consists of :
1-Machine building, ( footings, concrete skeleton and finishing works )
2- Generator sets house ( footings, concrete skeleton, and finishing works )
3- Electric panels and Control room ( footings, concrete skeleton, and finishing works )
4-Main pumping waste water pipeline from sump ( deep well ) .

Construction and Maintenance of private villas in Riyadh region :
6- Construction of four (4 ) private villas in Riyadh, each villa concrete footings, concrete skeleton, and finishing works .

Education

Master's degree, الهندسة المدنية
  • at Los Angles
  • December 2022

مشاريع خطوط ناقلة و شبكات مياه و مشاريع خطوط رئيسية و شبكات صرف صحي و مشاريع انابيب و قنوات صندوقية و مصارف لدرء أخطار السيول و اسفلت و أعمال ترابية و خرسانية متنوعة

Bachelor's degree, Civil Eengineering
  • at Alexandria University
  • November 1979

Specialties & Skills

BUDGETING
CONSULTING
MATERIALS MANAGEMENT
MICROSOFT OFFICE
MICROSOFT WINDOWS
MICROSOFT WINDOWS 2000
MICROSOFT WORKS
PRICING
SUPERVISORY SKILLS
TRANSMISSION

Languages

Arabic
Expert
English
Expert

Memberships

SAUDI ENGINEERING COUNCIL
  • MEMBER
  • July 2011
EGYPTIAN ENGINEERING SYNDICATE
  • MEMBER
  • December 1979

Training and Certifications

MANY CERTIFICATES I GOT THROUGH MY BUSINESS ENGINEERING LIFE (Certificate)
MANY CERTIFICATES I GOT THROUGH MY BUSINESS ENGINEERING LIFE (Certificate)
MANY CERTIFICATES I GOT THROUGH MY BUSINESS ENGINEERING LIFE (Certificate)
MANY CERTIFICATES I GOT THROUGH MY BUSINESS ENGINEERING LIFE (Certificate)
MANY CERTIFICATES I GOT THROUGH MY BUSINESS ENGINEERING LIFE (Certificate)
MANY CERTIFICATES I GOT THROUGH MY BUSINESS ENGINEERING LIFE (Certificate)
MANY CERTIFICATES I GOT THROUGH MY BUSINESS ENGINEERING LIFE (Certificate)
MANY CERTIFICATES I GOT THROUGH MY BUSINESS ENGINEERING LIFE (Certificate)
MANY CERTIFICATES I GOT THROUGH MY BUSINESS ENGINEERING LIFE (Certificate)
MANY CERTIFICATES I GOT THROUGH MY BUSINESS ENGINEERING LIFE (Certificate)

Hobbies

  • Chess
    SOMETIMES I LIKE TO PLAY CHESS