Emilio Mason, Chief Engineer

Emilio Mason

Chief Engineer

Japan Transportation Consultants under Nippon Koie Consortium

Location
Philippines
Education
Bachelor's degree, Civil Engineering
Experience
38 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :38 years, 10 Months

Chief Engineer at Japan Transportation Consultants under Nippon Koie Consortium
  • India
  • My current job since December 2014

Work for the Engineer as consultant. Supervise the implementation of quality system for civil, electrical, mechanical and trackworks within the project. Conduct External audit, performs quality meeting. conduct Contractor- Consultant quality coordination, materials and works inspection reviews, supplier/manufacturer inspection. Review of quality documents from contractors, method statements, test results and quality monitoring. Conduct monthly review of quality staffs and their assignments. NCR monitoring. Prepare month quality project report. Represents the consortium in Joints the monthly progress meeting (quality issues) conducted by the Employer.

•Location: Riyadh, Kingdom of Saudi Arabia
•Project: Riyadh Metro Project Phase 1 &2, Railway Project

Lead Engineer at Bechtel-Almabani CCC Siemens Consortium
  • February 2014 to November 2014

Work for the General Contractor. Act as the focal point for all site quality activities and maintain close liaison with the Owner and/or the appointed agencies. Provides technical assistance to site management as necessary to initiate quality enhancement and resolve quality problems throughout the organization. Monitor, provide technical assistance and resolve all quality-related problems with the activities of subcontractors and company internal works. Plan and implement the quality training programs at site. Establish inspection procedures in accordance with contractual requirements an Inspection & Test Plan (ITP) indicating the extent of inspection based on item criticality. Ensure that adequate inspection personnel and test tool & equipment resources are available at all times, including peak load periods to meet the construction schedule. Raise Condition reports, non-conformance items, investigate their causes and make recommendations for corrective actions to prevent recurrence. Ensure all technical documentation is accurate and updated to current status. Conduct the education/training for quality consciousness to each subcontractor prior to the commencement of work. Give quality staffs the instruction about duties and responsibilities on site. Supervise quality staffs’ activities, functions and operations so that they are taken in accordance with the specified requirements and the approved procedures. Sub-contractor prior to the commencement of work. Give his staffs the instruction about duties and responsibilities on site. Supervise his staffs’ activities, functions and operations so that they are taken in accordance with the specified requirements and the approved procedures.

•Location: Riyadh, Kingdom of Saudi Arabia
•Project: Ministry of Interior Housing Project.

Production Manager
  • November 2012 to October 2013

Architectural and structural precast)
•Company: Al Ayuni, Al Omaier, China Civil Engineer Construction Consortium
•Duties and responsibilities:
Manage the whole production team to produce at least 220 pcs of complete housing panels per day. Provide solution(s) to problems arising from the whole production phase. Manage planning, design and delivery of the required materials in production. Determine the most effective production methodology. Coordinate all on-factory activities. Maintain production schedule and production reports. Assists in schedule controls throughout the project as appropriate. Track and control cost against project budget to avoid over runs. Coordinate with Senior Manager from time to time regarding production requirement updates and periodical of accomplishment of production. Conduct factory visits and inspections for on-factory fabrications and activities. Leads production section for complying on all approved procedures as per QMS application. Coordinate with the client, design team and all parties concerned in the production. Assures continuous management of all works to expedite the desirable completion of the project in accordance with plans and specification. Check Actual accomplishment report prepared by QS Engineer for billing purposes. Ensure that all safety rules are strictly implemented at site, including the day to day housekeeping and sanitation implementation. Conduct regular coordination meeting among the production Engineers to assess the status of each production and to recommend remedial measures. Make daily walk thru inspection of different activities and take note all the important matters that would help towards proper implementation of the project.

•Location: Riyadh to Hail, Kingdom of Saudi Arabia
•Project: Saudi Arabian Railway, CTW 400, North South Railway Project

Manager at Red and Green Line
  • United Arab Emirates
  • February 2010 to November 2012

Al Ayuni, Al Omaier, China Civil Engineer Construction Consortium
•Duties and responsibilities:
Work for the General Contractor. Act as the focal point for all site quality activities and maintain close liaison with the Owner and/or the appointed agencies. Provides technical assistance to site management as necessary to initiate quality enhancement and resolve quality problems throughout the organization. Monitor, provide technical assistance and resolve all quality-related problems with the activities of subcontractors and company internal works. Plan and implement the quality training programs at site. Establish inspection procedures in accordance with contractual requirements an Inspection & Test Plan (ITP) indicating the extent of inspection based on item criticality. Ensure that adequate inspection personnel and test tool & equipment resources are available at all times, including peak load periods to meet the construction schedule. Raise Condition reports, non-conformance items, investigate their causes and make recommendations for corrective actions to prevent recurrence. Ensure all technical documentation is accurate and updated to current status. Conduct the education/training for quality consciousness to each subcontractor prior to the commencement of work. Give quality staffs the instruction about duties and responsibilities on site. Supervise quality staffs’ activities, functions and operations so that they are taken in accordance with the specified requirements and the approved procedures. Sub-contractor prior to the commencement of work. Give his staffs the instruction about duties and responsibilities on site. Supervise his staffs’ activities, functions and operations so that they are taken in accordance with the specified requirements and the approved procedures.

Chief Engineer at Japan –Turkey Joint venture
  • December 2005 to December 2009

Duties and responsibilities:
As chief quality control engineer, my duties and responsibilities are to implement the QA/QC management system at site, coordinate with quality inspections with all the site sub contractors and vendors. Coordinate all non-destructive testing on site, coordinate with the customer’s representative on all quality matters. Coordinate all receipt inspections; distribute relevant QA/QC documentation to site subcontractors. Verify that the quality related site activities are in accordance with the applicable codes and standards, participate in the site internal and external site audit. Coordinate all the quality site inspections through the site QC inspectors, ensure all quality control documentation is complied and competed for as-built hand over through the QC turnover engineer. Control all non-conformance reports and undertake remedial action, complete site quality control instructions and action remedial responses. Review the customer’s specification and undertake relevant training to the site QC inspector, monitor the implementation of the approved site QC Plan. Complete and coordinate the approval of the sites QC technical submittals to the customer. Coordinate with the site construction manager on all quality issues. Coordinate and chair the QA/QC site weekly meetings with the projects subcontractors QC personnel, elaborating inspection and test programs. Ensure the safety is adhered to at site. Assure all technical documents relative to site quality control are in current status. Supervision and Implementation of project specification and governing standard adopted for the project to ensure product quality and acceptance by the owner. Supervision on inspection of all materials before acceptance for project use to ensure proper adherence to adopted standard. Supervision QC engineers to ensure implementation of quality workmanship so that the work is in accordance with specification.

•Location: Taiwan, Republic of China
•Project: Kaohsiung Rapid Transit Metro project

Superintendent at Chan Chun Construction Corporation
  • April 2005 to November 2005

As quality control superintendent, the duties and responsibly are as follows. Implementation of project specification and governing standard adopted for the project to ensure product quality and acceptance by the owner. Inspect all materials before acceptance for project use to ensure proper adherence to adopted standard. Ensure quality workmanship so that the work is in accordance to acceptable working standard and methodology. Review material testing results from laboratory or testing company and keep a file to support future documentation. To require testing on alternative materials to ensure that it is in accordance with the requirements. Preparation of quality control activities and assignments on site to be submitted to QA/QC manager. Preparation of all quality control notices for implementation (site instruction, non conformance and deficiency notices). Preparation of quality control documents.

•Location: Taiwan, Republic of China
•Project: Taiwan High Speed Rail Project, T230 package

Quality Control Engineer at Chun Wu Construction Company, Taiwan Ltd
  • September 2004 to April 2005
Quality engineer
  • February 2003 to August 2004

I am responsible for the Implementation of project quality system, specification and governing standard adopted for the project to ensure product quality and acceptance by the owner. Inspect all materials before acceptance for project use to ensure proper adherence to adopted standard. Ensure quality workmanship so that the work is in accordance to acceptable working standard and methodology. Review material testing results from laboratory or testing company and keep a file to support future documentation. To require testing on alternative materials to ensure that it is in accordance with the requirements. Preparation of quality control activities and assignments on site to be submitted to QA/QC manager. Preparation of all quality control notices for implementation (site instruction, non-conformance and deficiency notices). Preparation of quality control documents.
•Location: Taiwan, Republic of China
•Project: Taiwan High Speed Rail Project, C240 package

Supervisor
  • Philippines
  • February 2000 to March 2002

Company: Raytheon Evasco Overseas ltd. U.S.A.
•Duties and responsibilities:
Duties and respon The employer, a USA based construction company is the general contractor for the construction of San Roque Dam project. As a quality control supervisor, I am responsible in the Implementation of project specification and governing standard adopted for the project to ensure product quality and acceptance by the owner. Inspect all materials before acceptance for project use to ensure proper adherence to adopted standard. Ensure quality workmanship so that the work is in accordance to acceptable working standard and methodology. Review material testing results from laboratory or testing company and keep a file to support future documentation. To require testing on alternative materials to ensure that it is in accordance with the requirements. Preparation of quality control activities on site to be submitted to QA/QC manager. Preparation of all quality control notices for implementation (site instruction, non-conformance and deficiency notices). Preparation of quality control documents. Conduct punch listing prior to final repair works. Preparation of turn over documents to the owner.

•Location: Metro Manila, Philippines
•Project: Light rail transit, line 2 Project

Construction manager at Hanjin Engineering and Construction Co. Ltd
  • January 1998 to January 2000

As construction manager, I am responsible in assisting the management in the preparation of proposed work plan and methodology, Responsible for verifying all necessary requirement prior to execution of construction. Require daily accomplishment report(s) on all Project-In-Charge. Provide solution(s) to problems arising from the whole construction phase. Manage planning, design and delivery of the required materials in project. Determine the most effective const. methodology Coordinate all onsite activities. Maintain project schedule and field reports. Assists in schedule controls throughout the project as appropriate. Track and control cost again project budget to avoid over runs. Coordinate with Senior Manager from time to time regarding project requirement updates and periodical of accomplishment of projects. Conduct Site visits and inspections for on-site fabrications and activities. Lead Construction Division for complying all approved procedures as per QMS application. Responsible for the Administration of project - External. Coordinate with the client, design team and all parties concerned in the project. Continuous management of all works to expedite the desirable completion of the project in accordance with plans and specification. Check Actual accomplishment report prepared by QS Engineer for billing purposes. Ensure that all safety rules are strictly implemented at site, including the day to day housekeeping and sanitation. Conduct regular coordination meeting among the Site Engineers to assess the status of each project and to recommend remedial measures. Make daily walk thru inspection of different activities.

•Location: Metro Manila, Philippines
•Project: 2-25 storey Sto. Domingo tower and 37 storey Astoria plaza tower.

Project Manager at William Golangco Construction Corporation
  • October 1995 to December 1997
Sr. QA/QC Engineer at Ministry Of Defence and Aviation
  • July 1990 to August 1994
Civil Engineer at Ministry of Defence and Aviation
  • November 1987 to February 1990

Duties and responsibilities:
As sr. Quality control engineer, I am responsible for the implementation of project specification and governing standard adopted for the project to ensure product quality and acceptance by the owner. Inspect all materials before acceptance for project use to ensure proper adherence to adopted standard. Ensure quality workmanship so that the work is in accordance to acceptable working standard and methodology. Review material testing results from laboratory or testing company and keep a file to support future documentation. To require testing on alternative materials to ensure that it is in accordance with the requirements. Preparation of quality control activities on site to be submitted to QA/QC manager. Preparation of all quality control notices for implementation ( site instruction, non conformance and deficiency notices). Preparation of quality control documents.

•Location: Dharan, Kingdom of Saudi Arabia
•Project: King Abdul Aziz airbase and Dharan international airport operation and maintenance.

Project Engineer at L.M. Power Engineering corporation/Japan Radio Company JV
  • February 1985 to November 1987

The company, a general contractor and in joint venture with Japan radio Company for the construction of flood forecasting for Angat Dam and Pantabangan Dam. As Project engineer, my responsibilities are to supervise ongoing construction to ensure work efficiency, product quality, and proper utilization of manpower, equipment and materials. Implement project schedule, plans, specification, and quality control to ensure strict compliance to actual work.. Asses daily accomplishment and monitor all daily work activities, material and equipment usage. Perform quantity surveying works for company monthly report and for subcontractors billing. Assist the project manager in establishing proper monitoring of work that will supplement the construction schedule. Evaluates manpower and equipment efficiency to ensure project completion as per schedule. Prepares daily manpower assignment and target accomplishment to ensure smooth and well coordinated work sequence and good productivity. Implement safety programs at the worksite

•Location: Philippines

Project Engineer at L.M. Power Engineering corporation/Japan Radio Company JV
  • February 1985 to November 1987

The company, a general contractor and in joint venture with Japan radio Company for the construction of flood forecasting for Angat Dam and Pantabangan Dam. As Project engineer, my responsibilities are to supervise ongoing construction to ensure work efficiency, product quality, and proper utilization of manpower, equipment and materials. Implement project schedule, plans, specification, and quality control to ensure strict compliance to actual work.. Asses daily accomplishment and monitor all daily work activities, material and equipment usage. Perform quantity surveying works for company monthly report and for subcontractors billing. Assist the project manager in establishing proper monitoring of work that will supplement the construction schedule. Evaluates manpower and equipment efficiency to ensure project completion as per schedule. Prepares daily manpower assignment and target accomplishment to ensure smooth and well coordinated work sequence and good productivity. Implement safety programs at the work site

•Location: Saudi Arabia

Estimator at Saudi Services and Operating Co. Ltd
  • July 1982 to August 1984

Duties and resposibilities:
The employer, Saudi services and operating Company Ltd, is an operation maintenance general contractor for the Royal Saudi Air force base and DHARAN international airport. As estimator, I am responsible for the preparation of bill of quantities for the proposed project inside the base. Inspect project for proper assessment to support the bill of quantities prepared for to construction. Prepares material pricing list for reference from time to time. Monitor materials usage so that it will conform to the construction estimate

•Location: Philippines
•Project: Cement factory Expansion plant line 2 project.

Field Engineer at Northern Cement Corporation
  • Philippines
  • July 1982 to August 1984

Duties and resposibilities:
The company, a cement manufacturing had expanded its plant into a 240, 000 bags daily production by constructing its second plant expansion. As field engineer, I am responsible for supervising the ongoing construction to ensure work efficiency, product quality, and proper utilization of manpower, equipment and materials. Implement project schedule, plans, specification, and quality control to ensure strict compliance to actual work. Asses daily accomplishment and monitor all daily work activities, material and equipment usage. Perform quantity surveying works for company monthly report and for subcontractors billing. Assist the project manager in establishing proper monitoring of work that will supplement the construction schedule. Evaluates manpower and equipment efficiency to ensure project completion as per schedule. Prepares daily manpower assignment and target accomplishment to ensure smooth and well coordinated work sequence and good productive. Implement safety programs at the worksite.

Education

Bachelor's degree, Civil Engineering
  • at Baguio Colleges Foundation
  • March 1980

structural design software) training, Dubai, UAE •Attended seminars on permanent way safety, TECOM and CRO training, Taiwan High Speed Rail and Kaohsiung Rapid Transit trackwork project and Dubai Metro project, Taiwan, and Dubai Metro project, UAE. •Well verse in MS programs Excel, Word, Visio, Power point, Publisher •Recipient of the “ Pre-stressed concrete award for The Engineer ( Nippon Koie Consortium ) given by the India Concrete Institute,

Specialties & Skills

Quality Assurance
Projectors
BILLING
BUDGETING
CUSTOMER RELATIONS
DELIVERY
DOCUMENTATION
ENGINEERING
INSTRUCTION
MATERIALS MANAGEMENT
MICROSOFT WORKS
PERSONNEL

Training and Certifications

B.S. Civil Engineering (Certificate)
Date Attended:
March 1980

Hobbies

  • playing table tennis, reading, chess
    Recipient of ICI ( (Indian Concrete Institute) award for pre stressed concrete 2017.