enrique espadero, ELECTRICAL FOREMAN

enrique espadero

ELECTRICAL FOREMAN

SK ENGINEERING & CONSTRUCTION

Location
United Arab Emirates - Sharjah
Education
Diploma, Practical electricity
Experience
31 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :31 years, 0 Months

ELECTRICAL FOREMAN at SK ENGINEERING & CONSTRUCTION
  • United Arab Emirates
  • January 2011 to September 2013

Position: ELECTRICAL FOREMAN SK ENGINEERING & CONSTRUCTION, Abu Dhabi
January 11, 2011 - Sept. 21, 2013
Duties and Responsibilities: ➢ Monitoring electrical works and daily activities.
➢ Specialized in high voltage supervision. Installation of cable tray and support cable pulling.
➢ HV., MV., LV., cable laying and dressing arrangement. Glancing and Termination.
➢ Installation Switch Gear Supervisory on Panel Board LP. ELP.PDB. as per drawn details.
➢ Electrical/Construction Works Monitor Works Progress and Materials Requirements: ➢ Prepares Work Schedule and Plan Activities: Provides Reports on Men-Hour and Daily
➢ Progress to the Construction Manger, Monitor / supervising of all electrical works.

high voltage foreman at sk engineering
  • United Arab Emirates - Abu Dhabi
  • January 2011 to September 2013

Cable pulling, installation of cable tray and cable ladder type, installation of switchgear and alignment. Installation of panel board, transformer installation, cable dressing, glancing and termination of HV cable and MV and lv cable.
Cable testing, meagering and hi pot HV and MV cables.

HV/ELECTRICAL FOREMAN at POWER ACTION GULF
  • France
  • August 2009 to May 2010

Position: HV/ELECTRICAL FOREMAN POWER ACTION GULF, Doha Qatar
August 26, 2009 - May, 01, 2010
Duties and Responsibilities: ➢ Electrical/Construction Works Monitor Works Progress and Materials Requirements: Prepares Work Schedule and Plan Activities: Report; Man.
➢ Hours and Daily Progress to the Construction Manger, Monitor / supervising of all electrical works: Installation for termination.MV / cable/ d cable/preparation and termination generator side. 500 kva, output 400 volts to DB Panel Installation ATS Panel automatic transfer switch.
➢ Termination power supply from Kahramaa / emergency supply to generator, merggering & loop checking. Handles 9 staffs.

FOREMAN at KENTECH INTERNATIONAL LTD
  • United Arab Emirates
  • February 2008 to February 2009

Position: HVTERMINATOR/FOREMAN KENTECH INTERNATIONAL LTD, Abu Dhabi, U.A.E
Feb. 21, 2008- Feb. 21, 2009
Duties and Responsibilities: ➢ Responsible For Directly /Supervising/Monitor/Electrical/Construction Works Monitor Works Progress and
Materials Requirements: Prepares Work Schedule and Plan Activities: Report; Man. Hours and Daily
Progress to the Construction Manger, Monitor/supervising of all Electrical works: Installation for termination.MV/ and HVCABLE: loop checking. LOW VOLTAGE/HIGH VOLTAGE: cable 6.6 kv 36 kv
installation/Euro mold kits and Raychem kits and, Termination power supply from switch gear 220 kv step down Transformer 36 kv using fisteller kits. Handles 20 staff.

HIGH VOLTAGE CABLE SPLICER/TERMINATOR at UTS KENT COMPANY LTD., LLC
  • United Arab Emirates
  • November 2006 to September 2007

Position: HIGH VOLTAGE CABLE SPLICER/TERMINATOR UTS KENT COMPANY LTD., LLC, Abu Dhabi, UAE
Nov. 5, 2006- Sept. 11, 2007 Project: OGD III Oil Refinery, Gasco Plant, Abu Dhabi, UAE

Duties and Responsibilities: ➢ Responsible in the proper termination and splicing of the following MV cables:
1. New Jeddah cable size 3C x 240mm2 + 120mm2 Gnd rated 12/20kV/CU/XLPE/PVC splice to Old existing Anaconda cable size 3C x 500MCM type MV90/15kV using Raychem ESIJ-4X/3C240-300/SA&NA Inline Joint up to 17.5kV and install termination kit Raychem EPKT-17C3XIH2 Indoor Switchgear side and Elastimold Deadbreak Elbows K655BLR rated 15kV/600A in Pad-mounted Transformer side.
2. New Jeddah cable size 3C x 185mm2 + 70mm2 Gnd rated 12/20kV/CU/XLPE/PVC splice to Old existing Anaconda cable size 3C x 350MCM type MV/15kV using Raychem ESIJ-4X/3C120-185/NA Inline Joint up to 17.5kV and install termination kit Raychem EPKT-17C3XIH2 indoor termination up to 17.5kV in Indoor Switchgear side and Elastimold Deadbreak Elbows K655BLR rated 15kV/600A in Pad-mounted Transformer side.
3. DC Hi-pot testing of New MV Cables applying 64kV for 12/20kV as per Saudi ARAMCO Standard before splicing to Old existing MV Cables using DC Hi-pot tester "Biddle" 120k.
4. Megger testing of applying 5kV as per Saudi ARAMCO Standard to old and new MV cables after splicing.
5. Torque tightening as per Switchgear Manufacturer's torque values and on Transformer side as per Saudi ARAMCO Standard prior for energization.

HIGH VOLTAGE CABLE SPLICER/TERMINATOR at MOHAMMED BIN GARBO COMPANY, LTD
  • Saudi Arabia - Abha
  • March 2005 to June 2006

Position: HIGH VOLTAGE CABLE SPLICER/TERMINATOR MOHAMMED BIN GARBO COMPANY, LTD.
March 23, 2005- June 14, 2006 Project: Sub-Contractor Sceco

Duties and Responsibilities: ➢ Responsible in the proper termination and splicing of the following MV cables:
1. New Jeddah cable size 3C x 240mm2 + 120mm2 Gnd rated 12/20kV/CU/XLPE/PVC splice to Old existing Anaconda cable size 3C x 500MCM type MV90/15kV using Raychem ESIJ- 4X/3C240-300/SA&NA Inline Joint up to 17.5kV and install termination kit Raychem EPKT-17C3XIH2 Indoor Switchgear side and Elastimold Deadbreak Elbows K655BLR rated 15kV/600A in Pad-mounted Transformer side.
2. New Jeddah cable size 3C x 185mm2 + 70mm2 Gnd rated 12/20kV/CU/XLPE/PVC splice to Old existing Anaconda cable size 3C x 350MCM type MV90/15kV using Raychem ESIJ-4X/3C120-185/NA Inline Joint up to 17.5kV and install termination kit Raychem EPKT-17C3XIH2 indoor termination up to 17.5kV in Indoor Switchgear side and Elastimold Deadbreak Elbows K655BLR rated 15kV/600A in Pad- mounted Transformer side.
3. New Jeddah cable size 3-1C x 400mm2 rated 12/20kV/CU/ XLPE/PVC splice to Old existing Anaconda cable size 3C x 750MCM type MV90/15kV using Raychem ESIJ-4X/1C- 400-630/NA Inline Joint up to 17.5kV and install termination kit Raychem EPKT-17D1X1 indoor termination up to 17.5kV in Indoor Switchgear side and Elastimold Deadbreak Elbows K655BLR rated 15kV/600A in Pad-mounted Transformer side.

HIGH VOLTAGE CABLE SPLICER at S.A. KENT CO., LTD
  • Saudi Arabia - Jubail
  • November 1998 to June 2004

Position: HIGH VOLTAGE CABLE SPLICER S.A. KENT CO., LTD., K.S.A.
Nov. 24, 1998-June 08, 2004 Project: Saudi ARAMCO Shedgum Gas Plant

Duties and Responsibilities: ➢ Responsible in the proper termination and splicing of the following MV cables:
1. New Jeddah cable size 3C x 240mm2 + 120mm2 Gnd rated 12/20kV/CU/XLPE/PVC splice to Old existing Anaconda cable size 3C x 500MCM type MV90/15kV using Raychem ESIJ-4X/3C240-300/SA&NA Inline Joint up to 17.5kV and install termination kit Raychem EPKT-17C3XIH2 Indoor Switchgear side and Elastimold Deadbreak Elbows K655BLR rated 15kV/600A in Pad-mounted Transformer side.

2. New Jeddah cable size 3C x 185mm2 + 70mm2 Gnd rated 12/20kV/CU/XLPE/PVC splice to Old existing Anaconda cable size 3C x 350MCM type MV90/15kV using Raychem ESIJ-4X/3C120-185/NA Inline Joint up to 17.5kV and install termination kit Raychem EPKT-17C3XIH2 indoor termination up to 17.5kV in Indoor Switchgear side and Elastimold Deadbreak Elbows K655BLR rated 15kV/600A in Pad-mounted Transformer side.
3. New Jeddah cable size 3-1C x 400mm2 rated 12/20kV/CU/ XLPE/PVC splice to Old existing Anaconda cable size 3C x 750MCM type MV90/15kV using Raychem ESIJ-4X/1C-400-630/NA Inline Joint up to 17.5kV and install termination kit Raychem EPKT 17 D 1X1 indoor terminations up to 17.5kV in Indoor Switchgear side and Elastimold Dead break Elbows K655BLR rated 15kV/600A in Pad-mounted Transformer Side.
4. DC Hi-pot testing of New MV Cables applying 64kV for 12/20kV as per Saudi ARAMCO Standard before splicing to old existing MV Cables using DC Hi-pot tester "Biddle" 120kV.
5. Megger testing of applying 5kV as per Saudi ARAMCO Standard to old and new MV cables after splicing.
6. Torque tightening as per Switchgear Manufacturer's torque values and on Transformer side as per Saudi ARAMCO Standard prior for energization.

PLANT ELECTRICIAN MAINTENANCE at Crusher / Asphalt Plant
  • Saudi Arabia - Khamis Mushait
  • September 1997 to May 1998

Position: PLANT ELECTRICIAN MAINTENANCE AL- MOBTY FOR TRADING AND CONTRACTING, K.S.A.
Sept. 1997- May 12, 1998 Project: Crusher / Asphalt Plant

Duties and Responsibilities: ➢ Responsible in the proper installation of control panels for conveyor motors.
➢ Troubleshooting of electric motors and control panels in Crusher / Asphalt Plant.
➢ Replace defective motors, rewinding and replace defective bearings mostly on drive side of motors.

ELECTRICAL FOREMAN at SANTA MARIA POWER SYSTEM INC
  • Philippines
  • September 1996 to September 1997

Position: ELECTRICAL FOREMAN SANTA MARIA POWER SYSTEM INC, Philippines
Sept. 1996 to Sept. 1997 Project: Commercial and Industrial Projects
Duties and Responsibilities: ➢ Responsible in supervising electricians interpreting electrical drawings and instructs electricians the proper installation of electrical conduits, cable trays, cables, equipment and grounding system.

INSTRUMENT TECHNICIAN at DARWISH CHIYODA KEISO CO., LTD
  • Qatar
  • February 1995 to August 1996

Position: INSTRUMENT TECHNICIAN DARWISH CHIYODA KEISO CO., LTD.
February 1996-August 1996 Project: Raslaffan Qatar Gas LNG Plant

Duties and Responsibilities: ➢ Responsible for directly super supervising/supervise instrument/ electrical/ construction work.
Monitor work Progress and Material Requirements: Prepares work. Schedule and Plan Activities: Report Man/ Hours and daily Progress to the construction Manger: Monitor/supervising installation of all instruments Variable such as Pressure Indicator (PI), Temperature Transmitter: \{TT\} Pressure Differential Transmitter: \{PDT\} Pressure Transmitter: \{PT\} Pressure Transducer: \{ PY\} Flow Indicator: \{FI\} Temperature
Indicator: \{ TI\} Level Indicator: \{ LI\} Level Transmitter:\{LT\} and all Control Valve or Regulator.
➢ Responsible of Insulation testing, continuity check, loop checking and termination of instrument cables from instruments to instrument Junction boxes in process area to Central Control Building.

ELECTRICAL FOREMAN at R.R.N. ELECTRICAL SERVICES
  • Philippines
  • June 1994 to January 1995

Position: ELECTRICAL FOREMAN R.R.N. ELECTRICAL SERVICES, Philippines
June 1994 to January 1995 Project: AMKOR-ANAM Philippines Industrial Plant Installation

Duties and Responsibilities: ➢ Responsible in supervising 10 industrial electricians for the proper installation of electrical equipment, conduits, cable trays, power and control cables from substations to control rooms to electrical equipment.
➢ Responsible in interpreting electrical drawing layouts and connection diagrams and instructs electrician the proper installation and connections.

INDUSTRIAL ELECTRICIAN CLASS at UTS KENT CO. LTD
  • United Arab Emirates
  • April 1993 to May 1994

Position: INDUSTRIAL ELECTRICIAN CLASS A UTS KENT CO. LTD., Abu Dhabi U.A.E.
April 1993 to May 1994 Project: AL-AIN Power Plant Expansion

Duties and Responsibilities: ➢ Responsible in Insulation testing, continuity check, loop checking and termination of power, AC/DC control and instrument cables from substations to electrical equipment and from Central Control Building to Control/Instrument JB's to control devices/instruments in process area.

ELECTRICAL FOREMAN at R.R.N. ELECTRICAL SERVICES
  • Philippines
  • October 1991 to April 1993

Position: ELECTRICAL FOREMAN R.R.N. ELECTRICAL SERVICES, Philippines
October 1991- April 1993 Project: AMKOR-ANAM Philippines Industrial Plant Installation

Duties and Responsibilities: ➢ Responsible in supervising 10 industrial electricians for the proper installation of electrical equipment, conduits, cable trays, power and control cables from substations to control rooms to electrical equipment.
➢ Responsible in interpreting electrical drawing layouts and connection diagrams and instructs electrician the proper installation and connections.

LEAD MAN ELECTRICIAN at ELECTRICAL SERVICES, Philippines
  • Philippines
  • December 1987 to October 1991

Position: LEAD MAN ELECTRICIAN R.E.S. ELECTRICAL SERVICES, Philippines
December 1987 to October 1991 Project: AMD Philippines

Duties and Responsibilities: ➢ Responsible in interpreting electrical layout drawings and connection diagrams.
➢ Responsible in leading 4 electricians and the proper installation of electrical equipment, conduits, power and control cables from substation to electrical power room to electrical control room.
➢ Reports to the Electrical foreman and coordinates the works done.

ELECTRICAL FOREMAN at ECCO ASEA Cont. Co
  • Philippines
  • April 1986 to November 1987

Position: ELECTRICAL FOREMAN ECCO ASEA Cont. Co., Philippines
April 1986-November 1987 Project: Power Plant PNOC Expansion

Duties and Responsibilities: ➢ Responsible in supervising 20 industrial electricians for the proper installation of electrical equipment, conduits, cable trays, power and control cables from substations to control rooms to electrical.
➢ Responsible in interpreting electrical drawing layouts and connection diagrams and instructs electrician the proper installation and connections.

ELECTRICIAN at PACES Industrial Corporation
  • Philippines
  • March 1985 to February 1986

Position: ELECTRICIAN PACES Industrial Corporation
March 1985 to February 1986 Project: Commercial and Industrial Projects

Duties and Responsibilities: ➢ Install conduits, cable trays, power and control cables.

BUILDING ELECTRICIAN at ROMAGO ELECTRIC Co. Inc
  • Philippines
  • January 1984 to February 1985

Position: BUILDING ELECTRICIAN ROMAGO ELECTRIC Co. Inc., Philippines
January 1984 to February 1985 Project: 3 Storey Commercial Building

Duties and Responsibilities: ➢ Install rigid steel conduits, Rigid PVC schedule 40 conduits, and power cables.

ELECTRICAL GROUNDMAN TO LINEMAN at BECO Bulacan Electric Co
  • Philippines
  • October 1979 to October 1983

Position: ELECTRICAL GROUNDMAN TO LINEMAN BECO Bulacan Electric Co., Philippines
October 1979 to October 1983
Duties and Responsibilities: ➢ Responsible in the proper installation of Distribution Power Supply / Transformer Hang Oil type from 24kV step-down to 480V and 220V going to meter base in residential houses and commercial buildings.

Education

Diploma, Practical electricity
  • at Dumlao Technical Institute
  • March 1999

Specialties & Skills

Terminations
Facilities
Troubleshooting
Repairing
GAS PLANT
HI-POT TESTER
HIGH VOLTAGE
SPLICER
SPLICING
SUBSTATIONS
High Voltage splicer terminator, electrical troubleshoot,wiring installation
High Voltage splicer terminator, electrical troubleshoot,wiring installation

Languages

English
Intermediate

Training and Certifications

Splicer Certificate (Certificate)
Date Attended:
June 2001
Valid Until:
June 2001

Hobbies

  • watching movies and playing billiards