Ernesto IV Oliquiano, Senior Interior Design Architect

Ernesto IV Oliquiano

Senior Interior Design Architect

U+A Architects

البلد
الإمارات العربية المتحدة - دبي
التعليم
بكالوريوس, Architecture and Urban Planning
الخبرات
24 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :24 years, 3 أشهر

Senior Interior Design Architect في U+A Architects
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ مارس 2016

The role primarily site based and included the review of shop drawings and material submittals by the fit-out contractor, general coordination between Client & Stakeholders, the main contractor and sub-contractors, consultancy and supervision of the project, and ensuring Interior Design elements are reviewed and properly executed on the site. The Al Habtoor Polo Ranch - St. Regis Hotel consists of a 3-storey, 126-room hotel and 26 Luxury 2-storey Villas situated in Dubailand, adjacent to the Bypass Road (Emirates Road).
Expected date of completion on the last quarter of 2016.

Senior Design Coordinator في Damac Properties
  • الإمارات العربية المتحدة
  • مارس 2011 إلى يناير 2016

Primary role is to lead a group of design professionals to develop appropriate and correct design development documentation and coordinate all necessary documentation between Conceptual and project execution.

CAD Professional في dwp design worldwide partnership
  • الإمارات العربية المتحدة - دبي
  • مارس 2010 إلى مارس 2011

a.) Responsible for the preparation of CAD Documentation for projects.
b.) Prepare CAD Drawings including all necessary information required for design and documentation.
c.) Prepare drawing documentation after signing final design development by client
d.) Setup drawings using using office standard layering and object description.
e.) Maintain files accordingly and assist designers to develop details and cross check relevant documents.

Interior Design Manager في Clifton Interiors LLC
  • الإمارات العربية المتحدة - دبي
  • أبريل 2009 إلى مارس 2010

a.) Leads the studio to develop solutions for design and assume responsibility for all concept and development of designs.
b.) Preparation of documentation for tender and construction and plan and manage personnel and resources work flow.
c.) Manage cost control and personnel man-hours
d.) Reports directly to the General Manager & Owner
e.) train and supervise personnel and ensure working standards are upheld.

CAD Professional في LW Design Group
  • الإمارات العربية المتحدة
  • أبريل 2008 إلى فبراير 2009

a.) Responsible for the preparation of CAD Documentation for projects.
b.) Prepare CAD Drawings including all necessary information required for design and documentation.
c.) Prepare drawing documentation after signing final design development by client
d.) Setup drawings using using office standard layering and object description.
e.) Maintain files accordingly and assist designers to develop details and cross check relevant documents.

Senior Design Manager في V Roque Corporation
  • الفلبين
  • يناير 2008 إلى أبريل 2008

a.) Develops deisng concepts and prepare documentation for tenders and construction or for client approval.
b.) Assist with planning the project in terms of profitability and deliveries.
c.) Lead the project Team
d.) Prepare necessary documentation for client/corporate presentations and revise design bases from client input.
e.) Prepare specification and quantity take-off.
f.) Do all necessary coordination for design and construction.

Interior Design Manager في Dewan Design and Architecture
  • المملكة العربية السعودية - الرياض
  • أكتوبر 2004 إلى يناير 2008

a.) Leads the studio to develop solutions for design and assume responsibility for all concept and development of designs.
b.) Preparation of documentation for tender and construction and plan and manage personnel and resources work flow.
c.) Manage cost control and personnel man-hours
d.) Reports directly to the General Manager & Owner
e.) train and supervise personnel and ensure working standards are upheld.

Junior Design Professional في WV Coscolluela & Associates/Skidmore Owings & Merrill
  • الفلبين
  • يناير 2003 إلى أكتوبر 2004

a.) Responsible for the preparation of CAD Documentation for projects.
b.) Prepare CAD Drawings including all necessary information required for design and documentation.
c.) Prepare drawing documentation after signing final design development by client
d.) Setup drawings using using office standard layering and object description.
e.) Maintain files accordingly and assist designers to develop details and cross check relevant documents.

Project Coordinator في JG De Asis and Associates
  • الفلبين
  • يناير 2000 إلى ديسمبر 2003

a.) Reports directly to the Principal Architect.
b.) Sets milestones and monitors project progress using all necessary PM Softwares and makes critical decision and contingencies regarding project delivery and satisfying client requirements.
c.) Responsible for obtaining all relevant information, meets with the client, confirm working hours and site man hours for building construction.
d.) Prepares site CAD Drawings and Bill of Quantities for Variation costs for approval.

الخلفية التعليمية

بكالوريوس, Architecture and Urban Planning
  • في Technological Institute of the Philippines
  • مارس 2003

Best Thesis Deliberator - Design 10 Best Thesis - Tagbilaran City Floating International & Domestic Airport

Specialties & Skills

Architecture
Interior Design
AutoCAD
Residential Architecture
Interior Architecture
Interior Design
Photoshop
3D Studio Max
Architecture
Fit-out
Architectural Design
Construction
Construction Management
Design Development
Space Planning
Concept Design
Construction Documents
Residential
Illustrator
Renovation
Hospitality
Adobe Creative Suite
AutoCAD
SketchUp
Retail Design

اللغات

الانجليزية
متوسط
الفيلبينية
متمرّس

العضويات

United Architects of the Philippines
  • Member
  • October 2012
American Institute of Architects
  • International Associate
  • May 2014

التدريب و الشهادات

Certificate on Green Building Core Concepts & LEED Rating Systems (تدريب)
معهد التدريب:
Society of Engineers – Dubai, UAE
Project Management Professional (PMP) Certification (تدريب)
معهد التدريب:
Chicago Management Training Institute
تاريخ الدورة:
March 2013
Leadership in Energy & Environmental Design (LEED) (تدريب)
معهد التدريب:
Chicaco Management Training Institute
تاريخ الدورة:
March 2013

الهوايات

  • Photography
    2nd and 3rd Place Winner United Architects of the Philippines - Dubai Chapter Digital Photography Challenge - Night Photography