Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Erdem Summak, RAMS Manager / System Assurance Manager / Requirements Manager / Interface

Erdem Summak

RAMS Manager / System Assurance Manager / Requirements Manager / Interface·Aktor-Larsen&Toubro-Yapi Merkezi-STFA-Al Jaber Joint Venture

Qatar

Master's degree, Business Administration

Work experience

Total years of experience: 13 years, 7 months

RAMS Manager / System Assurance Manager / Requirements Manager / Interface

September 2016 - March 2020

Aktor-Larsen&Toubro-Yapi Merkezi-STFA-Al Jaber Joint Venture

Doha, Qatar

September 2016 - March 2020

• Doha Metro Goldline.D&B Contract
Client:Qatar Rail
PM Consultant: Egis
Designer: Aktor-Larsen&Toubro-Yapi Merkezi-STFA-Al Jaber
Contractor: Aktor-Larsen&Toubro-Yapi Merkezi-STFA-Al Jaber

˚ Successful and efficient Requirements / Hazard Management / Interface Management / Life Safety Management as a hardworking and team building member of the team.
˚ A successful demonstration of RAMS(Reliability, Availability & Maintainability & Safety) management, fully compliant to EN 50126 & EN 50128 & IEC 62279, acknowledged/approved by QR/PMC and ISA(independent safety assessor)
˚ Preparation and updates of SA Plans, such as System Assurance Plan, System Safety Plan, RAM Plan, Requirements Plan, Engineering Safety Validation Plan, EMC control plan etc.
˚ Outstanding V Model implementation and traceability from design to delivery as per EN 50126 / IEC 62278, by dynamic and productive use of Comply Pro, Requirements & Hazard Log & Control Measure & Assumptions modules.
˚ Coordinating with designers to identify system breakdown structure, LRU and LLRUs as an input for RAMS assessments.
˚ Performing Hazard Identification Workshops (Hazard Interface Hazard Analysis, Sub-Systems Hazard Analysis and Operations and Support Hazard Analysis) to identify hazards and their mitigations to address system functionality, system failure and safety integrity requirements. Hazard management by use of Hazard Log Module of Comply Pro.
˚ Reassessing Hazard Log with the latest configuration by performing design safety assessment and reperforming Hazard Identification workshops in every stage(preliminary design, detailed design, construction etc) of project till delivery.
˚ Self Performing and assisting others on RAM assesments such as MEP RAM Failure Data Report, Reliability Prediction and Modelling Report, Maintainability Task Analysis, FMECA, RAM Demonstration, Life Cycle Cost Analysis and RAM Modelling etc. Using item tool kit( Reliability Block Diagram RBD). Providing assistance to other team members.
˚ Performing Corrective and Preventative Maintenance Analysis to support O&M delivery team
˚ Self Performing System Safety Assesments such as Hazard Log Reports, Quantative Risk Analysis, SIL assessments(Safety Integrity Level), Safety Critical Item List, Fault Tree Analysises, Safety Audits, EMC Demonstration and Final Safety Case(closure documents for operational readiness, reviewed by Third Party employed by Qatar Rail) and other Safety cases(EMC) etc
˚ Review and redevelopment of design, plan and procedures for Life Safety Systems with safety point of view
˚ Fire Life Safety Layout Reviews and Revisions(DC1 and DC2 for QCDD submissions)
˚ Fire Life Safety Egress Route Visual Inspections prior to Independent Safety Assessor and QCD inspections
˚ Softwares: Item tool kit, Comply Pro etc
˚ This role requires an acute understanding of the civils, MEP, architectural and safety requirements to analyze the overall project from design to delivery.
˚ It also requires a very high understanding of the systems and procedures that govern how the project will be developed and delivered by each of the contributing parties.

Company industry:
Construction & Building
Job role:
Engineering

Client Representative Systems-MEP / Project Management Consultant

March 2013 - September 2016

ARUP

Istanbul, Türkiye

March 2013 - September 2016

• Ciftci Towers, 2 high rise buildings, in Zincirlikuyu, near Zorlu Center.
Client: Ciftciler Holding
PM Consultant&Designer: Arup
Contractor: Turkerler
˚ Successful and efficient Management/supervision of Contractor team.
˚ Successful and efficient Design, Construction and Project Management
˚ Successful and efficient Design management and implementations, managing design subcontractors, review of their submissions
˚ Cost Benefit Analysis
˚ Bidding supply and install contracts
˚ Review & updates of technical specs
˚ Review and redevelopment of plan and procedures for Life Safety and Hazard Management
˚ Fire Life Safety Layout Reviews and Revisions
˚ Fire Life Safety Egress Route Visual Inspections
˚ Assessments and implementation of new technologies for overall system sustainability, such as renewable energy assessments and implementation
˚ Maintainability assessments
˚ Seismic and vibration assessments and design implementation
˚ Systems(design to delivery)
- Operational, fully integrated Intelligent Building Automation System( integration of all local control systems, all third party integrations on different communication protocols)
- Operational HVAC control and monitoring (DDC ) integrated to BMS
- Operational Lighting automation systems (Dali) integrated to BMS.
- Operational LV MV distribution systems and energy management & billing system integrated to BMS
- Operational Fire Alarm System, CCTV and Public address system.
- Operational VHTS

Company industry:
Project & Construction Planning
Job role:
Consulting

MEP Construction Manager

February 2012 - March 2013

TAISEI CORPORATION

Istanbul, Türkiye

February 2012 - March 2013

• Marmaray Project BC1 Contract, includes 13 km x 2 track lines, 3 ventilation buildings, 3 underground stations, 1 ground station.
Client: TC Ulaştırma Bakanlığı DLH
Consultant: Avrasya Consult JV
Design & Build Contractor: TAISEI
Subcontractor : ANEL
Area In Charge: Uskudar Station, Ayrılıkcesme Ventilation Building, 5 km x 2 track tunnel(TBM), 2 km x 2 track Immersed Tube(Including sump pits)
˚ Successful and efficient Design Review and Verification
˚ Successful and efficient Management of Contractor team, Constuction and Project Management
˚ Fire Life Safety Layout Reviews and Egress Route Visual Inspections

Company industry:
Construction & Building
Job role:
Construction and Building

MEP Construction Manager – T&C Area Manager

December 2010 - February 2012

TAISEI - TAV Joint Venture

Doha, Qatar

December 2010 - February 2012

• The New Doha International Airport Project (NDIA), The complex includes the main passenger terminal and, three concourses, parking structures, a public mosque and plaza, a central utility plant, and access roadways. Multi-level terminal of approximately 650, 000 square meters; 41 fixed gates and 23 remote gates. Multiple VIP and airline premium lounges.
Client: NDIA Steering Committee
Consultant: OBI (Overseas Bechtel Incorporation)
Designer: HOK
Contractor: TAISEI - TAV Joint Venture

Construction

˚ Design Review and Verification
˚ Management/supervision of subcontractor team(over 1000 supervised by over 50 engineers)
˚ Construction Management
˚ Site execution & coordination as per method statements. Method statements review and update as per codes and standards, NEC, BS, EN, NFPA
˚ Precomissioning inspections of Systems such as Aircraft Docking System, Passenger Loading Bridges, Power Distribution Systems, BMS, Lighting Control, ULV systems etc (Concourse A & B & C)
˚ Support to design office to resolve pending design issues & details
˚ Fire Life Safety Layout Reviews and Egress Route Visual Inspections


T & C
˚ Leading a team of engineers and supervising subcontractor team, main terminal building and all concourses.
˚ Pre commissioning of HVAC, Conveying(BHS), VHTS(escalators, elevators, moving walkways), Passenger Loading Bridge, Aircraft Docking Guidance Systems, ULV Systems(BMS, CCTV, PA, FDAS, etc)
˚ Testing & Commissioning of Passenger Loading Bridge, ADS systems, FIDS, ULV systems
˚ NETA Certification
˚ All T&C procedures and tests been reviewed and revised as per NETA, STANDARD FOR ACCEPTANCE TESTING SPECIFICATIONS

Company industry:
Construction & Building
Job role:
Construction and Building

Senior Electrical Engineer (Design & Construction)

July 2008 - October 2010

Odebrecht- TAV- CCC Joint Venture

Tripoli, Libya

July 2008 - October 2010

• The New Tripoli International Airport, with 20 million passengers per year capacity & 32 fixed + 64 mobile boarding bridges, consisting of two terminal building, each 230.000 m².
Client: Libyan Civil Aviation Authority
Consultant & Designer: ADP-I
Contractor: Odebrecht- TAV- CCC Joint Venture
˚ Design management and implementations accordance to BS, EN, NFPA & Implementations & Coordination between other trades, managing design subcontractors, review of their submissions.
˚ Shop drawings, leading 3 electrical design engineer and supervising sub-contract team
˚ Material submittals & procurement planning for both self-performed & sub contractor scope of works
˚ Coordination with planning department for master schedule & detailed schedules, manpower charts(for both self performed & subcon).
˚ Method statements & inspection test planning (QCP&ITP&QWI).
˚ MV&LV&LC systems, site execution, inspection and QC.
˚ Mobilization design & executions(10 MVA).
˚ Managed the tasks within the provisions and guidelines of the Quality Assurance system.
• The New Tripoli International Airport, camp site; including total 5000 labor accommodation, water treatment & sewage systems, pump stations, 500 staff office areas, precast yard, concrete plant, power substations(7 MVA). The New Tripoli International Airport, supervisor camp; including total 400 supervisor accommodation, water treatment & sewage systems, pump stations, power substations(3 MVA).
˚ Design & Shop drawings accordance to BS, EN, NFPA. Material approval & procurement planning. Work schedules detailed, manpower charts. MV&LV&LC systems, site execution, inspection and QC.

Company industry:
Construction & Building
Job role:
Construction and Building

Senior Electrical Engineer

September 2007 - July 2008

Summa Libya

Tripoli, Libya

September 2007 - July 2008

• Quantity take off & BOQ & tender documentation & design implementations for business development(high rise office & hotel buildings, sizable carparks).
• The Al Tadamon Twin Towers in Tripoli, sizable office building with total cost of €80 million, which will have 51000 m² office area, 40 storey, 170 m high.
Client: Tadamon Investment Co Inc & Social Security Funds Investments, Libya(SSFI)
Consultant: Dar Al-Handasah
Contractor: Summa Construction Inc.
˚ Design review accordance to BS, EN, NFPA & Implementations & Coordination between other trades
˚ Shop drawings, leading an electrical design engineer and two draftsmen
˚ Material approval & procurement planning
˚ Work schedules master & detailed, manpower charts.
˚ Design Implementation of IP converged Network & BMS.
˚ Design Implementation of 20 MVA 30/11 kV substation & coordination with GECOL (Power. Distr. Company of Libya)
• The Al Mahary Radisson Sas Hotel in Tripoli, renovation project with total cost of €15 million, which has 350 guest rooms, 32000 m² total closed area.
Client: Social Security Funds Investments of Libya(SSFI)
Consultant: Radisson Blu (SAS)
Contractor: Summa Construction Inc.
Electrical Designer: Dogu Elektrik
˚ Electrical Design of MV&LV&LC systems accordance to BS, Radisson Specifications, NFPA & Coordination between other trades, leading two electrical design engineers and four draftsmen.
˚ Shop drawings, leading one electrical design engineer and two draftsmen.
˚ Material approval & procurement planning
˚ Work schedules master & detailed, manpower charts.
˚ Managed the tasks within the provisions and guidelines of the Quality Assurance system.

Company industry:
Construction & Building
Job role:
Construction and Building

Senior Electrical Engineer

September 2007 - July 2008

Summa Libya

Tripoli, Libya

September 2007 - July 2008

• Quantity take off & BOQ & tender documentation & design implementations for business development(high rise office & hotel buildings, sizable carparks).
• The Al Tadamon Twin Towers in Tripoli, sizable office building with total cost of €80 million, which will have 51000 m² office area, 40 storey, 170 m high.
Client: Tadamon Investment Co Inc & Social Security Funds Investments, Libya(SSFI)
Consultant: Dar Al-Handasah
Contractor: Summa Construction Inc.
˚ Design review accordance to BS, EN, NFPA & Implementations & Coordination between other trades
˚ Shop drawings, leading an electrical design engineer and two draftsmen
˚ Material approval & procurement planning
˚ Work schedules master & detailed, manpower charts.
˚ Design Implementation of IP converged Network & BMS.
˚ Design Implementation of 20 MVA 30/11 kV substation & coordination with GECOL (Power. Distr. Company of Libya)
• The Al Mahary Radisson Sas Hotel in Tripoli, renovation project with total cost of €15 million, which has 350 guest rooms, 32000 m² total closed area.
Client: Social Security Funds Investments of Libya(SSFI)
Consultant: Radisson Blu (SAS)
Contractor: Summa Construction Inc.
Electrical Designer: Dogu Elektrik
˚ Electrical Design of MV&LV&LC systems accordance to BS, Radisson Specifications, NFPA & Coordination between other trades, leading two electrical design engineers and four draftsmen.
˚ Shop drawings, leading one electrical design engineer and two draftsmen.
˚ Material approval & procurement planning
˚ Work schedules master & detailed, manpower charts.
˚ Managed the tasks within the provisions and guidelines of the Quality Assurance system.

Company industry:
Construction & Building
Job role:
Construction and Building

Senior Electrical Engineer

August 2006 - September 2007

Arjen Engineering Ltd

Azerbaijan

August 2006 - September 2007

• Quantity take off & BOQ & tender documentation & design implementations, for business development(high rise office & hotel buildings, residential buildings ).
• ISR Residence in Baku, a residential project with 8000 m² shop and parking lot area, 15000 m² residence area constructed at an expense of $18 million.
Client: ISR Holding Global Investment Co Inc
Contractor: Borova MMC Cons&Contr. Inc.
Electrical Sub-contractor: Arjen Elc. Contr.
Electrical Designer: Dogu Elektrik
˚ Design review accordance to Gost, Snip & Implementations & Coordination between other trades
˚ Design management and implementations accordance to Gost, Snip & Implementations & Coordination between other trades, managing design subcontractors, review of their submissions.
˚ Material approval & procurement planning
˚ Work schedules master & detailed, manpower charts.
˚ Responsible for the installation of electrical MV&LV&LC systems
˚ Managed the tasks within the provisions and guidelines of the Quality Assurance system.
• The Arash Hotel in Nahkcivan, design project, which will have 250 rooms, 25000 m² total closed area.
˚ Design of of electrical MV&LV&LC systems; MV Switchgear, LV Distribution, Lighting&Emergency lighting, Small power, Fire alarm, CCTV&Security, Public Adress.

Company industry:
Construction & Building
Job role:
Construction and Building

Senior Electrical Engineer

August 2006 - September 2007

Arjen Engineering Ltd

Azerbaijan

August 2006 - September 2007

• Quantity take off & BOQ & tender documentation & design implementations, for business development(high rise office & hotel buildings, residential buildings ).
• ISR Residence in Baku, a residential project with 8000 m² shop and parking lot area, 15000 m² residence area constructed at an expense of $18 million.
Client: ISR Holding Global Investment Co Inc
Contractor: Borova MMC Cons&Contr. Inc.
Electrical Sub-contractor: Arjen Elc. Contr.
Electrical Designer: Dogu Elektrik
˚ Design review accordance to Gost, Snip & Implementations & Coordination between other trades
˚ Design management and implementations accordance to Gost, Snip & Implementations & Coordination between other trades, managing design subcontractors, review of their submissions.
˚ Material approval & procurement planning
˚ Work schedules master & detailed, manpower charts.
˚ Responsible for the installation of electrical MV&LV&LC systems
˚ Managed the tasks within the provisions and guidelines of the Quality Assurance system.
• The Arash Hotel in Nahkcivan, design project, which will have 250 rooms, 25000 m² total closed area.
˚ Design of of electrical MV&LV&LC systems; MV Switchgear, LV Distribution, Lighting&Emergency lighting, Small power, Fire alarm, CCTV&Security, Public Adress.

Company industry:
Construction & Building
Job role:
Construction and Building

Education

Bogazici (Boshporus) University

July 2016

July 2016

Master's degree, Business Administration

Türkiye

Istanbul Technical University

December 2005

December 2005

Bachelor's degree, Electrical And Control Engineering

Türkiye

GPA (point): 2.02 out of 4

GPA (point): 2.02 out of 4