Eric Jess Capule, DLP Engineer

Eric Jess Capule

DLP Engineer

Trans Gulf Electro Mechanical LLC.

Location
United Arab Emirates - Dubai
Education
Bachelor's degree, Computer Engineering
Experience
9 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :9 years, 5 Months

DLP Engineer at Trans Gulf Electro Mechanical LLC.
  • United Arab Emirates - Dubai
  • July 2014 to December 2015

- Prepare and Update DLP reports everyday and Submit weekly to DLP coordinator.
- Attend monthly meeting with DLP coordinator to discuss more
- Liaising to the suppliers regarding the DLP issues in which supplier involved.
- Taking care of the whole DLP issues in site. Including Electrical, Mechanical and Plumbing.
- Liaising to the maintenance contractor regarding the DLP complained.
- Coordinate direct to higher subordinate when there is DLP major issues occurred.
- Planned accordingly for DLP daily work to achieve the target.
- Supervised the Technicians doing DLP work.
- Gave a quick solution of the problem when it is in need for minor issues only.

Junior Engineer - BMS at Trans Gulf Electro Mechanical LLC.
  • United Arab Emirates - Dubai
  • April 2012 to July 2014

- Review Specifications, Drawings, Design details BMS System.
- Ensuring Installation of BMS System with compliance. specifications and standards.
- Planning for daily activities for BMS team.
- Prepare Accomplishment report.
- Arranging of Manpower, Material and tools
- Preparation of Documentation for field works.
- Attend constructions meeting.
- Coordinate With MEP team on site.
- Coordinate with Consultant and BMS supplier to meet the projects requirements.
- Conduct Pre- Commissioning on site with BMS Supplier
- Review and check As-built drawings.
- Raise site inspection.
- Scheduling and coordinating work to tight deadlines.
- Investigating problems, diagnosing/repairing faults.
- Providing technical support & ensuring safe working conditions.

Commissioning Engineer at Honeywell International
  • Saudi Arabia - Riyadh
  • July 2010 to November 2011

- Designed EIB/KNX Network Layout, Riser Diagram and Single Line Diagram base on the Circuit details in a particular building as per ABB standards.
- Checked and Update the circuit details for the revision and some comments given by the contractor.
- Create Circuit details using Microsoft Excel application base on the circuit diagram on LRP, PP, ELP, ECB and LP connectivity and make estimation for the BOQ in a particular project.
- Create Physical Address by using the ETS3 software to the device during pre-commissioning.
- Conduct site survey on particular building to ensure the proper cabling and the position of Sensors base on Network Layout.
- Create MSSP circuit details base on the MSSP Schedule and Design MSSP base on the circuit details.
- Coordinate with the contractor and consultant for any comments and revision of the design of MSSP and Network Layout.
- Assist Site Engineer in the proper implementation and schedule of design detailing works.
- Create Mock-up in site for client approval
- Prepare and submit reports of jobs in progress.
- Perform other works assigned by immediate superior.

Site Engineer at Al Sharq Office Company
  • Saudi Arabia - Riyadh
  • June 2009 to July 2010

- Responsible for the safe, reliable and cost efficient operation and its components by consistent implementation of safety, quality and reliability of the systems.
- Testing & Commissioning of Instrumentation Devices Maintain Instrumentation and Control Attain competitiveness and customer satisfaction.
- Supervising on site with the Fiber Technician during testing and splicing to prevent repeated faults.
- Conduct Preliminary Acceptance Test on Fiber Optic using OTDR and OPTO power meter before hand over to client.
- Coordinate to the Control, MDF and Supervisors regarding the problem occurred on the site particularly change LI, New Port and Slot, Line Activation and No Browsing.
- Trouble shoot and repair DSL according to the customers complained.

Test Engineer at Wistron Corporation
  • Taiwan
  • April 2007 to December 2008

- Responsible in debugging program of new model for the following machines: Flying Probe machine (APT-8400CJ and APT7400CN and TRI ICT machine (TR-518FE/WIN software).
- Optimize test programs by reducing product test times and developing efficient testing methods.
- Decision making when Problem Occurs during Testing Process.
- Maintenance of TR-518FE (MDA Machine), Flying Probe machine, Agilent HP3070, ICT Genrad and Teradyne Machine.
- Create CAD file using FABMASTER and TEBO software for flying Probe Program.
- Responsible in maintaining ICT and ATE fixtures

Technical Engineer at Yujin Optical Electronics Inc.
  • Philippines
  • November 2005 to March 2007

- Responsible for the network in the production as well as the server, the printer and the entire PC used in the production.
- Conduct monthly preventive maintenance such as evaluation, correlation of spot skew, alignment and judgments machine to ensure its reliability and accuracy in testing.
- Provide adequate support of Technical Team during and after of production to prevent down time.
- Coordinate to the production Manager for the proper Maintenance and operation of the machine.
- Provide proper Training to all operators to avoid misused of the machine.

Education

Bachelor's degree, Computer Engineering
  • at La Salle University
  • March 2005

Specialties & Skills

Software Testing
Desktop Hardware
PC Networking
Building Automation
Building Management Systems
Microsoft Office (Word, Excel & Power Point)
Auto Cad
Hardware & Software Troubleshooting
ETS3 Software
Networking
Visual Basic Programming
Simulation Software (Circuit Maker & Electronic Workbench)
Building Management System

Languages

Filipino
Expert
English
Intermediate

Training and Certifications

Microsoft Certified Professional (MCP) (Training)
Training Institute:
ALTAJ International School
Date Attended:
May 2010
Duration:
24 hours
KNX Practical Training (Training)
Training Institute:
ABB Riyadh
Date Attended:
July 2010
Duration:
16 hours
Nova Icepta (Training)
Training Institute:
Saudi Telecom Company
Date Attended:
November 2009
Duration:
16 hours
Structured Cabling (Training)
Training Institute:
Brand-Rex Company
Date Attended:
March 2010
Duration:
8 hours
Cisco Certified Network Associate (CCNA) (Training)
Training Institute:
ALTAJ International School
Date Attended:
May 2010
Duration:
36 hours

Hobbies

  • Play Basketball, Billiard &Chess.Surfing the internet, Reading books about networking.
    During my College days I was a Chess champion in "Barkadahan Chess Tournament. Also a Chess champion during Foundation Day & a Second Place during Sports Fest. During my College days there was a dance competition in our school & our group was the Champion.