Construction Manager
Adnan Contracting
Total years of experience :19 years, 9 Months
1-April2014 up Date:- (UAE)
Working in Adnan contracting Company DUBAI-UAE
Projects:
1-Dr. Riad Al Jord Hospital
Project Description:-
Hospital Building consists of 3Basement, Ground Floor, Mezz. Floor, 5 Typical Floors and Roof
Contract Value: 60 Million Dirham.
Project's Parts :
Client: Dr. Riad Al Jord .
Health Care Consultant: Hosmac perfecting Health Care Consultant.
Main Contractor: Adnan Contracting Company.
Local Consultant: Design Centre Engineering Consultants.
Interior Designer: Creative Clan Hospitality designers.
Nurse Call subcontractor: Medical Development Trading.
In Addition to Sub-Contractors Specialist in All Fields of Work.
Job Position : Construction Manager
Tasks:
*Finishing work (Block Work - plaster work (Internal and external plaster)
* MEP work (Firefighting works-Electrical Work Fire Alarm-A/C work -….ets).
*Coordination with the Orthopedic specialty Hospital and clinic center subcontractors.
2-Al Rumaizan Gold Center
Project Description:-
Commercial Building consists of Ground Floor, Mezz. Floor, 4 Typical Floors and Roof
Contract Value: 16 Million Dirham.
Project's Parts :
Client: Abdullah Al Rumaizan
Main Contractor: Adnan Contracting Company.
Local Consultant: Madinati Engineering Consultant.
In Addition to Sub-Contractors Specialist in All Fields of Work.
Job Position : Construction Manager
Tasks:
* Skelton Work (Concrete work for the vertical elements, Slabs and any required foundations for Tanks and A/C machines)
* Finishing work (Block Work - plaster work (Internal and external plaster)-Painting Work- Tiles work -Marble-Granite- Fit Out Works)
* MEP work (Firefighting works-Electrical Work Fire Alarm-A/C work -….ets).
3-Al Muhanna hotel
Project's Parts :
Client: Mohammaed H. Al Mohanna & Sons Group.
Operators: AURIS
Main Contractor: Adnan Contracting Company.
Local Consultant: Engineering Consortium- Consulting Engineers.
In Addition to Sub-Contractors Specialist in All Fields of Work.
Project Description:-
Hotel Building consists of 2Basement, Ground Floor, 1st Floor, GYM and 10 Typical Floors.
Contract Value: 40 Million Dirham.
Job Position : Construction Manager
Tasks:
*Finishing work (plaster work-Floor tiles-Wall cladding -false ceiling-gypsum Board-painting work-wallpaper-mill works - Fit Out Works )
* MEP work (Firefighting works-Electrical Work Fire Alarm-A/C work -….ets).
4-Emarites Transport Project at Warsan area
Project Description:-
Office Building (G+1F ), underground water tanks, steel structure building (12 Bay), extension for 8Bay and 4 bay Buildings, Parking shield and Boundary wall.
Contract Value: 30 Million Dirham.
Project's Parts :
Client: Emirates Transport.
Main Contractor: Adnan Contracting Company.
Local Consultant: Next Engineering Consultants.
In Addition to Sub-Contractors Specialist in All Fields of Work.
Job Position : Construction Manager
Tasks:
* Concrete work (shear wall-core wall &columns-Slabs- underground water tanks)
*Finishing work (Block Work - plaster work (Internal and external plaster)- Painting -ceramic tiles and Marble tiles )
* MEP work (Firefighting works-Electrical Work Fire Alarm-A/C work -….ets).
Following the work at the site (Concrete work (Vertical elements (shear wall-core wall &columns)-
Slabs)
1-Junauary 2012 up to Date:-
Working in NESMA & PARTNERS (Construction Department) MAKKA ELMOKARAMA
1-1Jabal Omar project
Project Description:-
(37 towers and Nesma & Partners response for Zones N2, N3, S1 & S2)
Team of Work: Client: Jabal Omar Development company.
Project Management Consultant:Hill International.
Master Plan Consultant:Ateliers Lion Architectes Urbanistes.
Main Contractor: Nesma & Partners (Construction Department)
Local Consultant:Khatib & Alami.
In Addition to Sub-Contractors Specialist in All Fields of Work.
Job Profile: Project Engineer for Zone S2 (Podium (4 commercial, 3 Basement), Tower H10 & H11)
Tasks:
*Following the work at the site (Concrete work (Vertical elements (shear wall-core wall &columns) -
Slabs) - Finishing work at Commercial (plaster work-ceramic tiles-false ceiling-gypsum
board-painting work)
* Coordination with the project Plan.
* Following the work with the site team and all the sub-contractors.
* (Coordination of the work with MEP department.
* Coordinate with the consultant to solve any problems at the site.
* Coordination with the QA/QC section for the inspections.
* Coordination with the project Plan & arrange the weekly work plan for all sub-contractors.
* Checking all the Material with the material coordinator and making the request for any material required.
* Coordination with the QS section and checking the extract for all the sub-contractors.
1- June 2008 up to December 2011:
Working in SEIF BIN DARWISH ( Construction Department) ABU DHABI (UAE)
1-1 Danet Abu Dhabi - Danet Tower - 150 million dirham
Project Description: -
(17 Stories Residential Building with 3 basements, Ground floor, Mezz. Floor, Roof Swimming Pool, Canopy & External Facade Curtain Wall & Aluminum Cladding System Facilities on elevations with landscaping areas)
Team of Work: Client: Seif Bin Darwish.
Local Consultant: Ewan Consultant.
Main Contractor: Seif Bin Darwish (Construction Department)
In Addition to Sub-Contractors Specialist in All Fields of Work.
Job Profile: Section Engineer.
Tasks:
*Following the work at the site (Raft foundation- Vertical elements (shear wall-core wall &columns) -Slabs) -Finishing work (plaster work-ceramic tiles-false ceiling-gypsum board-painting work -curtain wall)
* Coordination with the QA/QC section for the inspections.
* Checking all the Material with the material coordinator.
* Coordination with the project Plan.
* Coordination with the QS section.
1-2 Island city project. - 850 million dirham
Project Description:-
(4Hotel and service apartment with 3 Basement for Car parking, Swimming Pool, Canopy,
Aluminum Cladding &Facilities on elevations with landscaping areas)
Team of Work: Client: TDIC & Seif Bin Darwish.
Main Consultant: Meinhardt Consultant.
Local Consultant: El Burj Consultant.
Main Contractor: Seif Bin Darwish.
In Addition to Sub-Contractors Specialist in All Fields of Work.
Job Profile: Site Engineer.
Tasks:
*Following up the work at the site (Raft foundation- Vertical elements (shear wall-core wall &columns) -
Slabs)
* Coordination with the QA/QC section.
* Checking the Material with the material coordinator.
* Coordination with the project Plan.
* Coordination with the QS section.
2- December 2007 up to May 2008: (6 monthes)
Working in Kholifi Construction Enterprises (DOHA QATAR)
From December 2007 up to April 2008: -
Project Description:-
(1tower consists of 15 floors, 1ground floor and3 basements) . 70 million riyals.
Job Profile: Site Engineer.
Tasks:
* All Civil & Arch. Inspection & follow up works in the construction Field.
* Preparation of Snag Lists for the Contractor & Also Handing Over Document for the Project.
*Arrange the material at the site.
*Making the time sheet for the labors.
*Preparation for the plan of the work at the site.
3- August 2004 up to December 2007: (Alexandria-Egypt)
3-1 June 2007 up to December 2007: (Alexandria-Egypt)
Technical office with Lotus Company's construction
Job Profile: cost estimator engineer.
Tasks:
* Making breakdown structure for all items of the tenders.
* Co-ordinate with the subcontractors and making comparison between their offers.
* Checking of the Structural &the architectural Shop Drawings.
3-2 March 2006 up to June 2007: (Alexandria-Egypt)
Swiss company's construction
3-2-1 March 2006 up to June 2007:
Project Description:-
(1 villa consists of 2 floors with area 150m2)
Job: Site Engineer.
Tasks:
* following up the works in the construction Field.
* Check & Revision of contractor's payments.
* Checking of the Structural Shop Drawings of the Contractors.
* Preparation of Snag Lists for the Contractor & Also Handing Over Document for the Project.
*Arrange the material at the site.
*Making the time sheet for the labors.
*Preparation for the plan of the work at the site.
3-3-2 August 2004 up to March 2006: (Alexandria-Egypt)
El Nada Creet Company (ROAD CONSTRUCTION)
3-3-1 January 2005 up to March 2006:
Project Description:
(Road construction project consist of 60 cm base layer, 40 cm sub base layer, 9cm two layers of asphalt and two sidewalk)
Job profile: site engineer.
Task: *Following up the works in the construction Field.
*Arrange the material at the site
*Making the time sheet for the labors.
*Preparation for the plan of the work at the site.
*Quality control specification in site
*Making the request for the equipment for the work.
3-3-2 August 2004 up to January 2005:
Project Description:
(Road maintains for urban road)
Job profile: site engineer.
Task: *Following up the works in the construction Field.
*Arrange the material at the site
*Making the time sheet for the labors.
*Preparation for the plan of the work at the site.
*Quality control specification in site
*Making the request for the equipment for the work.
2016 Helwan University Cairo M.Sc. in Project Management and Construction ... Ongoing (start from Sep 2016).