Work Experience

Total years of experience :19 years, 3 Months

Team Leader Electrical Engineer at Shaker Consultancy Group
  • Egypt - Cairo
  • My current job since October 2021

Team Leader Electrical Engineer & Projects Coordinator of (TMG) Talaat Mostafa Group

As following Madinaty Projects
 B15 Project
 Privado Project
 B12 Project
 Central Park Project
 Town Center Project
 Commercials Centers Project
✓ Construction:
✓ Infrastructure

Electrical Design Supervision Engineer at Mohamed Turki Office - (MTMM)
  • Saudi Arabia - Jeddah
  • October 2013 to January 2021

Participate in Preparing Tender Documents of Projects Including B.O.Q and
Specification.
➢ Coordinate with the other mechanical systems for the desired electrical loads of
machines (pumps, chillers, air handling units Package units….etc.)
➢ Lighting Design: it calculated by lighting Dialux program and submitted to the
calculation of lux for projects. Our reference in design IESNA, SASO, lighting
catalogues.
➢ Power Design: it calculated by Ecodial program to calculate short circuit and
voltage drop, cable sizing and make single line diagram (SLD), HVAC power
drawing, our reference in design IEEE, NEC, Saudi Consolidated Electric
company(SCECO), catalogues.
➢ Lightning Protection & Grounding Design: our reference in design NEC, FURS
and catalogues.
➢ Design of light current systems (Data System, Telephone System, Fire Alarm
System, Master Antenna System, Nurse Cal System, CCTV, Access control
System, and Public Address System).
➢ Preparation of BOQ for the project.
✓ Infrastructure
▪ Supervision DHahiat Sumou Project (1.609.712.57 m2)

senior electrical engineer at The Ministry of Education
  • Saudi Arabia - Riyadh
  • December 2010 to April 2013

 Supervision and follow-up the electrical Work Site Progress.
 Follow up the timetable for the implementation of electrical Work Site Progress.
 Follow-up schedule for the supply of electrical materials.
 Review and adoption of the samples submitted for electrical materials.
 Review electrical materials and equipments supplied and compliance with specifications and approved samples.
 Ensure that there catalogs and warranty for electrical equipments.
 Review and adoption of Workshop drawings for the project.
 Supervision the testing required for electrical work after the end of implementation.
 Verification of industrial safety requirements.

Electrical Site Engineer at Qatar Engineering Company (QEC)
  • Qatar - Doha
  • September 2007 to September 2010

 Review the plans and electrical designs for the project.
 Installing and follow-up the electrical work (power-light current) site Progress according to the specifications.
 Testing and experience all the work and electrical installation of the projects.
 Preparation the Workshop drawings of the project and coordinate with the mechanical systems.
 Preparation As-Built drawings of the projects.

Electrical Site Engineer at Al Fahad Trading and Contracting Co
  • Saudi Arabia - Jeddah
  • August 2005 to April 2007

for operation and maintenance
Duties : of the King Abdul Aziz Hospital in Jeddah.
My scope of work
* Periodic maintenance of all hospital light current systems
* Maintenance operation
* Testing panel board, generator, control system, motors, cables
* Repair panel board, generator, control system, motors, cables
* Periodic maintenance of all hospital electrical systems
* Follow-up subcontractors accredited by the ministry for the maintenance of
different systems in hospital.
* Maintenance records and supervision of certified technicians.

Electrical Engineer at Nasr Company for Castings
  • Egypt
  • April 2003 to March 2005

 My work follow up the production process, product quality, maintenance operation, repair faults, write the reports about production operation during period of my work and account the spare parts in stores, submits proposals for the development production of factory.
 Installation panel board, motors, cables and connect generators
 Maintenance operation
 Testing panel board, generator, control system, motors, cables
 Repair panel board, generator, control system, motors, cables

Education

Bachelor's degree, Electrical Engineer
  • at بكالوريوس الهندسة الكهربية
  • May 2001

of

Specialties & Skills

CABLEADO
ENGINEERING
MICROSOFT OFFICE
PROGRESS
PROPOSAL WRITING
QUALITY
SUPERVISORY SKILLS
AutoCAD

Languages

Arabic
Native Speaker
English
Intermediate