Project Engineer “Electrical Division”
The Egyptian Ethylene & Derivatives
Total years of experience :10 years, 5 Months
الاسمSenior Electrical Engineer
تواريخ العمليوليو 2018 - الحالي
مدة العمل عامان 3 أشهر
الموقع الجغرافيالقاهرة, Egypt
Electrical Operations Department Head
Senior Electrical Engineer “Maintenance Division”
اسم الشركةRashed Petroleum Company (RASHPETCO)
تواريخ العملنوفمبر 2011 - نوفمبر 2013
مدة العمل عامان شهر واحد
الموقع الجغرافيEgypt
Commissioning & Start up a new Gas Plant "Burullus Gas Company Phase
VII" (Contain 3 Turbo-Generator 6.7 M.W each, 5 Turbo-Compressor &
2 M.W Emergency generators. With all auxiliaries, MV Switchgear
"Schneider", LV Switchgear "Schneider, ABB & Siemens ", 80 After cooler
Fans, 4 Air Compressor, 2 Air Dryer ………… etc.).
Work as maintenance Engineer at "Burullus Gas Company Phase V &
Page 2 of 5
Phase VII"
Transfer to Work as maintenance Engineer at "Burullus Gas Company
Scarab/Saffron" (Which contains 90% of Rashed Petroleum Company
total Production).
Work under GMS “Global Maintenance System” software & BG British
Gas company standards.
Commissioning & Start up “TSA after cooler fan project”- after3 year’s
delay-.
Project Engineer “Electrical Division”
اسم الشركةAbu Qir Petroleum Company AQP
تواريخ العملديسمبر 2010 - أكتوبر 2011
مدة العمل11 شهرا
الموقع الجغرافيEgypt
Engineering, Construction, Commissioning & Start up a new Gas platform
"NA/Q PII" (Contain 25 systems: Diesel Generator, UPS, MCC, Navigation
Aids, Crane, Methanol system …………… etc including cable tray erection,
cable laying………… etc ) for "Abu Qir Petroleum Company".
Revamping of WAQ platform electrical system (Replacement of: MCC
switch gear, protection panel, charger, UPS Power and control Cables &
cable tray).
Meadia (plant) Powerhouse package design -Engineering phase-.
Replacement of both diesel and gas engines at NA/Q PI platform -
Engineering phase-.
Replacement of PII platform battery chargers and systems-
Engineering & procurement phases-.
Replacement of cable trays at Abu Qir Petroleum Company
onshore/offshore.
NA/Q PI platform extension (lighting, cable & cable tray
modification at wells area) - Engineering, procurement &
construction phases-.
WAQ platform extension (lighting, cable & cable tray modification
at wells area) - Engineering, procurement & construction phases-.
Electrical Engineer
اسم الشركةAlexandria CARBON BLACK “ACB”
تواريخ العملنوفمبر 2007 - ديسمبر 2010
مدة العمل3 أعوام شهران
Assist in engineering phase for install a new Carbon plant “ACB 2”
Petrochemical in Kafer El Sheekh starting with complete 2 production lines
and complete power house.
Responsible for all electrical processes on the plant.
Deal with so many power sources \[ TG, Diesel Generators, Grid
incomer, Bus Coupler/Tie\] and its related faults such as AVR
problems; speed control cards; Governor ..... etc.
Deal with a lot of electrical systems such as (PLC, VFD, Soft starter,
UPS, PMCC & MCC Motors Feeders, Battery Charger, Fire alarm,
Different types of protection Relays.....etc
بكالوريوس هندسه كهربيه بتقدير جيد