eslam fawzy, Project Engineer “Electrical Division”

eslam fawzy

Project Engineer “Electrical Division”

The Egyptian Ethylene & Derivatives

Location
Egypt - Alexandria
Education
Bachelor's degree, الهندسة
Experience
10 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :10 years, 5 Months

Project Engineer “Electrical Division” at The Egyptian Ethylene & Derivatives
  • Egypt - Alexandria
  • My current job since November 2013

الاسمSenior Electrical Engineer
تواريخ العمل‏يوليو 2018 - الحالي
مدة العمل عامان 3 أشهر
الموقع الجغرافيالقاهرة, Egypt
Electrical Operations Department Head

Senior Electrical Engineer “Maintenance Division”
اسم الشركةRashed Petroleum Company (RASHPETCO)
تواريخ العمل‏نوفمبر 2011 - ‏نوفمبر 2013
مدة العمل عامان شهر واحد
الموقع الجغرافيEgypt
 Commissioning & Start up a new Gas Plant "Burullus Gas Company Phase
VII" (Contain 3 Turbo-Generator 6.7 M.W each, 5 Turbo-Compressor &
2 M.W Emergency generators. With all auxiliaries, MV Switchgear
"Schneider", LV Switchgear "Schneider, ABB & Siemens ", 80 After cooler
Fans, 4 Air Compressor, 2 Air Dryer ………… etc.).
 Work as maintenance Engineer at "Burullus Gas Company Phase V &
Page 2 of 5
Phase VII"
 Transfer to Work as maintenance Engineer at "Burullus Gas Company
Scarab/Saffron" (Which contains 90% of Rashed Petroleum Company
total Production).
 Work under GMS “Global Maintenance System” software & BG British
Gas company standards.
 Commissioning & Start up “TSA after cooler fan project”- after3 year’s
delay-.

Project Engineer “Electrical Division”
اسم الشركةAbu Qir Petroleum Company AQP
تواريخ العمل‏ديسمبر 2010 - ‏أكتوبر 2011
مدة العمل11 شهرا
الموقع الجغرافيEgypt
 Engineering, Construction, Commissioning & Start up a new Gas platform
"NA/Q PII" (Contain 25 systems: Diesel Generator, UPS, MCC, Navigation
Aids, Crane, Methanol system …………… etc including cable tray erection,
cable laying………… etc ) for "Abu Qir Petroleum Company".
 Revamping of WAQ platform electrical system (Replacement of: MCC
switch gear, protection panel, charger, UPS Power and control Cables &
cable tray).
 Meadia (plant) Powerhouse package design -Engineering phase-.
 Replacement of both diesel and gas engines at NA/Q PI platform -
Engineering phase-.
 Replacement of PII platform battery chargers and systems-
Engineering & procurement phases-.
 Replacement of cable trays at Abu Qir Petroleum Company
onshore/offshore.
 NA/Q PI platform extension (lighting, cable & cable tray
modification at wells area) - Engineering, procurement &
construction phases-.
WAQ platform extension (lighting, cable & cable tray modification
at wells area) - Engineering, procurement & construction phases-.

Electrical Engineer
اسم الشركةAlexandria CARBON BLACK “ACB”
تواريخ العمل‏نوفمبر 2007 - ‏ديسمبر 2010
مدة العمل3 أعوام شهران
 Assist in engineering phase for install a new Carbon plant “ACB 2”
Petrochemical in Kafer El Sheekh starting with complete 2 production lines
and complete power house.
 Responsible for all electrical processes on the plant.
 Deal with so many power sources \[ TG, Diesel Generators, Grid
incomer, Bus Coupler/Tie\] and its related faults such as AVR
problems; speed control cards; Governor ..... etc.
 Deal with a lot of electrical systems such as (PLC, VFD, Soft starter,
UPS, PMCC & MCC Motors Feeders, Battery Charger, Fire alarm,
Different types of protection Relays.....etc

Education

Bachelor's degree, الهندسة
  • at Alexandria University
  • August 2003

بكالوريوس هندسه كهربيه بتقدير جيد

Specialties & Skills