Surveyor
Al Alfia Holding
Total years of experience :30 years, 6 Months
2012
Projects : Khalifa Port Industrial Zone Project, - Roads, Bridges, Structures,
and Utilities (Roads and Infrastructure
Business Bay Towers Project, 3B+LG+UG+Podium+MEZZ. +48
Floors
Project : Jumairah Beach Residence Project, 4B+PODIUM+52
Floors
Subic-Clark-Tarlac Expressway Project (Roads and Infrastructure
Luisita Industrial Park 2 Project (Roads and Infrastructure
Kingswood Twin Towers 3B+LG+UG+MEZZ+28Floors
Science Park of the Philippines Project, (Roads and Infrastructure
Roads and Infrastructure Works:
Able to handle High Rise Buildings, Topographic survey, Road and Infrastructure works, Site development, Oil Refinery, Pipe Lines, Steel Structural works.
Responsible in all surveying works and As-Built of finished structures like bridges and culverts as required by the Consultants and Engineers.
Approving of Inspection Request if the site preparations are as per approved drawing.
Issuing (NCN) Non Conformance Notice or (NCR) Non Conformance Report if the contractors are not complying with the specification requirements as per QCS 2010/2014.
Site inspection of backfilling layer thickness as per QCS 2010/2014 specification requirements. (Earthworks)
Setting out of boundary fence and site inspection.
Preparing weekly and monthly progress report as clients required.
Taking site progress photos.
As-Built and volume calculation of Backfilling materials, Raw materials, and Processed materials.
Responsible in Structures, Infrastructures, and Utility works setting out.
GPS works Real Time Kenetic and Static Techniques.
Setting out of gantry posts for signage’s. Underground pipe lines, and light poles in the KPIZ main roads.
Khalifa Port Industrial Zone main roads, setting out of curb stones and concrete fixed barriers. Setting out of storm water drainage and spillways.
Vertical curve calculations and alignments.
Setting out of the bored piles for Bridges, Abutments, and Piers foundation.
Check wall alignments of abutment, culvert structures, roads alignment setting out and marking levels.
Worked independently or as part of team to provide Drawings for all buildings with coordination to the Engineers and Consultants. Land Survey Management and able to process survey data (coordinates) using AutoCAD for Structures setting out.
Civil and High Rise Building works:
Site inspection of Villas setting out of columns, walls, elevations, thickening and mat foundations prior to concrete blinding.
Checking setting out of columns, walls and verticality of shuttering’s, beam elevations and slab levels and limit prior to concrete pouring.
Supervision and checking of Facade and Architectural works setting out and Alignments and Levels.
Responsible as a Team Leader of the Surveyors.
Checking of subcontractor’s works and inspections.
Prepare and process data of (UCW) Unitized Curtain Wall and brackets for setting out.
Setting out of glass panels (Curtain Walls) alignment and leveling.
Setting out and Alignments, leveling of Screen Arms for external screen decors.
Responsible for all mullions and brackets setting out of terracotta tiles on roof towers (8 Towers).
As-built of finish installed mullions of terracotta tiles prior for inspection.
Able to prepare written survey reports.
Plotting as-built data in AutoCAD as required by the Engineers and Consultants.
Bored piles setting out at Maintenance and Service Facilities in Sheraton Park Project.
Worked at multi packages and responsible to all site survey works both structural and architectural. In charge of the survey finishing works at the packages: D1, D2, D3, D4, D5, D7, Package-H, and Package-F1 in Al Shaqab, Education City Project, Doha, Qatar.
Worked independently or as part of team to provide Drawings for all buildings with coordination to the Engineers and Consultants. Land Survey Management and able to process survey data (coordinates) using AutoCAD for Structures setting out.
of the high rise buildings in Jumairah Beach Residence Project -
courses: Baras, Canaman,